APM Terminals Pacific Ltd AKA Parcel 40
Current Status
Last updated July 2026
Between May 28 and June 29, 2026, Ecology held a public comment period on Agreed Order No. DE 22282 and a public participation plan. We did not receive any comments and finalized the documents on July 22, 2026.
Under this legal agreement, the Port of Tacoma's next deliverable is to provide Ecology with a draft remedial investigation work plan.
Cleanup Process
This site is a formal cleanup site under Washington’s cleanup law, the Model Toxics Control Act. Ecology supervises cleanup work and holds public comment periods throughout the cleanup process.
In Washington, polluters and/or property owners conduct and pay for cleanup. Ecology identified the Port of Tacoma as the potentially liable persons (PLP) that is responsible for investigating and cleaning up the site.
In July 2026, Ecology and the Port of Tacoma entered Agreed Order No. DE 22282, which requires the port to study the site, compare cleanup options, and suggest a cleanup to Ecology.
Site Description
Railroad companies owned the site from the early 1900s until 1980, using it for train maintenance and repair work. In the 1930’s, True’s Oil Company built a 1,250,000-gallon aboveground fuel storage tank and several pipelines used to move fuel in and out of the tank.
In 1979, the Port of Tacoma bought the site. The True’s oil tank was removed in about 1981. Underground pipelines may have been removed in 1984, but the extent of removal is not known at this time.
A marine terminal operator built a large service garage, Building 600, over the previous footprint of the True’s oil tank in the early 1980’s. Construction also included installing several fuel storage tanks:
- A 3,000-gallon waste oil underground storage tank on the south side of Building 600.
- A 20,000-gallon diesel underground storage tank and 1,000-gallon gasoline underground storage tank in a fuel shed near Building 600.
The 3,000-gallon waste oil tank was removed in 1998. The two tanks under the fuel shed were closed in place in 2023.
Currently, the site is paved with asphalt and concrete.
Contamination
Ecology will require more investigation to better understand the types and extent of contamination at this site. When completed, this study will be available for public comment.
So far, sampling found contamination from fuels in groundwater under and around Building 600.
Public Involvement Opportunities
You can subscribe to Ecology’s email list for updates about cleanup work in the Tacoma Tideflats and Commencement Bay area. Our staff will send you emails about public comment periods and public outreach events. Please reach out to the site contacts listed in the left sidebar if you have any questions!
To subscribe to automatic updates from our system, click the blue “Subscribe to this site” button at the top right corner of this webpage. Subscribers receive a weekly automated email whenever there’s an open comment period or a new document uploaded to this webpage. Read more about this feature on Ecology’s blog.
Documents 11
Legal 2
| Document Title | Document Date | Document Type |
| Parcel 40 Agreed Order DE 22282 | 7/22/2026 | Agreed Order |
| 2023.08.30_Final PLP and Waiver_Parcel 40_Signed | 8/30/2023 | Final Potentially Liable Person Status Letter |
Outreach Information 4
| Document Title | Document Date | Document Type |
| Parcel 40 Responsiveness Summary - 0 Comments | 7/22/2026 | Responsiveness Summary |
| Parcel 40 2026 Public Comment Period | 5/28/2026 | Fact Sheet\Public Notices |
| Parcel 40 Comment on Agreed Order and Public Participation Plan | 5/26/2026 | Fact Sheet\Public Notices |
| Parcel 40 Public Participation Plan | 5/26/2026 | Public Participation Plan |
Technical Reports 5
| Document Title | Document Date | Document Type |
| 2124 APM Terminals Pacific 20240424 SHARP | 4/24/2024 | Site Hazard Assessment and Ranking Process Report |
| APM Terminals Pacific LTD - Final Determination of Liability for Release | 8/30/2023 | Site Specific Administrative Document - Other (Administrative Correspondence) |
| APM Terminals Pacific LTD - Preliminary Determination of Liability for Release of Hazardous Substances | 8/10/2023 | Site Specific Administrative Document - Other (Administrative Correspondence) |
| Soil, Groundwater, and Tier II Vapor Intrusion Assessment Report | 1/27/2022 | Remedial Investigation Report |
| Letter to Port of Tacoma | 4/18/2000 | Site Specific Administrative Document - Other (Administrative Correspondence) |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 1
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Non-Halogenated Organics - Petroleum Products-Unspecified | C | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated