Title (link to summary) | Number | Date (released or updated) |
Standard Operating Procedure EAP130, Version 1.0: Short-term Continuous Data Collection with a Multiparameter Sonde, Part 2: Data Processing
| 19-03-230 | December 2019 |
Standard Operating Procedure EAP129, Version 1.0: Short-term Continuous Data Collection with a Multiparameter Sonde, Part 1: Field Procedures
| 19-03-229 | December 2019 |
Standard Operating Procedure EAP109, Version 1.1: Watershed Health Monitoring: Estimating Stream Discharge (Narrow Protocol)
| 19-03-226 | December 2019 |
Focus on: Puget Sound Streams Survey 2020
| 19-03-022 | December 2019 |
Measuring Lead in Suspended Particulate Matter from Washington State Rivers and Streams: 2016 Results
| 19-03-020 | December 2019 |
Quality Assurance Project Plan: Upper Yakima River Basin Water Quality Monitoring for Aquatic Life Parameters: Water Temperature, Dissolved Oxygen, and pH
| 19-03-112 | September 2019 |
Quality Assurance Project Plan: Non-Targeted Screening of Toxic Organics in Fish Tissue
| 19-03-111 | September 2019 |
Quality Assurance Project Plan: Assessing Sources of Toxic Chemicals Impacting Juvenile Chinook Salmon
| 19-03-110 | August 2019 |
Standard Operating Procedure EAP019, Version 1.2: Estimating Stream Flows Using a Flume
| 19-03-223 | July 2019 |
Final Environmental Impact Statement Short-term modification of the total dissolved gas criteria in the Snake and Columbia Rivers
| 19-10-019 | March 2019 |
Quality Assurance Project Plan: Newaukum River Monitoring of the Effectiveness of Best Management Practices (BMPs) for Sediment and Nutrient Reduction
| 18-03-101 | March 2019 |
Standard Operating Procedure EAP111, Version 1.14: Periphyton Sampling, Processing, and Identification in Streams and Rivers
| 19-03-207 | February 2019 |
Draft Environmental Impact Statement Short-term modification of total dissolved gas criteria in the Snake and Columbia Rivers
| 19-10-013 | January 2019 |