Title (link to summary) | Number | Date (released or updated) |
Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section
| 05-03-205 | December 2005 |
Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit
| 05-03-202 | December 2005 |
Quality Assurance Project Plan (Revised): Little Spokane River Watershed Total Maximum Daily Load Study
| 05-03-121 | December 2005 |
An Analysis of Microbial Pollution in the Sinclair-Dyes Inlet Watershed
| 05-03-042 | December 2005 |
Walla Walla River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-041 | December 2005 |
Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit
| 05-03-036 | December 2005 |
Wenatchee River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-012 | December 2005 |
Focus on Wilson Creek Sub-basin Bacteria TMDL
| 03-10-022 | December 2005 |
Focus on Teanaway Basin - A plan to improve stream temperatures
| 01-10-020 | December 2005 |
Focus on Upper Yakima Basin - Restoration plan targets sediments
| 01-10-003 | December 2005 |
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study
| 05-03-115 | November 2005 |
Lower Similkameen River Arsenic Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan
| 05-10-074 | October 2005 |
Gibbons Creek Watershed Fecal Coliform Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan
| 05-10-078 | August 2005 |
Willapa River Watershed Temperature Total Maximum Daily Load (Water Cleanup Plan): Submittal Report and Detailed Implementation Plan
| 05-10-073 | August 2005 |
Colville River Watershed Fecal Coliform Bacteria Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan
| 05-10-045 | August 2005 |
Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study
| 05-03-203 | August 2005 |
Flow Summary for Gaging Stations on Selected Tributaries of the Walla Walla River
| 05-03-029 | August 2005 |
Assessment of Surface Water and Groundwater Interchange in the Walla Walla River Watershed
| 05-03-020 | August 2005 |
Wenatchee River Temperature Total Maximum Daily Load Study
| 05-03-011 | August 2005 |
Colville National Forest Temperature, Bacteria, and pH Total Maximum Daily Load (Water Cleanup Plan): Submittal Report
| 05-10-047 | July 2005 |
Groundwater Data Summary for the Wenatchee River Watershed Total Maximum Daily Load Study
| 05-03-018 | July 2005 |
Assessment of Total Dissolved Gas in the Spokane River at Upriver and Little Falls Dams
| 05-03-010 | July 2005 |
Wilson Creek Sub-Basin Bacteria Total Maximum Daily Load (Water Cleanup Plan): Submittal Report
| 05-10-041 | June 2005 |
Nisqually Watershed Bacteria and Dissolved Oxygen Total Maximum Daily Load (Water Cleanup Plan): Submittal Report
| 05-10-040 | June 2005 |
Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study
| 05-03-111 | June 2005 |
Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-110 | June 2005 |
Flow Summary for Gaging Stations on the Wenatchee River and Selected Tributaries
| 05-03-015 | June 2005 |
Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study
| 05-03-014 | June 2005 |
Stillaguamish River Watershed Fecal Coliform, Dissolved Oxygen, pH, Arsenic, and Mercury Total Maximum Daily Load (Water Cleanup Plan) - Submittal Report
| 05-10-044 | May 2005 |
Little Bear Creek Water Cleanup Plan for Fecal Coliform Bacteria, Total Maximum Daily Load - Submittal Report
| 05-10-034 | May 2005 |
Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek
| 05-03-107 | May 2005 |
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish
| 05-03-106 | May 2005 |
Appendices: Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study
| 05-03-002app | May 2005 |
Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study
| 05-03-002 | May 2005 |
Focus Sheet: Water Cleanup Planning in the East Fork Lewis River Watershed
| 05-03-013 | April 2005 |
Salmon Creek Watershed Bacteria and Turbidity Total Maximum Daily Load (Water Cleanup Plan): Detailed Implementation Plan
| 05-10-037 | March 2005 |
Focus on Little Bear Creek
| 05-10-024 | February 2005 |
Selah Ditch Multiparameter Total Maximum Daily Load: Technical Assessment
| 05-10-020 | February 2005 |
Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring
| 05-03-201 | February 2005 |
Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study, Data Summary Report
| 05-03-003 | February 2005 |
North Fork Palouse River Fecal Coliform Total Maximum Daily Load: Submittal Report
| 04-10-067 | February 2005 |
Lower Okanogan River Basin DDT and PCBs Total Maximum Daily Load: Submittal Report
| 04-10-043 | February 2005 |
Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study
| 05-03-101 | January 2005 |
Lake Whatcom Total Maximum Daily Load Groundwater Study
| 05-03-001 | January 2005 |