Title (link to summary) | Number | Date (released or updated) |
Interim Aquifer Protection Report, Eastsound, San Juan County
| 12-03-269 | December 2008 |
San Juan County Annual Groundwater Monitoring Report
| 12-03-268 | December 2008 |
Quality Assurance Project Plan: Little Spokane River Fish Hatchery, Water Quality Monitoring for Nutrients
| 08-03-120 | December 2008 |
Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment
| 08-03-119 | December 2008 |
Lead and Copper Concentrations in North Creek, Gig Harbor
| 08-03-038 | December 2008 |
South Puget Sound Dissolved Oxygen Study: Interim Data Report - Appendix E
| 08-03-037appE | December 2008 |
South Puget Sound Dissolved Oxygen Study: Interim Data Report - Appendix C
| 08-03-037appC | December 2008 |
South Puget Sound Dissolved Oxygen Study: Interim Data Report
| 08-03-037 | December 2008 |
Upper Naches River Temperature Total Maximum Daily Load: Volume 1, Water Quality Study Findings
| 08-03-036 | December 2008 |
Sediment Quality in the Bays and Inlets of the San Juan Islands, Eastern Strait of Juan de Fuca, and Admiralty Inlet (2002-2003) - Summary Report
| 08-03-031 | December 2008 |
POSTER: Pesticides in Salmonid-Bearing Streams: Intensive Sampling in an Agricultural Drain
| 08-03-014 | December 2008 |
Ground Water Level Field Monitoring Report-Phase II, Alpowa and Asotin Creek Basins
| 12-03-311 | November 2008 |
Quality Assurance Project Plan: Goosmus Creek Metals and Conventional Parameters Water Quality Monitoring
| 08-03-118 | November 2008 |
High Summer Bacteria Concentrations in Streams
| 08-03-035 | November 2008 |
Sediment Quality Assessment of the Bays and Inlets of the San Juan Islands, Eastern Strait of Juan de Fuca, and Admiralty Inlet, 2002-2003
| 08-03-030 | November 2008 |
Samish Bay Fecal Coliform Bacteria Total Maximum Daily Load: Volume 1, Water Quality Study Findings
| 08-03-029 | November 2008 |
Appendix H. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings.
| 08-03-024AppH | November 2008 |
Appendix G. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings.
| 08-03-024AppG | November 2008 |
Appendix B-F. Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Water Quality Study Findings
| 08-03-024AppB-F | November 2008 |
Lake Whatcom Watershed Total Phosphorus and Bacteria Total Maximum Daily Loads: Volume 1. Water Quality Study Findings
| 08-03-024 | November 2008 |
Quality Assurance Project Plan: Hangman Creek Watershed Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design
| 08-03-117 | October 2008 |
Quality Assurance Project Plan: Screening for Blue-Green Algae Toxins in Lake Fish Tissues.
| 08-03-116 | October 2008 |
Mercury Sedimentation in Lakes in Western Whatcom County, Washington, USA and its Relation to Local Industrial and Municipal Atmospheric Sources.
| 08-03-034 | October 2008 |
Shelton Laundry and Cleaners, September 2007 through May 2008 Groundwater Monitoring Results
| 08-03-033 | October 2008 |
Focus on: Side-by-Side River and Stream Sampling Program
| 08-03-028 | October 2008 |
Hydrogeologic Evaluation – Same Body of Groundwater Determination: City of White Salmon Wells #1 and #2 and City of Bingen Wells
| 14-03-026 | September 2008 |
Installation of Monitoring Wells and Staff Gages in Lower Dungeness Watershed-Technical Memo
| 12-03-286 | September 2008 |
Quality Assurance Project Plan: High-resolution, Pore-water Sampling Near the Groundwater/Surface Water Interface
| 08-03-115 | September 2008 |
Quality Assurance Project Plan: Loading of Contaminants to the Lower Duwamish Waterway from Suspended Sediments in the Green River
| 08-03-114 | September 2008 |
Quality Assurance Project Plan: Receiving Water Study for Puget Sound Boatyards: Metals Translators and Hardness
| 08-03-108 | September 2008 |
Addendum to Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load
| 08-03-105ADD1 | September 2008 |
Focus on Modeling Dissolved Oxygen in Puget Sound
| 08-03-032 | September 2008 |
Measuring Mercury Trends in Freshwater Fish in Washington State: 2007 Sampling Results
| 08-03-027 | September 2008 |
Quality Assurance Project Plan: Groundwater-Surface Water Interactions Along Chumstick Creek and Mission Creek in WRIA 45, Chelan County, Washington
| 14-03-115 | August 2008 |
Response to Ecology Comments on Asotin and Alpowa Creek Phase I Hydrogeology Report
| 12-03-308 | August 2008 |
Quality Assurance Project Plan: Pharmaceuticals and Personal Care Products in Wastewater Treatment Systems
| 08-03-112 | August 2008 |
Focus on: Water Quality Modeling in Puget Sound
| 08-03-006 | August 2008 |
Quality Assurance Project Plan: Evaluation of Candidate Freshwater Sediment Reference Sites
| 08-03-111 | July 2008 |
Quality Assurance Project Plan: Burnt Bridge Creek Fecal Coliform Bacteria, Dissolved Oxygen, and Temperature Total Maximum Daily Load-Water Quality Study Design
| 08-03-110 | July 2008 |
Quality Assurance Project Plan: Union River Fecal Coliform Total Maximum Daily Load Effectiveness Monitoring
| 08-03-109 | July 2008 |
Pesticides in Salmonid-Bearing Streams: Intensive Sampling in an Agricultural Drain - A Cooperative Study by the Washington State Department of Ecology and the Washington State Department of Agriculture
| 08-03-020 | July 2008 |
River and Stream Water Quality Monitoring Report for Water Year 2007
| 08-03-019 | July 2008 |
Nitrate Trends in the Central Sumas-Blaine Surficial Aquifer
| 08-03-018 | July 2008 |
Webb Hill Biosolids Facility Hydrogeologic Investigation_Phase 2
| 12-03-279 | June 2008 |
Ambient Groundwater_Monitoring Program and Data Quality Management Plan
| 12-03-277 | June 2008 |
Dioxins, Furans, and other Contaminants in Surface Sediment and English Sole Collected from Greater Elliott Bay (Seattle)
| 08-03-017 | June 2008 |
Assessment of Sediment Toxicity near Post Point (Bellingham Bay)
| 08-03-016 | June 2008 |
Addendum to Quality Assurance Project Plan: Type N Experimental Buffer Treatment Study: Addressing Buffer Effectiveness on Riparian Inputs, Water Quality, and Exports to Fish-Bearing Waters in Basaltic Lithologies
| 07-03-103ADD1 | June 2008 |
Quality Assurance Project Plan: PBT Monitoring: Measuring Perfluorinated Compounds in Washington Rivers and Lakes
| 08-03-107 | May 2008 |
Quality Assurance Project Plan: Lead and Copper Concentrations In North Creek, Gig Harbor
| 08-03-106 | May 2008 |
Puyallup and White Rivers Dissolved Oxygen and Temperature Data Summary Report
| 08-03-013 | May 2008 |
History of Mercury in Selected Washington Lakes Determined from Age-Dated Sediment Cores: 2007 Sampling Results
| 08-03-012 | May 2008 |
Addendum #1 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program
| 07-03-104ADD1 | May 2008 |
Addendum #1 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores.
| 06-03-113ADD1 | May 2008 |
Montesano Groundwater Investigation of Leaking Underground Storage Tanks, October 2006 and March 2007
| 08-03-011 | April 2008 |
Lakewood Plaza Cleaners, June and October 2007 Groundwater Monitoring Results
| 08-03-010 | April 2008 |
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2007 Data Summary
| 08-03-009 | April 2008 |
Lake Ballinger Total Phosphorus Total Maximum Daily Load: Water Quality Attainment Monitoring Report
| 08-03-007 | April 2008 |
Groundwater Elevation Monitoring Report_Exempt Well Water Use Phase II_2007
| 12-03-313 | March 2008 |
Eastsound Water Supply Report and Recommendations
| 12-03-270 | March 2008 |
Fecal Coliform and Nitrate Transport in Shallow GW Discharging to Streams, Nooksack Indian Tribe
| 12-03-261 | March 2008 |
Quality Assurance Project Plan: Drayton Harbor Watershed Fecal Coliform Total Maximum Daily Load: Phase 1 Water Quality Study Design
| 08-03-105 | March 2008 |
Control of Toxic Chemicals in Puget Sound: Identification and Evaluation of Water Column Data for Puget Sound and Its Ocean Boundary
| 08-03-008 | March 2008 |
Snoqualmie River Basin Fecal Coliform Bacteria, Dissolved Oxygen, Ammonia-Nitrogen, and pH Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report
| 08-03-005 | March 2008 |
Quality Assurance Project Plan: West Medical Lake Total PCBs and Dioxin (2,3,7,8-TCDD) Total Maximum Daily Load
| 08-03-104 | February 2008 |
Quality Assurance Project Plan: Surface Sediment and Fish Tissue Chemistry in Greater Elliott Bay (Seattle)
| 08-03-103 | February 2008 |
Quality Assurance Project Plan: Potholes Reservoir Assessment of Dieldrin and Other Chlorinated Contaminants
| 08-03-101 | February 2008 |
American Plating Post-Interim-Action Groundwater Monitoring Results, April and September, 2007
| 08-03-004 | February 2008 |
Washington State Toxics Monitoring Program: Contaminants in Fish Tissue from Freshwater Environments in 2006
| 08-03-002 | February 2008 |
Data Summary Report: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study
| 08-03-001 | February 2008 |
Assessment of Baseflow in Small Streams of Dungeness Watershed, Technical Memo
| 12-03-281 | January 2008 |
Quality Assurance Project Plan: PCB and Dioxin Levels in Resident Fish from Washington Background Lakes and Rivers
| 08-03-102 | January 2008 |