BMW Seattle Pike Street
BMW Seattle is on Capitol Hill in Seattle, King County. The buildings were constructed in the early 1900s to house auto part sales and manufacturing. Though the buildings were constructed independently, their current arrangement is one building with partitions between the sales and service areas.
Petroleum hydrocarbon contamination as diesel and motor oil (TPH-Dx), petroleum hydrocarbon contamination as diesel (TPH-D), lead, and cadmium were all detected above MTCA Method A cleanup levels in soils at the Site.
The petroleum contaminated soil leaching to groundwater pathway was evaluated using Ecology’s Interim Guidance. This evaluation indicated that the type and concentration of TPH present at the Site did not pose a threat to groundwater. Lead and cadmium concentrations exceeded the criteria for human direct contact and protection of groundwater. However, site conditions mitigate both risks.
Environmental Covenant Removal
Voluntary Cleanup Program
This site was cleaned up under our Voluntary Cleanup Program, which provides technical help to owners of contaminated sites.
Voluntary Cleanup Program customers pay fees to cover our costs for technical help and reviewing cleanup reports. Sites in this program must meet the same cleanup standards as the sites Ecology manages under legal orders.
Documents 12
Legal 2
Document Title | Document Date | Document Type |
Environmental Covenant termination BMW Seattle Pike St | 8/19/2016 | Environmental Covenant; Alternative Mechanism - Removed |
BMW Seattle Pike St Environmental Covenant | 12/15/1998 | Environmental Covenant; Alternative Mechanism |
Public Information 2
Document Title | Document Date | Document Type |
BMW Seattle Pike -Environmental Covenant Removal Fact Sheet (Spanish) | 11/20/2015 | Fact Sheet\Public Notices |
BMW Pike Street - Removal of the Environmental Covenant Fact Sheet | 11/20/2015 | Fact Sheet\Public Notices |
Technical Reports 5
Document Title | Document Date | Document Type |
Construction Completion Report | 10/16/2014 | Final Cleanup Action Report |
Cleanup Action Plan | 9/20/2013 | Cleanup Action Plan |
Feasibility Study Report | 9/20/2013 | Remedial Investigation / Feasibility Study |
RI Report | 1/31/2013 | Remedial Investigation Report |
BMW Seattle - Periodic Review | 11/1/2008 | Periodic Review (5 Year) |
Voluntary Cleanup Program 3
Document Title | Document Date | Document Type |
BMW Seattle Pike Street - No Further Action | 1/2/2015 | VCP Opinion on Site Cleanup – NFA |
Ecology's Opinion Letter For FS Work Plan | 11/13/2013 | Voluntary Cleanup Program Opinion – Other |
BMW Seattle Pike St VCP NFA Letter | 1/25/1999 | VCP Opinion on Site Cleanup – NFA |
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
Contaminants 5
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | RB | |||||
Metals - Lead | RB | |||||
Non-Halogenated Organics - Petroleum-Diesel | RB | |||||
Non-Halogenated Organics - Petroleum-Gasoline | RB | |||||
Non-Halogenated Organics - Petroleum-Other | RB |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated