Title | State Environmental Policy Act Draft Programmatic Environmental Impact Statement for Green Hydrogen Energy Facilities in Washington State |
||||
|
|||||
VIEW NOW |
State Environmental Policy Act Draft Programmatic Environmental Impact Statement for Green Hydrogen Energy Facilities in Washington State (Number of pages: 242) (Publication Size: 10359KB)
Draft PEIS Green Hydrogen Cover Letter 01072025 (2 pages) (121KB) Draft PEIS Green Hydrogen PEIS Summary Jan2025 (13 pages) (1MB) Draft PEIS Green Hydrogen Appendix A Scoping Report (22 pages) (1MB) Draft PEIS Green Hydrogen Appendix B Tribal Rights Interests and Resources (30 pages) (1MB) Draft PEIS Green Hydrogen Appendix C Environmental Justice (105 pages) (4MB) Draft PEIS Green Hydrogen Appendix D Earth Resources (48 pages) (3MB) Draft PEIS Green Hydrogen Appendix E Air Quality and Greenhouse Gases (104 pages) (3MB) Draft PEIS Green Hydrogen Appendix F Water Resources (59 pages) (3MB) Draft PEIS Green Hydrogen Appendix G Biological Resources (92 pages) (3MB) Draft PEIS Green Hydrogen Appendix H Energy and Natural Resources (35 pages) (2MB) Draft PEIS Green Hydrogen Appendix I Environmental Health and Safety (77 pages) (3MB) Draft PEIS Green Hydrogen Appendix J Noise and Vibration (32 pages) (1MB) Draft PEIS Green Hydrogen Appendix K Land Use (41 pages) (4MB) Draft PEIS Green Hydrogen Appendix L Aesthetics Visual Quality (36 pages) (2MB) Draft PEIS Green Hydrogen Appendix M Recreation (30 pages) (3MB) Draft PEIS Green Hydrogen Appendix N Historic and Cultural Resources (39 pages) (1MB) Draft PEIS Green Hydrogen Appendix O Transportation (44 pages) (3MB) Draft PEIS Green Hydrogen Appendix P Public Services and Utilities (51 pages) (1MB) Draft PEIS Green Hydrogen Appendix Q Cumulative Impacts (107 pages) (2MB)
|
||||
Author(s) | Shorelands and Environmental Assistance Program | ||||
Description | The Washington State Legislature directed Ecology to prepare a non-project environmental review of green hydrogen energy facilities in Washington by June 30, 2025. Revised Code of Washington (RCW) 43.21C.535 requires Ecology to assess and disclose the probable significant adverse environmental impacts and related mitigation measures for green hydrogen energy facilities. The Draft PEIS has been prepared to satisfy the requirements of the Washington State Environmental Policy Act (SEPA). The purpose of the Draft PEIS is to evaluate potential impacts and mitigation at a broad level. The PEIS considers potential impacts from general types of green hydrogen energy facilities; it is not site-specific or for a specific project. The types of energy facilities evaluated in the PEIS would require additional, more detailed, project-level environmental review prior to permit decisions. |
||||
REQUEST A COPY
|
The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.
ADA Accessibility The Department of Ecology is committed to providing people with disabilities access to information and services by meeting or exceeding the requirements of the Americans with Disabilities Act (ADA), Section 504 and 508 of the Rehabilitation Act, and Washington State Policy #188. Visit Ecology’s website for more information. |
||||
Contact | Clean Energy Coordination at 360-407-6600 or cleanenergy@ecy.wa.gov | ||||
Keywords | clean energy, Programmatic Environmental Impact Statements, State Environmental Policy Act, Green hydrogen, Green hydrogen energy facilities, House Bill 1216, battery energy storage systems, Department of Ecology |
Copyright © Washington State Department of Ecology. See https://ecology.wa.gov/About-us/Accountability-transparency/Our-website/Copyright-information.