Facility Site ID: 8786341 Cleanup Site ID: 3380

Current Status

In 2018, pesticide (heptachlor epoxide) contaminated soil at the Webster Forest Nursery was excavated from an area on the southeast corner of the site near where a former leaking underground storage tank (UST) was located.  Since then, groundwater has been monitored to evaluate conditions at the site.

Monitoring wells located along the property line indicate that contamination has not migrated off the property and the contaminated area is centered around the location where the former UST was located.

Ecology received results of groundwater sampling events completed after the cleanup work in August 2018. Results indicate heptachlor epoxide is present above cleanup levels in groundwater located near the former UST.  Additional groundwater sampling is needed to determine if the excavation of contaminated soil will significantly reduce the concentration of pesticides in groundwater over time.  

Ecology will continue to monitor groundwater at the site to evaluate the effectiveness of removing the contaminated soil.

RELEVANT DOCUMENTS

Site Description

Webster Nursery is a tree nursery run by the Washington State Department of Natural Resources (WA DNR). The nursery is 300 acres and produces 10-15 million seedlings per year, which they sell to fund the nursery operation. Herbicides and fungicides are applied to soils and plants in early spring, summer, and early fall to control weeds and protect seedling from disease. 

On the southeast corner of the property, soil and groundwater were contaminated by a historical release of organochlorine pesticides from a leaking UST, which was located next to the warehouse building.    

Cleanup History

1978: The pesticide storage warehouse was built with a system of floor drains plumbed to a concrete underground storage tank (UST). During normal operations, pesticide was rinsed and washed into the tank.

1982: The concrete UST was replaced with a steel UST.

1996: The steel UST was full, found to be leaking, and removed along with 70 cubic yards of contaminated soil (about 7 dump trucks full).  Not all the contaminated soil could be removed because groundwater kept seeping in and filling the hole. Excavating more soil threatened the structural stability of the warehouse. Contaminated soil and water were taken offsite for proper recycling and disposal. Soil around the drains and pipes were tested and did not have any contamination.

1998: Ecology and WA DNR entered into an agreement to investigate the extent of contamination, consider cleanup alternatives, and develop a cleanup plan.

2001: Ecology and WA DNR entered into an agreement to finalize the cleanup plan, monitor the site, and prevent water from moving through the contaminated area.

2001-2016: Yearly groundwater monitoring showed heptachlor epoxide concentration in groundwater in the vicinity of the former UST was above the state cleanup level.

2014: WA DNR tested soil and groundwater to find the extent of contamination.

2016: Ecology and WA DNR entered into an agreement to remove more contaminated soil and monitor groundwater. Due to the lack of approval of a state capital budget, the cleanup action was  delayed.

2018: WA DNR removed about 145 cubic yards of contaminated soil, backfilled with clean soil, and covered it with grass. Not all of the contaminated soil could be removed due to structural constraints.

2018-present: Groundwater was monitored quarterly to determine the effectiveness of the cleanup action. 

Site use restrictions called institutional controls are in effect

Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.

Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.

Environmental Covenant

County Recording #: 3336349
County Recording Date: 2/15/2001

Restrictions/Requirements

  • Prevent the Reuse or Relocation of Site Soil
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
  • Soil
Legal 5
Document Title Document Date Document Type
2016 Agreed Order with Cleanup Action Plan 7/7/2016 Agreed Order
DNR Webster Nursery Final PLP Letter 6/14/2016 Final Potentially Liable Person Status Letter
Restrictive Covenant-Dept. of Natural Resources/Webster Nursery 2/15/2001 Environmental Covenant; Alternative Mechanism
Agreed Order No. DE 00 TCPSR-295 1/8/2001 Agreed Order
WA DNR Webster Nursery Agreed Order July 1999 7/1/1999 Agreed Order
Public Information 4
Document Title Document Date Document Type
DNR Webster Nursery Construction Progress Update 7/25/2018 Fact Sheet\Public Notices
2016 AO Responsiveness Summary 9/8/2016 Responsiveness Summary
2016 AO, FS, dCAP, SEPA Factsheet 6/29/2016 Fact Sheet\Public Notices
Public Participation Plan 6/6/2016 Public Participation Plan
State Environmental Policy Act 1
Document Title Document Date Document Type
WA DNR Webster Nursery SEPA checklist and DNS 7/6/2016 SEPA Documents
Technical Reports 44
Document Title Document Date Document Type
WA DNR Webster Nursery Sub-Slab Soil 12/10/2024 Site Specific Technical Document - other
WA DNR Webster Nursery - Sub-Slab Soil Investigation 10/8/2024 Remedial Investigation Report
WA DNR Webster Nursery Sub-Slab Soil Investigation Report Review, Third Quarter 2023 Groundwater Monitoring Results Review, and Next Steps at the Site 10/2/2024 Site Specific Administrative Document - other (Administrative correspondence)
WA DNR Webster Nursery - Sub-Slab Investigation Work Plan 4/4/2024 Remedial Investigation Work Plan
WA DNR Webster Nursery Sub-Slab Soil Investigation Work Plan Approval 4/3/2024 Site Specific Administrative Document - other (Administrative correspondence)
WA DNR Webster Nursery Sub-Slab Soil Investigation Work Plan Comments 2/22/2024 Site Specific Administrative Document - other (Administrative correspondence)
WA DNR Webster Nursery - Third Quarter 2023 Groundwater Monitoring Results 11/2/2023 Groundwater Monitoring Report
WA DNR Webster Nursery - Compliance Monitoring Plan Approval 6/14/2023 Site Specific Administrative Document - other (Administrative correspondence)
WA DNR Webster Nursery - Compliance Monitoring Plan 4/14/2023 Performance/Confirmational Monitoring Plan or Report
WA DNR Webster Nursery - Third Quarter 2022 Groundwater Monitoring Results 10/12/2022 Groundwater Monitoring Report
WA DNR Webster Nursery - Second Quarter 2022 Groundwater Monitoring Results 7/29/2022 Groundwater Monitoring Report
WA DNR Webster Nursery - First Quarter 2022 Groundwater Monitoring Results 4/5/2022 Groundwater Monitoring Report
WA DNR Webster Nursery - Fourth Quarter 2021 Groundwater Monitoring Results 1/13/2022 Groundwater Monitoring Report
Third Quarter 2021 Groundwater Monitoring Results, Webster Nursery Site 10/8/2021 Groundwater Monitoring Report
Second Quarter 2021 Groundwater Monitoring Results, Webster Nursery Site 6/15/2021 Groundwater Monitoring Report
First Quarter 2021 Groundwater Monitoring Results, Webster Nursery Site 4/30/2021 Groundwater Monitoring Report
WA DNR Webster Nursery - Notice of Change of Coodinator 3/23/2021 Site Specific Administrative Document - other (Administrative correspondence)
Fourth Quarter 2020 Groundwater Monitoring Results 1/29/2021 Groundwater Monitoring Report
Third Quarter 2020 Groundwater Monitoring Results, Webster Nursery Site 10/16/2020 Groundwater Monitoring Report
Compliance Monitoring Plan, Webster Nursery Site 8/11/2020 Performance/Confirmational Monitoring Plan or Report
Second Quarter 2020 Groundwater Monitoring Results, Webster Nursery Site 7/1/2020 Groundwater Monitoring Report
WA DNR Webster Nursery - Cleanup Action Completion Report 5/29/2020 Remedial Action Report
WA DNR Webster Nursery - First Quarter 2020 Groundwater Monitoring Results 4/19/2020 Groundwater Monitoring Report
Fourth Quarter 2019 Groundwater Monitoring Results, Webster Nursery Site 1/13/2020 Groundwater Monitoring Report
Third Quarter 2019 Groundwater Monitoring Results, Webster Nursery Site 10/16/2019 Groundwater Monitoring Report
May 2019 GW Monitoring Report 7/3/2019 Groundwater Monitoring Report
February 2019 GW Monitoring Report 4/18/2019 Groundwater Monitoring Report
November 2018 GW Monitoring Report 2/21/2019 Groundwater Monitoring Report
August 2018 GW Monitoring Report 2/21/2019 Groundwater Monitoring Report
Webster Nursery - CPM Change Letter 11/1/2018 Site Specific Administrative Document - other (Administrative correspondence)
September 2017 Groundwater Monitoring Results 11/9/2017 Groundwater Monitoring Report
Remedial Action Work Plan, Webster Nursery, 9805 Blomberg Street SW, Tumwater, WA 10/31/2017 Engineering Design Report
WA DNR Webster Nursery Feasibility Study 6/6/2016 Feasibility Study
WA DNR Webster Nursery draft Cleanup Action Plan 6/6/2016 Cleanup Action Plan
September 2014 Semiannual Groundwater Monitoring, Webster Nursery Site 12/5/2014 Groundwater Monitoring Report
Subsurface Investigation Results, Webster Nursery Site 7/30/2014 Remedial Investigation Report
Subsurface Investigation Activities Work Plan, Webster Nursery Site 4/16/2014 Remedial Investigation Work Plan
February 2014 Semiannual Groundwater Monitoring, Webster Nursery Site 3/27/2014 Groundwater Monitoring Report
September 3-4, 2013 DNR Webster Nursery Groundwater Sampling Event 11/26/2013 Groundwater Monitoring Report
August 13 - 15, 2012 DNR Webster Nursery Groundwater Sampling Event 10/11/2012 Groundwater Monitoring Report
WA DNR WEBSTER NURSERY Site Hazard Assessment 2/1/1999 Site Hazard Assessment Report
WA DNR Webster Nursery - Work Plan, Pesticide Storage Warehouse, Webster Nursery 1/1/1999 Remedial Investigation Work Plan
DNR-Webster Nursery Project Update 9/30/1997 Groundwater Monitoring Report
Private Well Sampling near DNR Webster Nursery 5/28/1997 Groundwater Monitoring Report
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 1

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Pesticides - Pesticides-Unspecified C RB
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.