Site Description
Spieker Properties (Spieker) purchased the Bellefield Office Park in March 1995. The initial purchase did not include the Building N (Aspenwood) and O (Magnolia) properties. Dalton, Olmsted & Fuglevand, Inc. (DOF), on behalf of Spieker, submitted an Independent Remedial Action Report (IRAP) (DOF 1995) to the Washington State Department of Ecology (Ecology) in June 1995. Based on the IRAP, Spieker requested a ‘No Further Action’ (NFA) letter for the initially purchased property which did not include Buildings N and O. Ecology requested that additional ground-water sampling and analysis be completed after reviewing the IRAP. The results of the requested work are documented in a report prepared by DOF (1996). Based on the IRAP and the results of the additional Ecology requested work, and after a restrictive covenant was recorded, Ecology issued an NFA letter for the initially purchased property on November 1, 1996. This 1996 cleanup is subject to a separate Periodic Review.
Voluntary Cleanup Program
This site was cleaned up under our Voluntary Cleanup Program, which provides technical help to owners of contaminated sites.
Voluntary Cleanup Program customers pay fees to cover our costs for technical help and reviewing cleanup reports. Sites in this program must meet the same cleanup standards as the sites Ecology manages under legal orders.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 2
Environmental Covenant
Restrictions/Requirements
- Maintain/Protect Monitoring System
- Ongoing Maintenance of Remedy
- Prohibit New Building Construction
- Prohibit Soil Disturbance
- Restrict All Ground Water Extraction/Well Installation
- Restrict Domestic Ground Water Extraction/Well Installation
Restricted Media
- Groundwater
- Soil
Environmental Covenant
Restrictions/Requirements
- Maintain/Protect Monitoring System
- Ongoing Maintenance of Remedy
- Prohibit New Building Construction
- Prohibit Soil Disturbance
- Restrict All Ground Water Extraction/Well Installation
- Restrict Domestic Ground Water Extraction/Well Installation
Restricted Media
- Groundwater
- Soil
Documents 18
Legal 1
Document Title | Document Date | Document Type |
BELLEFIELD OFFICE PARK BLDG N & O - Covenant | 3/24/1999 | Environmental Covenant; Alternative Mechanism |
Technical Reports 16
Voluntary Cleanup Program 1
Document Title | Document Date | Document Type |
Bellfefield Office Park BLDG N & O NW0161 NFA Letter | 5/21/1999 | VCP Opinion on Site Cleanup – NFA |
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
Contaminants 4
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | R | |||||
Halogenated Organics - Polychlorinated biPhenyls (PCB) | R | |||||
Non-Halogenated Organics - Petroleum Products-Unspecified | R | |||||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | R |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R