Atofina Chem 3009 Taylor Way Log Yard
Site Description
The log sort yard was originally contaminated with wood waste and heavy metals. Slag from the former Asarco smelter in North Tacoma was used to build the road bed for the log sort yard. The slag leached heavy metals such as arsenic, copper, lead and zinc into the soil.
In 1992, Arkema’s parent company, Pennwalt Chemicals, created a landfill for the contaminated soils, wood waste, and slag. This was done under a Consent Decree (legal agreement) with Ecology. This landfill was covered over and lined to keep contaminants from escaping. The Port of Tacoma removed the landfill to make the area safer for reuse.
Site Cleanup
In 2016, Ecology and the Port of Tacoma entered into a legal agreement to begin long term monitoring at the Atofina Chem 3009 Taylor Way Log Yard site.
Previously, the port began an Interim Action (partial) cleanup under a 2008 Agreed Order (legal agreement) with the Department of Ecology. The Interim Action work plan was for the clean up of a toxic-waste landfill.
The first phase of this Interim Action was completed in Spring 2009. During a second phase of interim actions, the port removed remaining soils that were contaminated with arsenic.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 2
Environmental Covenant
Restrictions/Requirements
- Ongoing Maintenance of Remedy
- Restrict Access
- Restrict Land Use
Restricted Media
- Soil
Environmental Covenant
Restrictions/Requirements
- Maintain/Protect Monitoring System
- Ongoing Maintenance of Remedy
- Restrict Land Use
Restricted Media
- Groundwater
- Soil
Documents 20
Legal 8
Document Title | Document Date | Document Type |
Environmental Covenant | 8/24/2016 | Environmental Covenant; Alternative Mechanism |
Atofina Chem 3009 Taylor Way Agreed Order 2016 - Final | 7/7/2016 | Agreed Order |
Atofina Chem 3009 Taylor Way Log Yard Agreed Order and Interim Action Scope of Work | 11/10/2008 | Agreed Order |
Atochem 3009 Taylor Way Stipulation Amending Consent Decree | 9/21/1993 | Consent Decree - Amendment |
Atochem 3009 Taylor Way Restrictive Covenant | 1/18/1993 | Environmental Covenant; Alternative Mechanism |
Atochem 3009 Taylor Way Order Entering Consent Decree | 12/11/1992 | Consent Decree |
Arkema Inc Environmental Covenant | 1/18/1992 | Environmental Covenant; Alternative Mechanism |
Atofina Chem 3009 Taylor Way Log Yard Consent Decree | 6/24/1987 | Consent Decree |
Public Information 4
Document Title | Document Date | Document Type |
Cleanup Resuming Phase 2 Interim Action | 3/11/2013 | Fact Sheet\Public Notices |
Atofina Chem 3009 Taylor Way Log Yard Responsiveness Summary | 12/10/2008 | Responsiveness Summary |
Atofina Chem 3009 Taylor Way Log Yard Public Participation Plan | 10/1/2008 | Public Participation Plan |
Atofina Chem 3009 Taylor Way Log Yard Fact Sheet Agreed Order for Cleanup Available | 10/1/2008 | Fact Sheet\Public Notices |
State Environmental Policy Act 2
Document Title | Document Date | Document Type |
SEPA Checklist | 3/11/2013 | SEPA Documents |
DNS | 3/11/2013 | SEPA Documents |
Technical Reports 6
Document Title | Document Date | Document Type |
2024 Annual Monitoring Summary Report | 7/25/2024 | Groundwater Monitoring Report |
Dunlop Mound Site - 2022 Annual Groundwater Monitoring Report | 2/3/2023 | Groundwater Monitoring Report |
2020 Annual Groundwater Monitoring Report | 5/11/2021 | Groundwater Monitoring Report |
2017 Annual Monitoring Summary Report | 3/16/2018 | Performance/Confirmational Monitoring Plan or Report |
Remedial Investigation | 9/21/2015 | Remedial Investigation Report |
As-Built Report, Agreed Order DE 6129 | 4/6/2015 | Remedial Action/As-Built Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 2
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Metals - Metals Priority Pollutants | S | S | R | |||
Metals - Arsenic | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated