Title (link to summary) | Number | Date (released or updated) |
North Whatcom Groundwater Update
| 11-09-180 | October 2011 |
Quality Assurance Project Plan: Sumas-Blaine Aquifer Nitrate Contamination Summary
| 11-03-111 | October 2011 |
EDB and 1,2-DCP in Domestic Groundwater Supplies, Follow-Up Investigation: Bertrand Creek Area (Whatcom County)
| 11-03-050 | October 2011 |
Quality Assurance Project Plan: Black Lake Grocery Groundwater Confirmational Monitoring
| 11-03-114 | September 2011 |
Sumas-Blaine Aquifer Long-Term Groundwater Quality Monitoring Network, 2009 Annual Report
| 11-03-015 | September 2011 |
Groundwater Level Gauging Project: Lower Lake Roosevelt Watershed (WRIA 53),
| 15-03-015 | June 2011 |
Mission Creek Subwatershed Hydro-Geologic Monitoring Report
| 14-03-038 | June 2011 |
Chumstick Creek Subwatershed Hydro-Geologic Monitoring Report
| 14-03-037 | June 2011 |
Little Spokane Groundwater Elevation and Stream Flow Monitoring Project, Tech. Memo - 2011 Project Update
| 12-03-339 | June 2011 |
2011 Swale Creek Subbasin Water Level Monitoring Summary, WRIA 30
| 12-03-337 | June 2011 |
POSTER: Nitrate Contamination in the Sumas-Blaine Aquifer, Whatcom County, Washington
| 11-03-027 | May 2011 |
Appendix E: COC Concentration Decision - Ambient Areas
| 1103023AppendixE | April 2011 |
Appendix D: COC Concentration and Mass Flux Estimates - Non-detect substitution Method 2 (Lowest RL)
| 1103023AppendixD | April 2011 |
Appendix C: COC Concentration and Mass Flux Estimates - Non-detect substitution Method 1 (0.5RL)
| 1103023AppendixC | April 2011 |
Control of Toxic Chemicals in Puget Sound: Evaluation of Loading of Toxic Chemicals to Puget Sound by Direct Groundwater Discharge
| 11-03-023 | April 2011 |
Proposed legislation for building a Water Smart Central Washington
| 11-11-003 | March 2011 |
City of Walla Walla, Sudbury Road Landfill Site
| 11-07-010 | March 2011 |
Quality Assurance Project Plan: Analyzing Pharmaceuticals and Personal Care Products in Effluent and Groundwater at Three Reclaimed Water Facilities.
| 11-03-103 | February 2011 |
American Plating Post-Interim-Action Groundwater Monitoring Results: April and October, 2010
| 11-03-016 | February 2011 |
Lakewood Plaza Cleaners Groundwater Monitoring Results, June and October 2010
| 11-03-011 | January 2011 |