Publications Home



Quality Assurance Project Plans (QAPPs) (578 publications 1994-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1995 · 1994 ·

Title (link to summary)NumberDate (released or updated)
Quality Assurance Project Plan: Monitoring for Nitrate Trends in the Central Sumas-Blaine Surficial Aquifer 02-03-084December 2002
Quality Assurance Project Plan: Squalicum Creek Toxics Screening Study 02-03-083December 2002
Quality Assurance Project Plan: Characterization of Groundwater Discharge to Lake Whatcom 02-03-082December 2002
Quality Assurance Project Plan: Shelton Cleaners and Laundry 02-03-078December 2002
Quality Assurance Project Plan: Verification of 1998 303(d) Listing for PCBs in Budd Inlet (Inner) 02-03-085October 2002
Quality Assurance Project Plan: Screening Survey of Mercury Levels in Edible Fish Tissue from Selected Lakes and Rivers of Washington State 02-03-080October 2002
Quality Assurance Project Plan: Mercury in Sediments from Lake Whatcom and Surrounding Lakes: Determination of Spatial and Temporal Patterns and Characterization of Tributary Inputs 02-03-079September 2002
Quality Assurance Project Plan: Woodland Creek Temperature TMDL 02-03-077September 2002
Quality Assurance Project Plan: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study 02-03-076August 2002
Quality Assurance Project Plan: Pesticide Reduction Evaluation for Cranberry Bog Drainage in the Grayland Area 02-03-072August 2002
Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River 02-03-070August 2002
Quality Assurance Project Plan: Lake Whatcom TMDL Study 02-03-074July 2002
Quality Assurance Project Plan: Norfolk CSO Sediment Cap Recontamination Phase 1 Inspection 02-03-073July 2002
Quality Assurance Project Plan: Pesticide Monitoring in the Mission Creek Basin 02-03-071July 2002
Addendum to Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load Year 1 Technical Study 02-03-069ADDJuly 2002
Quality Assurance Project Plan: Wenatchee River Temperature, Dissolved Oxygen, and pH Total Maximum Daily Load, Year 1 Technical Study 02-03-069July 2002
Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla Riverp 02-03-068July 2002
Quality Assurance Project Plan: Mid Columbia and Snake Rivers Total Dissolved Gas TMDL Field Monitoring 02-03-067July 2002
Quality Assurance Project Plan: Walla Walla River Tributaries Temperature Total Maximum Daily Load 02-03-066June 2002
Quality Assurance Project Plan: Mobilization and Impacts of Arsenic Species and Selected Metals on a Wetland Adjacent the B&L Landfill, Milton, Washington 02-03-086April 2002
Quality Assurance Project Plan: Washington State Toxics Monitoring Program, Exploratory Monitoring of Toxic Contaminants in Edible Fish Tissue and Freshwater Environments of Washington State. 02-03-065April 2002
Quality Assurance Project Plan: Comparison of Toxicity in Lake Union Sediments Using Molecular DNA Techniques and Conventional Bioassay Measures 02-03-089March 2002
Quality Assurance Project Plan: Analysis of Fish from Long Lake, Washington, for PCBs and Selected Metals 02-03-088February 2002
Quality Assurance Project Plan: Arsenic Speciation in Puget Sound Fish and Crab 02-03-087January 2002