Title | Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003 |
||||
|
|||||
VIEW NOW |
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003 (Number of pages: 35) (Publication Size: 480KB)
|
||||
Author(s) | Marti, P. | ||||
Description | Monitoring of the Palermo Wellfield subdrain system and treatment lagoon occurred in December 2002 and May 2003. The water table was lowered three feet or more below ground for the north and central homes below the bluff, but not at the two southern homes. Some sediment has accumulated in subdrain cleanout CO-4. Sediment deposition or scouring is not occurring in the rest of the subdrain or lagoon. PCE (23 ppb) and TCE (24 ppb) concentrations are highest in water samples from the south and central portion of the subdrain. Lagoon effluent PCE and TCE concentrations were higher than during previous monitoring. For better comparison to remediation goals, a sample station will be reestablished where lagoon effluent discharges to the Deschutes River. See Related Publication below for the addendum to this report. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | status report, Deschutes, report, wells, treatment, goals, river, water, monitoring, superfund, groundwater | ||||
WEB PAGE | Groundwater assessment in Washington state | ||||
WATERSHED | Water Resource Inventory Area 13 Deschutes | ||||
DATA | Environmental Information Management (EIM) #PALERMO |
||||
RELATED PUBLICATIONS | Title:
Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 2007 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005 Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004 Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.