Title | Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study |
||||
|
|||||
VIEW NOW |
Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study (Number of pages: 124) (Publication Size: 8MB)
|
||||
Author(s) | Roberts, M., B. Zalewsky, T. Swanson, L. Sullivan, K. Sinclair, and M. LeMoine | ||||
Description | This is the Quality Assurance Project Plan for the following study: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study | ||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | EAP Publications Coordinator at 564-669-3028 or EAPpubs@ecy.wa.gov | ||||
Keywords | Deschutes, Thurston, county, environmental, temperature, 303(d), section 303, study, river, plan, water, quality assurance, quality assurance project plan, assessment, sediment, quality, Total Maximum Daily Load, tribe, dissolved oxygen, fecal coliform, bacteria | ||||
WATERSHED | Water Resource Inventory Area 13 Deschutes | ||||
DATA | Environmental Information Management (EIM) #MROB0001 |
||||
RELATED PUBLICATIONS | Title:
Deschutes River, Percival Creek, and Budd Inlet Tributaries Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment TMDL: Water Quality Improvement Report and Implementation Plan Deschutes River, Capitol Lake, and Budd Inlet Total Maximum Daily Load Study: Supplemental Modeling Scenarios Focus on: Understanding the scientific process used for the Budd Inlet, Capitol Lake, and Deschutes River water cleanup plan POSTER: Anthropogenic Dissolved Oxygen Impacts in Budd Inlet: Comparing Influences from a Lake or Estuary Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Technical Report: Water Quality Study Findings POSTER: Modeling Dissolved Oxygen in Budd Inlet and Capitol Lake POSTER: Using Models to Compare and Prioritize Actions in Puget Sound: Who’s Modeling What and Why? |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.