Independent Metals Plant 2
Current Status
Last Updated: March 2023
Language Information Below
Información en español incluida
中文信息包括
Có thông tin bằng tiếng Việt
ព័ត៌មានជាភាសាខ្មែររួមបញ្ចូល
Fact Sheets | Information in English |
Información en español incluida |
中文信息包括 |
Có thông tin bằng tiếng Việt |
ព័ត៌មានជាភាសាខ្មែររួមបញ្ចូល |
Blog | "Cleaning up: Two Lower Duwamish sites move forward with cleanup" |
Comments | Response Summary |
Cleanup moves forward with Remedial Investigation
Ecology held a 30-day public comment period (October 24 – November 22, 2022) on a Public Participation Plan and a legal agreement called an Agreed Order with Silver Bay Logging, Inc. and RJ and BA LLC, the Potentially Liable Persons (PLPs), for the 816 S. Kenyon St Cleanup Site located in Seattle’s South Park Neighborhood.
Ecology has reviewed and considered the public comments received on the documents and will finalize both documents.
Based on Ecology’s evaluation of the comments, updates were made to the Agreed Order “Finding of Facts” section.
Ecology has also reviewed and considered the comments on the Public Participation Plan (PPP) and adjusted our outreach plan for the first 2023 Lower Duwamish Waterway (LDW) cleanup site.
Ecology will finalize the PPP. We will continue to evaluate the community’s use of this adjusted LDW site outreach plan for the next comment period and will amend the PPP, as needed, based on community engagement.
The Independent Metals Plant 2 is continuing the cleanup process. Ecology will make the future Remedial Investigation, Feasibility Study, and Cleanup Action Plan available for public review and comment.
Ecology is finalizing the following documents:
- Agreed Order: legal document that requires the PLPs to investigate environmental conditions, complete a Remedial Investigation (RI), Feasibility Study (FS), and a draft Cleanup Action Plan (dCAP).
- Public Participation Plan: describes how Ecology will inform the community about site activities and ways to become involved.
Language Information
Para ver una copia de este boletín informativo en español visite: https://bit.ly/Ecology-IndependentMetals, llame (360) 407-6097, o envié un correo electrónico a preguntas@ecy.wa.gov
如需瀏覽中文版的概況介紹,請訪問網址https://bit.ly/Ecology-IndependentMetals,致電
(425) 457-3842,或發送電子郵件到sunny.becker@ecy.wa.gov
Để xem bản sao của tờ thông tin này bằng tiếng Việt, hãy truy cập: https://bit.ly/Ecology-IndependentMetals, gọi (360) 790-4730, hoặc gửi email đến Lngu461@ecy.wa.gov
ដើម្បីមើលឯកសារថតចម្លងនៃអង្គហេតុនេះជាភាសាខ្មែរ សូមចូលមើល៖ https://bit.ly/Ecology-IndependentMetals, ហៅទូរស័ព្ទលេខ (425) 324-5901, ឬអ៊ីម៉ែល ian.fawley@ecy.wa.gov
Why This Site Matters
General Cleanup Process
What Happens Next?
Ecology is finalizing the documents and the PLPs will proceed with the Remedial Investigation, Feasibility Study, and create a Draft Cleanup Action Plan for public review.
Each of those steps will require a public comment period. The graphic above shows these different stages of cleanup. Sometimes multiple stages occur in one public comment period.
Public Participation
This plan includes information for the public regarding opportunities to get involved in the Site cleanup process. The outreach activities and mechanisms presented reflect Ecology’s current plans for keeping the public informed and for receiving information and comments from the public.
Site Information
Site Background
The site is generally located in the area of 816 and 836 S. Kenyon Street, 803 and 811 S. Chicago St., 7760 and 7808 8th Ave. S, in Seattle’s South Park neighborhood. It is approximately 3.06 acres and is adjacent to the Lower Duwamish Waterway (LDW). It includes six King County tax parcels and a 0.23 acre portion of the South Chicago Street right-of-way which the PLP’s lease from the City of Seattle.
Currently, there are two light-industrial buildings on the site, as well as an office building and a marine dock located on the south bank of the Duwamish Waterway.
Past uses of the site include
- 1929 – approx. 1961: A former gasoline station occupied the northern portion of the site.
- 1976 – 1995: Workboats Northwest, a work boat manufacturer, had operations on the site.
- 2006 – 2014: Independent Metals had a scrap and recycled metal handling facility on the site.
- 1996 – 2015: Silver Bay Logging used the area as transfer site for processed logs.
Site investigation and contamination
In 2009 the Site was placed on our Confirmed and Suspected Contaminated Sites list. A Site Hazard Assessment concluded PCB’s and metals were released from the site and added them to existing National Pollutant Discharge Elimination System monitoring. A 2015 Site Hazard Assessment assigned the site a ranking of 4 (using a rank from 1 to 5, with 1 being most hazardous and 5 being the least).
In 2017, five underground storage tanks for petroleum products, and associated piping, were identified and removed from the site. This process included initial soil and groundwater investigations. In 2015 Ecology completed an Initial Site Assessment. Reports and documents from these investigations can be found on in the Document section.
Investigations at the site show the following hazardous substances in the soil:
Diesel and oil-range total petroleum hydrocarbons (TPH)
- Carcinogenic polycyclic aromatic hydrocarbons (cPAHs)
- Tetrachloroethene (PCE)
- Trichloroethene (TCE)
- Polychlorinated biphenyls (PCBs)
- Metals, including arsenic, cadmium, and lead
These contaminants are present at levels that exceed allowable standards under the state’s cleanup law, the Model Toxics Control Act (MTCA), and must be addressed.
Documents 23
Legal 6
Document Title | Document Date | Document Type |
Independent Metals Plant 2 - Minor Change to Agreed Order No DE 21418 | 2/21/2024 | Agreed Order Amendment |
Independent Metals Plant 2 / Silver Bay Final Agreed Order | 12/28/2022 | Agreed Order |
Independent Metals Plant 2 - RJ BA LLC Final PLP Letter | 5/11/2022 | Final Potentially Liable Person Status Letter |
Independent Metals Plant 2 - Silver Bay Logging Final PLP Letter | 5/11/2022 | Final Potentially Liable Person Status Letter |
Independent Metals Plant 2 - Early Notice Letter (Silver Bay Logging) | 3/11/2014 | Early Notice Letter |
Independent Metals Plant 2 - Early Notice Letter (O'Farrell) | 2/24/2014 | Early Notice Letter |
Leaking Underground Storage Tank 1
Document Title | Document Date | Document Type |
Independent Metals Plant 2 (AKA Silver Bay Logging) - UST Closure & Site Assessment Report | 8/8/2017 | LUST - Site Assessment Report |
Public Information 8
Technical Reports 8
Document Title | Document Date | Document Type |
Independent Metals Plant 2 - RIWP Updates | 10/14/2024 | Remedial Investigation Work Plan |
Independent Metals Plant 2 - SHARP | 8/14/2024 | SHARP Report |
Independent Metals Plant 2 - Final Remedial Investigation Work Plan | 5/11/2023 | Remedial Investigation Work Plan |
Independent Metals Plant 2 - SHA Rank Letter | 10/30/2015 | Site Specific Administrative Document - other (Administrative correspondence) |
Independent Metals Plant 2 - Site Hazard Assessment | 10/27/2015 | Site Hazard Assessment Report |
Independent Metals Plant 2 - SHA Notification Letter | 12/15/2014 | Site Specific Administrative Document - other (Administrative correspondence) |
Independent Metals Plant 2 - HWTR Close Out Letter | 11/6/2014 | Site Specific Administrative Document - other (Administrative correspondence) |
Independent Metals Plant 2 - Initial Investigation Field Report | 2/21/2014 | Initial Investigation Report |
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
-
South Park Branch / Seattle Public Library8604 Eighth Avenue SouthSeattle, 98108This location may only have print documents available during open comment periods.
Contaminants 17
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals - Other | S | S | C | |||
Halogenated Organics - Polychlorinated biPhenyls (PCB) | S | S | C | |||
Pesticides - Halogenated Pesticides | S | |||||
Non-Halogenated Organics - Phenolic Compounds | S | S | S | |||
Halogenated Organics - Dioxins/Furans | S | S | S | |||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | S | S | S | |||
Halogenated Organics - Halogenated Solvents | C | C | ||||
Metals - Arsenic | C | C | ||||
Non-Halogenated Organics - Organotins | S | S | ||||
Metals - Lead | C | C | C | |||
Metals - Mercury | S | S | C | |||
Non-Halogenated Organics - Benzene | S | S | ||||
Non-Halogenated Organics - Other Non-Halogenated Organics | S | S | S | |||
Non-Halogenated Organics - Petroleum-Diesel | C | C | S | |||
Non-Halogenated Organics - Petroleum-Gasoline | S | S | ||||
Non-Halogenated Organics - Petroleum-Other | C | C | S | |||
Pesticides - Non-Halogenated Pesticides | S |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated