Title (link to summary) | Number | Date (released or updated) |
Addendum to Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks: Addendum, Arsenic Sampling of Selected Washington Rivers
| 01-03-070 | December 2001 |
Quality Assurance Project Plan: Stillaguamish River Temperature Total Maximum Daily Load
| 01-03-066 | December 2001 |
The Use of 2,4-D for Selective Control of an Early Infestation of Eurasian Watermilfoil in Loon Lake, Washington. Article in Journal of Aquatic Plant Management. 39: 117-125.
| 01-03-047 | December 2001 |
Salmon Recovery Index Watershed Monitoring Program: Water Quality Index Report, October 2000 - September 2001
| 01-03-046 | December 2001 |
Padden Creek Pesticide Monitoring Program, 2001 Progress Report
| 01-03-045 | December 2001 |
Reassessment of Toxicity of Lake Roosevelt Sediments
| 01-03-043 | December 2001 |
River and Stream Ambient Monitoring Report for Water Year 2000
| 01-03-042 | December 2001 |
Chehalis Best Management Practices Evaluation Project, 1995-2000 Temperature Monitoring Data
| 01-03-041 | December 2001 |
Assessment of Surface Water and Groundwater Interchange within the Muck Creek Watershed, Pierce County
| 01-03-037 | December 2001 |
Ecology Responses to Public Comments Received on the Draft PBT Strategy
| 01-03-035 | December 2001 |
Relationship Between the Upper Dungeness River and the Bedrock Aquifer, Clallam County
| 01-03-027 | December 2001 |
Groundwater Quantity Report for WRIA 01, Phase II
| 12-03-265 | November 2001 |
Quality Assurance Project Plan: Ferndale WWTP Outfall Sediments
| 01-03-067 | November 2001 |
Dungeness River/Matriotti Creek Fecal Coliform Bacteria Total Maximum Daily Load Study Streamflow Summary
| 01-03-039 | November 2001 |
Union River Fecal Coliform Total Maximum Daily Load Study
| 01-03-038 | November 2001 |
Obsolete—Stream Sampling Protocols for the Environmental Monitoring and Trends Section
| 01-03-036 | November 2001 |
Water Quality Chapter 8 Technical Assessment
| 12-03-291 | October 2001 |
Quality Assurance Project Plan: Groundwater/Surface Water Interactions In the Sammamish River: a Preliminary Analysis.
| 01-03-068 | October 2001 |
Zinc, Copper, and Lead Concentrations in Quilceda and Allen Creeks: Results of Cooperative Monitoring by Snohomish County and the Washington State Department of Ecology
| 01-03-031 | October 2001 |
Condition of Freshwaters in Washington State: Technical Appendix
| 01-03-026 | October 2001 |
Condition of Freshwaters in Washington State for the Year 2000
| 01-03-025 | October 2001 |
Aquatic Plants Technical Assistance Program 2000 Activity Report
| 01-03-034 | September 2001 |
Analysis and Occurrence of Polybrominated Diphenyl Ethers in Washington State Freshwater Fish. Article in Archives of Environmental Contamination and Toxicology 41, 339-344 (2001)
| 01-03-033 | September 2001 |
Lakewood Plaza Cleaners, January and August 2001 Groundwater Monitoring Sampling Results
| 01-03-032 | September 2001 |
Investigation into Recurring Toxicity of the Chinet Company Columbia River Intake
| 01-03-030 | September 2001 |
Benthic Macroinvertebrate Biological Monitoring Protocols for Rivers and Streams: 2001 Revision
| 01-03-028 | September 2001 |
Groundwater Resources Chapter Level 1 Technical Assessment
| 12-03-290 | August 2001 |
Quality Assurance Project Plan: Sampling to Verify 303(d) Listings for Chemical Contaminants in Shellfish Tissue from Dyes Inlet and Port Washington Narrows
| 01-03-069 | August 2001 |
Quality Assurance Project Plan: Willapa River Temperature Total Maximum Daily Load
| 01-03-063 | August 2001 |
Spokane River/Aquifer Interaction Project Results, May - November 1999
| 01-03-024 | July 2001 |
Chemical Analysis and Toxicity Testing of Spokane River Sediments Collected in October 2000
| 01-03-019 | July 2001 |
Water Quality Assessments of Selected Lakes within Washington State: 1999
| 01-03-009 | July 2001 |
Technical Memorandum-Level 1 Technical Assessment_Hydraulic Continuity Evaluation
| 12-03-292 | June 2001 |
Quality Assurance Project Plan: Monitoring Program to Verify 303(d) Metals Listings for Selected Rivers and Creeks
| 01-03-071 | June 2001 |
Contaminants Associated with Settling Particulate Matter and Bottom Sediments at Two Marinas in Thea Foss Waterway
| 01-03-023 | June 2001 |
American Crossarm and Conduit Monitoring Results, November 2000 and April 2001
| 01-03-022 | June 2001 |
North Creek Watershed: Total Maximum Daily Load Evaluation for Fecal Coliform Bacteria
| 01-03-020 | June 2001 |
Aquatic Plant Sampling Protocols
| 01-03-017 | June 2001 |
Quality Assurance Project Plan: Reassessment of Toxicity of Lake Roosevelt Sediments
| 01-03-073 | May 2001 |
Quality Assurance Project Plan: PCBs in Sediments from Selected Sites in Puget Sound
| 01-03-072 | May 2001 |
Re-Evaluation of Copper Impact from Wilkeson Wastewater Treatment Plant on Wilkeson Creek.
| 01-03-021 | May 2001 |
Final Statewide 303(d) Workload Assessment
| 01-03-018 | May 2001 |
Quality Assurance Project Plan: Freshwater Field Protocol Comparability
| 01-03-200 | April 2001 |
Quality Assurance Project Plan: Moses Lake Phosphorus TMDL Study
| 01-03-075 | April 2001 |
Quality Assurance Project Plan: Characterization of the Groundwater Discharge to Moses Lake, Washington
| 01-03-074 | April 2001 |
Quality Assurance Project Plan: Stillaguamish River Basin and Port Susan Total Maximum Daily Load Evaluation Update
| 01-03-065 | April 2001 |
Spokane River PCB and Source Survey, August 2000
| 01-03-016 | April 2001 |
An Ecological Hazard Assessment for PCBs in the Spokane River
| 01-03-015 | April 2001 |
Skokomish River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study
| 01-03-014 | April 2001 |
River and Stream Ambient Monitoring Report for Water Year 1999
| 01-03-013 | April 2001 |
Mercury Concentrations in Edible Muscle of Lake Whatcom Fish
| 01-03-012 | April 2001 |
Quality Assurance Project Plan: Padden Creek Pesticide Monitoring Project
| 01-03-076 | March 2001 |
Restover Truck Stop Groundwater Monitoring, Results of December 2000 Sampling
| 01-03-011 | March 2001 |
Survey of Typical Soils Arsenic Concentrations in Residential Areas of the City of University Place
| 01-03-008 | March 2001 |
Concentrations of Selected Chemicals in Sediments from Harbors in the San Juan Islands
| 01-03-007 | March 2001 |
Flow Summary at Three Seasonal Gaging Stations on the Little Klickitat River
| 01-03-006 | March 2001 |
Carbaryl Concentrations in Willapa Bay and Recommendations for Water Quality Guidelines
| 01-03-005 | March 2001 |
Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies
| 01-03-003 | February 2001 |
Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation
| 01-03-064 | January 2001 |
Dungeness River and Matriotti Creek Total Maximum Daily Load Study: Preliminary Data Results for November 1999 through October 2000
| 01-03-002 | January 2001 |
The Use of Sediment Cores to Track Persistent Pollutants in Washington State: A Review
| 01-03-001 | January 2001 |
USBR Columbia River Pump Exchange Project: Potential Water Quality Impacts on the Lower Yakima River
| 01-03-000 | January 2001 |