Title (link to summary) | Number | Date (released or updated) |
Quality Assurance Project Plan—Metals in Packaging
| 15-04-014 | December 2015 |
Addendum 4 to Quality Assurance Project Plan: Freshwater Fish Contaminant Monitoring Program: 2015
| 15-03-126 | October 2015 |
Quality Assurance Project Plan: Cadmium and Metals in Children’s Jewelry
| 15-03-125 | October 2015 |
Addendum to Quality Assurance Project Plan: Edison Large On-Site Sewage System Groundwater Assessment
| 15-03-124 | October 2015 |
Quality Assurance Project Plan: Sammamish River Temperature and Dissolved Oxygen Total Maximum Daily Load Study Design
| 15-03-123 | October 2015 |
2015 Addendum 2 to Quality Assurance Project Plan: Long-Term Marine Waters Monitoring, Water Column Program
| 15-03-122 | September 2015 |
Addendum 3 to Quality Assurance Project Plan: Freshwater Fish Contaminant Monitoring Program
| 15-03-121 | September 2015 |
Quality Assurance Project Plan: Bellingham Bay Wood Waste Screening Survey
| 15-03-120 | September 2015 |
Quality Assurance Project Plan: Okanogan River Tributaries 303(d) pH Listings Verification Study
| 15-03-119 | September 2015 |
Quality Assurance Project Plan: A Long-Term Monitoring Plan to Assess Aquatic Life Uses on Railroad Creek Using Biological Assessment
| 15-03-116 | September 2015 |
Addendum 6 to Quality Assurance Project Plan: The Puget Sound Assessment and Monitoring Program: Sediment Monitoring Component, 2015 Monitoring at Long-term Stations
| 15-03-117 | August 2015 |
Quality Assurance Project Plan: Mercury in Polyvinyl Chloride and Polyurethane Novelty and Children’s Products
| 15-03-106 | August 2015 |
Addendum 7 to Quality Assurance Project Plan: The Puget Sound Assessment and Monitoring Program: Sediment Monitoring Component, 2015 Monitoring in the Bainbridge Basin
| 15-03-118 | July 2015 |
Addendum 1 to Quality Assurance Project Plan: Chemicals of High Concern to Children in Children’s Clothing, Footwear, and Accessories
| 15-03-114 | July 2015 |
Quality Assurance Project Plan: Olequa Creek, Dry Season Flow Characterization in Winlock, WA, Lewis County
| 15-10-021 | June 2015 |
Quality Assurance Monitoring Plan: Puget Sound Temperature, Salinity, In Situ Fluorescence, Turbidity, and Colored Dissolved Organic Matter Marine Water Monitoring using the Victoria Clipper IV Ferry Vessel
| 15-03-115 | June 2015 |
Addendum 5 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores
| 15-03-113 | June 2015 |
Quality Assurance Project Plan: Tieton River and Lower Naches River Temperature Study
| 15-03-112 | June 2015 |
Quality Assurance Project Plan: Spokane River PCBs and other Toxics Long Term Monitoring at the Spokane Tribal Boundary
| 15-03-111 | May 2015 |
Addendum 3 to Quality Assurance Project Plan: A Trend Monitoring Component for Organic PBTs in the Washington State Toxics Monitoring Program
| 15-03-110 | May 2015 |
Quality Assurance Project Plan: Salish Sea Acidification Model Development
| 15-03-109 | May 2015 |
Quality Assurance Project Plan: North Fork Palouse River Fecal Coliform Bacteria Data Evaluation
| 15-03-108 | April 2015 |
Addendum to Quality Assurance Project Plan: Wenatchee River PCB and DDT Source Assessment
| 15-03-107 | April 2015 |
Addendum to Quality Assurance Project Plan: Little Klickitat River Temperature Total Maximum Daily Load Steady State to Continuous QUAL2Kw Conversion
| 15-03-105 | April 2015 |
Addendum 2 to Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Design
| 15-03-104 | March 2015 |
Quality Assurance Project Plan: Shade Monitoring for the Wenatchee Basin Water Quality Restoration Project
| 15-10-049 | January 2015 |
Quality Assurance Project Plan: Salish Sea Dissolved Oxygen Modeling Approach: Sediment-Water Interactions
| 15-03-103 | January 2015 |
2015 Addendum to Quality Assurance Monitoring Plan: Long-Term Marine Waters Monitoring, Water Column Program
| 15-03-102 | January 2015 |
Quality Assurance Monitoring Plan: Long-Term Marine Waters Monitoring, Water Column Program, 2015
| 15-03-101 | January 2015 |
Addendum #1 to Quality Assurance Project Plan Phthalates and Metals in Children's Products
| 12-07-023a | January 2015 |
Addendum #1 to Quality Assurance Project Plan Parabens and Metals in Children's Cosmetic and Personal Care Products
| 12-07-021a | January 2015 |