Frederickson Industrial Park

Facility Site ID: 1301 Cleanup Site ID: 3557

Site Description

CLICK TO ENLARGE - Frederickson Industrial Park Cleanup Site
CLICK TO ENLARGE - Frederickson Industrial Park Cleanup Site
The Frederickson Industrial Park site is located at 18001 Canyon Road East, in Puyallup. From 1935 to 1976, many different owners produced explosives on the site. Between 1976 and 1986, the site was used for timber cutting, a lumber mill, and log storage. Since 1990, the site has been used to make aircraft parts.

Site groundwater is contaminated with carbon tetrachloride (CTC). In the past, CTC was used as a cleaning solvent or in fire control. It can be harmful to human health and the environment, so cleanup is important.

In 1995, Ecology identified former property owners Mallinckrodt US, LLC (Mallinckrodt) and Olin Corporation (Olin) as the potentially liable persons (PLPs) responsible for cleaning up the site.



Past Cleanup:

The PLPs and other owners conducted many studies and partial cleanup actions during the past 25 years. These included:

  • Studying soil, groundwater, and soil vapor.
  • Removing soil, waste, and debris.
  • Treating groundwater.
  • Monitoring groundwater. In 1999, samples showed that CTC levels around the site were low enough that there was no risk to human health through vapor intrusion. Vapor intrusion is when chemicals move from soil and groundwater into air in buildings.

In 2000, more studies showed the contaminant plume reaching well water supplies for nearby homes and businesses. By 2007, public water service was brought into the area near the plume and properties with private wells were connected to the public supply.

As a result, there is very little risk of human exposure to the contamination.

Site Cleanup

Recent groundwater samples show:
  • The area of contaminated groundwater (called a plume) getting smaller.
  • The contamination level decreasing.
Because cleanup is now happening naturally, the Cleanup Action Plan (CAP) calls for cleaning up remaining CTC by natural processes (called natural attenuation). Under the cleanup plan:
  • PLPs will conduct groundwater monitoring to make sure CTC keeps decreasing.
  • Ecology and the PLPs will mail information to properties above the plume at least every five years. Ecology will also send a mailing 1.5 to 2 years prior to the first periodic review.
  • The current property owner will record an environmental covenant that prohibits the use of contaminated groundwater on the property.
New off-property groundwater wells are prohibited unless approved by Tacoma Water (the site is in the Pierce County Urban Growth Area).

Current Status

Ecology held a public comment period on proposed cleanup plans from January 23 - February 24, 2014. The following documents were available for review:
  • An Agreed Order — a legal agreement that requires the Olin Corporation (Olin) and Mallinckrodt US, LLC (Mallinckrodt) to clean up the site. Exhibits to the Agreed Order include:
    • The Cleanup Action Plan (CAP)-- outlines the cleanup.
    • A Compliance Monitoring Work Plan -- tells how, where, and when groundwater sampling will be done.
  • Remedial Investigation/Feasibility Study (RI/FS) — describes the nature and extent of contamination and compares cleanup options.  
  • Public Participation Plan — describes the tools Ecology will use to inform the public and gather feedback.
Ecology received no comments during the comment period. The PLPs will now do the monitoring described in the CAP and work plan.

Ecology held an open house on the Frederickson Industrial Park cleanup plans on February 5, 2014. The open house was held at the Frederickson Elementary School. Site Manager Guy Barrett provided a presentation on the site's cleanup and staff were available to answer questions. View the open house presentation.

Public Involvement

Ecology wants to keep you involved! You will have the chance to review and comment on key documents during the cleanup process. To join the site mailing list, contact Natalie Graves at the email address or phone number listed to the right

Site use restrictions called institutional controls are in effect

Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.

Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.

Environmental Covenant

County Recording #: 0419311021
County Recording Date: 8/1/2014

Restrictions/Requirements

  • Restrict Land Use

Restricted Media

  • Groundwater
Legal 5
Document Title Document Date Document Type
Fredrickson Industrial Park - Notification of Transfer of Title (APN 041931-1-022) 12/11/2023 Environmental Covenant; Alternative Mechanism - Amendment
The Boeing Company (Lease ID:WA-PLP24-50-LND (EHS Covenant)) 9/13/2021 Environmental Covenant; Alternative Mechanism - Amendment
Fredrickson Industrial Park - Environmental Covenant 7/21/2014 Environmental Covenant; Alternative Mechanism
Fredrickson Industrial Park - Agreed Order with Cleanup Action Plan and Monitoring Work Plan 2/27/2014 Agreed Order
Fredrickson Industrial Park - Agreed Order 4/1997 4/3/1997 Agreed Order
Public Information 3
Document Title Document Date Document Type
Fredrickson Industrial Park - Cleanup Plans Open House Presentation 2/5/2014 Multimedia
Fredrickson Industrial Park - Comment Period Factsheet 1/15/2014 Fact Sheet\Public Notices
Fredrickson Industrial Park - Public Participation Plan 1/14/2014 Public Participation Plan
Technical Reports 21
Document Title Document Date Document Type
Ninth Compliance Groundwater Monitoring Report 4/10/2023 Groundwater Monitoring Report
Topsoil Characterization Report 8/5/2022 Site Specific Technical Document - other
Frederickson Industrial Park - Ecology Response to Request for Reduced Groundwater Monitoring 4/14/2022 Site Specific Administrative Document - other (Administrative correspondence)
Eighth Annual Compliance Groundwater Monitoring Report 1/24/2022 Groundwater Monitoring Report
Soil Management Plan Fredrickson Industrial Park 1/14/2022 Site Specific Technical Document - other
Fredrickson Industrial Park - Address Change for Boeing - Landlord/Sublord 9/13/2021 Site Specific Administrative Document - other (Administrative correspondence)
Phase II Limited Subsurface Investigation Boeing Fredrickson - Parcel 2/Parcel 3 8/27/2021 Site Specific Technical Document - other
Fredrickson Industrial Park - Seventh Annual Compliance Groundwater Monitoring Report 10/14/2020 Groundwater Monitoring Report
Fifth Annual Compliance Groundwater Monitoring Report 4/23/2019 Groundwater Monitoring Report
Fredrickson Industrial Park - Annual MNA Groundwater Monitoring Report-2018 4/23/2019 Groundwater Monitoring Report
Fredrickson Industrial Park - Fourth Annual Compliance Groundwater Monitoring Report 2/12/2018 Groundwater Monitoring Report
Fredrickson Industrial Park - Fourth Annual Compliance Groundwater Monitoring Report 2/12/2018 Groundwater Monitoring Report
Fredrickson Industrial Park - Third Annual Compliance Groundwater Monitoring Report 3/15/2017 Groundwater Monitoring Report
Fredrickson Industrial Park - Third Annual Compliance Groundwater Monitoring Report 3/15/2017 Groundwater Monitoring Report
Fredrickson Industrial Park - Second Annual Compliance Groundwater Monitoring Report 5/3/2016 Groundwater Monitoring Report
Fredrickson Industrial Park - Sampling Comparison Evaluation Work Plan 3/29/2016 Performance/Confirmational Monitoring Plan or Report
Fredrickson Industrial Park - First Annual MNA GW Monitoring Letter Report 13Mar15 3/13/2015 Groundwater Monitoring Report
Fredrickson Industrial Park - Draft Cleanup Action Plan 11/1/2013 Cleanup Action Plan
Fredrickson Industrial Park - Compliance Monitoring Work Plan 9/1/2013 Cleanup Action Plan
Fredrickson Industrial Park - work plan RE22-2 Soil TPH Investigation 5/1/2012 Remedial Investigation Work Plan
Fredrickson Industrial Park - RI/FS 3/28/2012 Remedial Investigation / Feasibility Study
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 8

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Other Contaminant - Base/Neutral/Acid Organics B B
Halogenated Organics - Halogenated Organics C C S
Metals - Metals Priority Pollutants B B
Metals - Metals - Other B
Halogenated Organics - Polychlorinated biPhenyls (PCB) B
Non-Halogenated Organics - Phenolic Compounds B
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons B
Other Contaminant - Conventional Contaminants, Organic B
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.