Facility Site ID: 10587741 Cleanup Site ID: 628

A Puget Sound Initiative site - Reaching the goal of a healthy, sustainable Puget Sound.             

Background

Historic industrial activities at the TC Systems, Inc. Site included a historic shingle mill (Jamison Shingle Mill) as far back as 1914, a fiberglass boat construction company, and manufacturing of windows and railings for boats. TC Systems and its predecessors (Marpac and Tri-Coatings) operated at the Site from 1980 to 2010.  From 1984 to 2010, TC Systems supported the aviation and boating industries by chemically treating and painting metal parts.

TC Systems completed the facility closure in compliance with Ecology’s Dangerous Waste Regulations, (see Chapter 173-303 WAC). The facility closure included, in part, disposal of all dangerous waste and removal of all equipment associated with the metal finishing operations associated with the facility. The current tenant's operations consist of marine services which include marine related retail sales and a machine/repair shop.

A ongoing cleanup investigations at the site began in April 2011. The investigations have identified contamination in both groundwater and soil. Primary contaminants include metals, petroleum, and semivolatile organic compounds (SVOCs) including polycyclic aromatic hydrocarbons (PAHs) and polychlorinated biphenyls (PCBs).

Status

Ecology, Norton Industries, Inc. and TC Systems, Inc. entered into an Agreed Order for cleanup on August 5, 2010. The work to be performed under the Agreed Order will include a Remedial Investigation and Feasibility Study (RI/FS) work plan to evaluate the nature and extent of Site contamination, development of an RI/FS Report and a draft cleanup action plan. 
  • An RI/FS work plan was completed in February 2011.
  • Field RI - The initial phase of RI sampling (i.e., soil and groundwater sampling) was completed in late April/early May 2011.  An RI data report detailing the results of the initial investigation was completed in November 2011.  Based on the initial RI results, an additional 21 boring locations have been targeted as part of a Phase 2 RI. Additional soil and groundwater sampling was conducted as part of Phase 2 in 2012 and 2014.
  • Draft RI/FS Report – A draft RI/FS report is in development.  An interim action to replace a trunk line pipe along to southern edge of the site boundary is expected to take place by early 2019. The interim action will eliminate a potential pathway from groundwater to Port Gardner Bay, and will provide information for the draft RI/FS report. The RI/FS draft should be available in late 2019.
Legal 2
Document Title Document Date Document Type
TC Systems Inc - Draft Amended Agreed Order September 2018 9/18/2018 Agreed Order Amendment
TC Systems Inc - Agreed Order DE7818 8/5/2010 Agreed Order
Public Information 3
Document Title Document Date Document Type
TC Systems Inc - Fact Sheet September 2018 9/28/2018 Fact Sheet\Public Notices
TC Systems Inc - Public Participation Plan 6/1/2010 Public Participation Plan
TC Systems Inc - Fact Sheet Site Investigation Documents 6/1/2010 Fact Sheet\Public Notices
State Environmental Policy Act 1
Document Title Document Date Document Type
TC Systems Inc - Proposed DNS with SEPA checklist for Interim Action September 2018 9/26/2018 SEPA Documents
Technical Reports 7
Document Title Document Date Document Type
TC Systems Inc - Interim Action Trunkline Replacement Completion Tech Memo 8/16/2019 Interim Action Documents
TC Systems Inc - Final Interim Action Work Plan 6/28/2018 Interim Action Documents
TC Systems Inc - Remedial Investigation/Feasibility Study 7/22/2016 Remedial Investigation / Feasibility Study
TC Systems Inc - Site Hazard Assessment 11/14/2014 Site Hazard Assessment Report
TC Systems Inc - RI APPENDIX C COMPLETE LABORATORY ANALYTICAL DATA SUMMARY 2011 11/7/2011 Site Specific Technical Document - other
TC Systems Inc - RI Final 2011 11/7/2011 Remedial Investigation Report
TC Systems Inc - Remedial Investigation/Feasibility Study Work Plan January 2011 1/31/2011 Remedial Investigation Work Plan
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Headquarters
    300 Desmond Dr SE
    Lacey, 98503
    Please schedule an appointment to view print documents at this location.
  • Mailing Address
    PO BOX 47600
    Olympia, 98504-7600
    This location may only have print documents available during open comment periods.

Contaminants 12

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Other Contaminant - Base/Neutral/Acid Organics S
Metals - Metals Priority Pollutants C C
Halogenated Organics - Polychlorinated biPhenyls (PCB) C S
Non-Halogenated Organics - Petroleum Products-Unspecified C
Non-Halogenated Organics - Phenolic Compounds C
Non-Halogenated Organics - Non-Halogenated Solvents S
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons C S
Metals - Arsenic C C
Metals - Lead C
Halogenated Organics - Other Halogenated Organics C
Non-Halogenated Organics - Petroleum-Diesel S
Non-Halogenated Organics - Petroleum-Gasoline C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.