Title (link to summary) | Number | Date (released or updated) |
Quality Assurance Project Plan: Monitoring for Nitrate Trends in the Central Sumas-Blaine Surficial Aquifer
| 02-03-084 | December 2002 |
Quality Assurance Project Plan: Squalicum Creek Toxics Screening Study
| 02-03-083 | December 2002 |
Quality Assurance Project Plan: Characterization of Groundwater Discharge to Lake Whatcom
| 02-03-082 | December 2002 |
Quality Assurance Project Plan: Shelton Cleaners and Laundry
| 02-03-078 | December 2002 |
Quality Assurance Project Plan: Verification of 1998 303(d) Listing for PCBs in Budd Inlet (Inner)
| 02-03-085 | October 2002 |
Quality Assurance Project Plan: Screening Survey of Mercury Levels in Edible Fish Tissue from Selected Lakes and Rivers of Washington State
| 02-03-080 | October 2002 |
Quality Assurance Project Plan: Mercury in Sediments from Lake Whatcom and Surrounding Lakes: Determination of Spatial and Temporal Patterns and Characterization of Tributary Inputs
| 02-03-079 | September 2002 |
Quality Assurance Project Plan: Woodland Creek Temperature TMDL
| 02-03-077 | September 2002 |
Quality Assurance Project Plan: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study
| 02-03-076 | August 2002 |
Quality Assurance Project Plan: Pesticide Reduction Evaluation for Cranberry Bog Drainage in the Grayland Area
| 02-03-072 | August 2002 |
Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River
| 02-03-070 | August 2002 |
Quality Assurance Project Plan: Lake Whatcom TMDL Study
| 02-03-074 | July 2002 |
Quality Assurance Project Plan: Norfolk CSO Sediment Cap Recontamination Phase 1 Inspection
| 02-03-073 | July 2002 |
Quality Assurance Project Plan: Pesticide Monitoring in the Mission Creek Basin
| 02-03-071 | July 2002 |
Addendum to Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load Year 1 Technical Study
| 02-03-069ADD | July 2002 |
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load, Year 1 Technical Study
| 02-03-069 | July 2002 |
Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla Riverp
| 02-03-068 | July 2002 |
Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring
| 02-03-067 | July 2002 |
Quality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load
| 02-03-066 | June 2002 |
Quality Assurance Project Plan: Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent the B&L Landfill, Milton, Washington
| 02-03-086 | April 2002 |
Quality Assurance Project Plan: Washington State Toxics Monitoring Program, Exploratory Monitoring of Toxic Contaminants in Edible Fish Tissue and Freshwater Environments of Washington State.
| 02-03-065 | April 2002 |
Quality Assurance Project Plan: Comparison of Toxicity in Lake Union Sediments Using Molecular DNA Techniques and Conventional Bioassay Measures
| 02-03-089 | March 2002 |
Quality Assurance Project Plan: Analysis of Fish from Long Lake, Washington, for PCBs and Selected Metals
| 02-03-088 | February 2002 |
Quality Assurance Project Plan: Arsenic Speciation in Puget Sound Fish and Crab
| 02-03-087 | January 2002 |