Washington Central Railroad Roundhouse
Facility Site ID:
545
Cleanup Site ID:
4945
What Is The Yakima Railroad Area?
The Washington Central Railroad Roadhouse is a part of the Yakima Railroad Area (YRRA). The Yakima Railroad Area is approximately six square miles in size and includes parts of the cities of Yakima and Union Gap. The Yakima Railroad Area groundwater is contaminated with tetrachloroethylene (PCE or PERC) from past industrial use, and is centered around the railroad/industrial corridor of the greater Yakima area.
PCE is a manufactured chemical that is widely used for dry cleaning of fabrics and for metal-degreasing. It is also used to make other chemicals and is used in some consumer products.
Exposure to PCE can be from the air, chemical use, soil, or water. PCE can affect the kidneys, liver, nervous system, and reproductive system, as well as unborn children. There is also an increased risk of certain types of cancer.
More information about potential sources of PCE and associated health risks can be found on the Agency for Toxic Substances and Disease Registry (ATSDR) website.
PCE is a manufactured chemical that is widely used for dry cleaning of fabrics and for metal-degreasing. It is also used to make other chemicals and is used in some consumer products.
Exposure to PCE can be from the air, chemical use, soil, or water. PCE can affect the kidneys, liver, nervous system, and reproductive system, as well as unborn children. There is also an increased risk of certain types of cancer.
More information about potential sources of PCE and associated health risks can be found on the Agency for Toxic Substances and Disease Registry (ATSDR) website.
Site Description
The site was used as a railroad engine maintenance and repair facility for over 100 years starting in the late 1800s. PCE was possibly used to degrease engine parts as part of the engine maintenance.
In 1993, PCE contamination was found in the soil.
The site is now owned and operated by Burlington Northern Santa Fe. The roundhouse and maintenance facility has been demolished and is not currently being used.
In 1993, PCE contamination was found in the soil.
The site is now owned and operated by Burlington Northern Santa Fe. The roundhouse and maintenance facility has been demolished and is not currently being used.
What's Been Done?
In 1996, an environmental firm investigated the same area that was sampled in 1993. There was no PCE found during this investigation. In fact, no contamination was found above state cleanup levels.
In December 1996, the site was added to Ecology’s Hazardous Sites List with a ranking of “1”. Sites on the Hazardous Sites List are a priority for Ecology, and have completed a Site Hazard Assessment (SHA). A SHA provides information about the environmental risk of the site. Risk is based on the amount of contaminants, how toxic they are, and how easily they can come in contact with people and the environment. Sites are ranked relative to each other on a scale of “1” to “5”; with a rank of “5” being the lowest.
In December 1996, the site was added to Ecology’s Hazardous Sites List with a ranking of “1”. Sites on the Hazardous Sites List are a priority for Ecology, and have completed a Site Hazard Assessment (SHA). A SHA provides information about the environmental risk of the site. Risk is based on the amount of contaminants, how toxic they are, and how easily they can come in contact with people and the environment. Sites are ranked relative to each other on a scale of “1” to “5”; with a rank of “5” being the lowest.
What's Happening Now?
Based on a review of the site files, Ecology has determined the site does not pose a threat to human health or the environment. Ecology made a no further action determination in January 2018. The site has been removed from the Hazardous Sites List.
Documents 25
Legal 2
Document Title | Document Date | Document Type |
Washington Central Railroad Roundhouse No Further Action letter | 1/24/2018 | NFA Letter – non-VCP |
WCRR Roundhouse PLP ltr | 9/1/1998 | Final Potentially Liable Person Status Letter |
Public Information 1
Document Title | Document Date | Document Type |
Washington Central Railroad Roundhouse Fact Sheet for Proposed Removal from HSL | 3/29/2018 | Fact Sheet\Public Notices |
Technical Reports 22
Document Title | Document Date | Document Type |
WA Central Railroad Roundhouse - YRRA GW Sampling Event | 10/15/2024 | Site Specific Administrative Document - other (Administrative correspondence) |
WA Central Railroad Roundhouse - YRRA GW Sampling Event | 3/25/2024 | Site Specific Administrative Document - other (Administrative correspondence) |
WA Central Railroad Roundhouse - YRRA GW Sampling Event | 9/29/2023 | Site Specific Administrative Document - other (Administrative correspondence) |
Yakima Railroad Area PCE Groundwater Quality Monitoring Data Summary 2021 | 5/1/2023 | Groundwater Monitoring Report |
WA Central Railroad Roundhouse - YRRA GW Sampling Event | 4/7/2023 | Site Specific Administrative Document - other (Administrative correspondence) |
WA Central Railroad Roundhouse - YRRA GW Sampling Event | 9/30/2022 | Site Specific Administrative Document - other (Administrative correspondence) |
Yakima Railroad Area PCE Groundwater Monitoring Data Summary 2018 - 2020 | 4/1/2022 | Groundwater Monitoring Report |
Washington Central Railroad Roundhouse - Groundwater Sampling Event - YRRA | 4/1/2022 | Site Specific Administrative Document - other (Administrative correspondence) |
WA Central Railroad Roundhouse - YRRA Groundwater Sampling Event | 9/29/2021 | Site Specific Administrative Document - other (Administrative correspondence) |
Washington Central Railroad Roundhouse - YRRA Groundwater Sampling | 3/29/2021 | Site Specific Administrative Document - other (Administrative correspondence) |
Washington Central Railroad Roundhouse - Groundwater Sampling Event | 11/6/2020 | Site Specific Administrative Document - other (Administrative correspondence) |
Washington Central Railroad Roundhouse - YRRA Groundwater Sampling Event | 9/25/2019 | Site Specific Administrative Document - other (Administrative correspondence) |
Washington Central Railroad Roundhouse - GW Sampling 4/22 - 4/26/2019 | 4/16/2019 | Site Specific Administrative Document - other (Administrative correspondence) |
Yakima Railroad Area PCE Groundwater Monitoring Data Summary 2017 | 7/1/2018 | Groundwater Monitoring Report |
Yakima Railroad Area PCE Groundwater Monitoring Data Summary 2014 - 2015 | 7/1/2016 | Groundwater Monitoring Report |
YRRA Groundwater Quality Performance Monitoring 2013 | 10/1/2014 | Groundwater Monitoring Report |
WCRR UPRR Tank 4 NFA recommendation | 7/8/2013 | Site Specific Administrative Document - other (Administrative correspondence) |
WCRR Roundhouse - Site Hazard Assessment | 12/31/1996 | Site Hazard Assessment Report |
WCRR Roundhouse Site Remediation summary rpt | 8/22/1996 | Remedial Action Report |
UPRR WCRR Roundhouse UST Final Closure rpt | 4/3/1992 | Remedial Action Report |
UPRR WCRR Roundhouse UST Site Assessment Nov 1990 | 11/1/1990 | Site Specific Technical Document - other |
UPRR WCRR Roundhouse UST SIte Assessment Sept 1990 | 9/1/1990 | Site Specific Technical Document - other |
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Places to see print documents
-
Central Regional Office1250 W Alder StUnion Gap, 98903-0009Please schedule an appointment to view print documents at this location.
Contaminants 3
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Halogenated Organics - Halogenated Solvents | B | |||||
Metals - Lead | B | |||||
Non-Halogenated Organics - Petroleum-Diesel | RB |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.