Pacific Functional Fluids LLC Tacoma
Facility Site ID:
1239
Cleanup Site ID:
4329
Finalized Periodic Review And Focused Feasibility Study
Ecology reviewed comment on the September 2022 Periodic Review and the April 2022 Site Remedy Report/Updated Focused Feasibility Study. No changes were made to the documents as a result of the comment received.
Comment Response
Periodic review
Site remedy report and updated focused feasibility study (FS)
Part 1
Part 2
The periodic review found that the dual phase extraction system is limited in its ability to remove remaining groundwater contamination. We reviewed other technologies and proposed replacing it with biosparge technology and institutional controls.
Next steps
Now that we have finalized the periodic review and updated the Focused Feasibility Study, we will use the findings to revise the site Cleanup Action Plan that implements the selected cleanup remedy. We will hold a public notice period on the revised CAP before making a final decision.
Comment Response
Periodic review
Site remedy report and updated focused feasibility study (FS)
Part 1
Part 2
The periodic review found that the dual phase extraction system is limited in its ability to remove remaining groundwater contamination. We reviewed other technologies and proposed replacing it with biosparge technology and institutional controls.
Next steps
Now that we have finalized the periodic review and updated the Focused Feasibility Study, we will use the findings to revise the site Cleanup Action Plan that implements the selected cleanup remedy. We will hold a public notice period on the revised CAP before making a final decision.
Site Information
Lilyblad is no longer in business. It began operations at the site in 1972 as a distributor of gasoline, diesel, solvents, and packaged petroleum products. Over time, it also became involved in various recycling operations, including recycling of spent solvent and waste fuels. Recycling operations ended at the site in 1988.
These activities resulted in contamination of portions of the site. Site investigations show contamination to a depth of about 8 feet. Contaminants of concern (COCs) from these activities include volatile and semi-volatile organic compounds, and total petroleum hydrocarbons in the soil and groundwater. The COCs moved with the groundwater to parts of the Port of Tacoma Road and adjacent properties.
These activities resulted in contamination of portions of the site. Site investigations show contamination to a depth of about 8 feet. Contaminants of concern (COCs) from these activities include volatile and semi-volatile organic compounds, and total petroleum hydrocarbons in the soil and groundwater. The COCs moved with the groundwater to parts of the Port of Tacoma Road and adjacent properties.
Cleanup History
1995 | Ecology, Lilyblad, and Sol-Pro sign Agreed Order No. DE 95HS-S292. The order requires Lilyblad and Sol-Pro to do a remedial investigation/feasibility study (RI/FS) and cleanup action plan (CAP). |
2000 | Ecology issues the first amendment to the Agreed Order, requiring Lilyblad to carry out interim action to contain and treat groundwter flowing off its property. |
2006 | Ecology issues a second amendment to the Agreed Order, reassigning the preparation of the FS and CAP to Ecology. Ecology issues Enforcement Order No. 3334, requiring Lilyblad to stop interim remedial actions, submit revised groundwater monitoring plans, and take other actions to continue monitoring. |
2007 | Ecology issues Enforcement Order No. DE 4514 to implement the CAP. Lilyblad does not comply with the order. Ecology issues a notice to incur a lien on the property to recover the cost of cleanup. |
Documents 25
Legal 5
Document Title | Document Date | Document Type |
Lilyblad Petroleum Enforcement Order No. 4515 | 6/29/2007 | Enforcement Order |
Lilyblad Petroleum Second Amendment to Agreed Order | 8/11/2006 | Agreed Order |
Lilyblad Petroleum Enforcement Order No. 3334 | 5/26/2006 | Enforcement Order |
Lilyblad Petroleum Agreed Order First Amendment DE95HS-S292 | 8/17/2000 | Agreed Order Amendment |
Lilyblad Petroleum Agreed Order DE 95HS-S292 | 10/30/1995 | Agreed Order |
Public Information 4
Document Title | Document Date | Document Type |
Lilyblad-RevisedCAPandSEPA Determination of Non-Significance-Responsiveness Summary | 10/11/2024 | Responsiveness Summary |
Lilyblad Updated Focused Feasibility Study 2022 Response to comment | 4/20/2023 | Responsiveness Summary |
Lilyblad Petroleum Fact Sheet Cleanup Action Plan, Enforcement Order, and SEPA Determination of Non-Significance | 7/1/2007 | Fact Sheet\Public Notices |
Lilyblad Petroleum Fact Sheet Interim Remedial Actions | 1/1/2001 | Fact Sheet\Public Notices |
State Environmental Policy Act 4
Document Title | Document Date | Document Type |
SEPA Determination of Non-Significance for 2024 revised CAP | 7/2/2024 | SEPA Documents |
SEPA Checklist for March 2024 revised CAP | 7/2/2024 | SEPA Documents |
Lilyblad Petroleum SEPA DNS | 7/1/2007 | SEPA Documents |
Lilyblad Petroleum SEPA Checklist | 3/5/2007 | SEPA Documents |
Technical Reports 12
Document Title | Document Date | Document Type |
Lilyblad Revised Cleanup Action Plan | 3/20/2024 | Cleanup Action Plan |
Lilyblad Petroleum Periodic Review | 9/15/2022 | Periodic Review (5 Year) |
Lilyblad Updated Focused Feasibility Study - Part 2 | 4/20/2022 | Feasibility Study |
Lilyblad Updated Focused Feasibility Study - Part 1 | 4/20/2022 | Feasibility Study |
Lilyblad Cleanup Wastewater Discharge Permit | 8/15/2014 | Site Specific Technical Document - other |
Lilyblad Operation and Maintenance Manual | 4/28/2011 | Operation and Maintenance Plan |
Lilyblad PSCAA Air Registration Form | 7/1/2009 | Site Specific Technical Document - other |
Lilyblad Site Remedial Action Quality Assurance Project Plan | 6/30/2009 | Sampling and Analysis Plan |
Cultural Resource Assessment | 2/26/2009 | Site Specific Technical Document - other |
Lilyblad Remedial System Schematics | 10/30/2008 | Site Specific Technical Document - other |
Lilyblad Petroleum CAP | 10/19/2007 | Cleanup Action Plan |
Lilyblad Petroleum Focused Feasibility Study | 1/12/2007 | Feasibility Study |
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Contaminants 7
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Other Contaminant - Base/Neutral/Acid Organics | C | C | ||||
Halogenated Organics - Halogenated Organics | C | C | ||||
Metals - Metals Priority Pollutants | C | |||||
Non-Halogenated Organics - Petroleum Products-Unspecified | C | C | ||||
Non-Halogenated Organics - Phenolic Compounds | C | |||||
Non-Halogenated Organics - Non-Halogenated Solvents | C | C | ||||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | B | B |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.