Publications Home || Browse by topic || Browse by program || Ecology website

Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005

 
Publication number Date Published
05-03-027August 2005
VIEW NOW Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005 (Number of pages: 42) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Marti, P.
Description The Palermo Wellfield subdrain system was monitored in September 2004 and June 2005. The subdrain lowered groundwater three to five feet below ground surface for the north and central homes, but not the two southern homes. Sediment appears to be accumulating in subdrain cleanouts CO-4, CO-7, and CO-8. Sediment deposition or scouring does not appear to be occurring in the rest of the subdrain system. PCE (25 ppb) and TCE (23 ppb) concentrations continue to be highest in water samples from the south and central portions of the subdrain. Concentrations in the treated water that discharges to the Deschutes River were below the remediation goals of 0.8 ug/L (PCE) and 2.7 ug/L (TCE).
REQUEST A COPY
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

ADA Accessibility
The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188.
Visit Ecology’s website for more information.
Contact EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov
Keywords status report, Deschutes, report, treatment, goals, river, water, sediment, superfund, lead, groundwater
WATERSHED Water Resource Inventory Area 13 Deschutes
DATA Environmental Information Management (EIM) #PALERMO

RELATED PUBLICATIONS Title:

Palermo Wellfield Superfund Site: Subdrain System and Treatment Lagoon, Status Results, October 2007 and June and November 2008

Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, November 2006 and June 2007

Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2005 and June 2006

Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, October 2003 and May 2004

Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon Status Report, December 2002 and May 2003

Quality Assurance Project Plan: Addendum to Operation and Maintenance Manual of the Treatment Lagoon, Palermo Wellfield Superfund Site