Title | Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008 |
||||
|
|||||
VIEW NOW |
Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008 (Number of pages: 64) (Publication Size: 790KB)
|
||||
Author(s) | Marti, P. | ||||
Description | The Palermo Wellfield subdrain was monitored from October 2007 through November 2008. The subdrain met or was near the remediation goal of lowering groundwater three feet below ground surface for the central and northern homes, but did not for the two southern homes. Some sediment is present in the central and southern subdrain cleanouts. Vegetation growth at the south end of the lagoon does not appear to be affecting the lagoon’s performance. Average PCE and TCE concentrations in samples from the subdrain are 15 ug/L and 24 ug/L. Concentrations in the treated water that discharges to the Deschutes River were below the remediation goals of 0.8 ug/L (PCE) and 2.7 ug/L (TCE). |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Deschutes, treatment, river, water, superfund, groundwater, Environmental Protection Agency | ||||
WATERSHED | Water Resource Inventory Area 13 Deschutes | ||||
RELATED PUBLICATIONS | Title:
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 2007 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003 Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.