Publications Home



Water Cleanup Plans (TMDL) (614 publications 1986-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1997 · 1996 · 1995 · 1994 · 1993 · 1992 · 1991 · 1990 · 1987 · 1986 ·

Title (link to summary)NumberDate (released or updated)
McAllister Creek Fecal Coliform Bacteria Monitoring Summer 2009 09-10-094December 2009
Clarks Creek Watershed Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Implementation Plan 09-10-081December 2009
Water Quality Study Design (Quality Assurance Project Plan): Deschutes River Multi-parameter Total Maximum Daily Load Effectiveness Monitoring Pilot Project. 09-03-133December 2009
Quality Assurance Project Plan: Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River 09-03-119November 2009
Quality Assurance Project Plan: Lower White River pH Nutrients Study. 09-03-131October 2009
Quality Assurance Project Plan: Deschutes River Continuous Nitrate Monitoring 09-03-130October 2009
Quality Assurance Project Plan: White Salmon River Fecal Coliform Bacteria Compliance Monitoring 09-03-127September 2009
South Fork Palouse River Fecal Coliform Bacteria TMDL: Water Quality Improvement Report 09-10-060August 2009
Salmon Creek Nonpoint Source Pollution Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report 09-03-042August 2009
Streamflow Summary for Gaging Stations on the Snoqualmie River and Selected Tributaries, 2006 09-03-040August 2009
Wenatchee River Watershed Dissolved Oxygen and pH Total Maximum Daily Load: Water Quality Improvement Report 08-10-062August 2009
Total Maximum Daily Loading (TMDL) to Limit Discharges of 2,3,7,8-TCDD (Dioxin) to the Columbia River Basin 09-10-058July 2009
Newman Lake Total Phosphorus Total Maximum Daily Load: Water Quality Implementation Plan 09-10-039July 2009
Samish Bay Watershed Fecal Coliform Bacteria Total Maximum Daily Load - Volume 2 09-10-019July 2009
Quality Assurance Project Plan: Supplemental: Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study 09-03-114July 2009
Lake Sawyer Total Phosphorus TMDL Water Quality Implementation Plan 09-10-053June 2009
Dobbs Creek Water Quality Monitoring for Fecal Coliform Bacteria 09-10-051June 2009
Executive Summary of Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report 09-10-030aJune 2009
Hangman (Latah) Creek Watershed Fecal Coliform, Temperature, and Turbidity Total Maximum Daily Load: Water Quality Improvement Report 09-10-030June 2009
Surface Water/Groundwater Exchange Along the East Fork Lewis River (Clark County), 2005 09-03-037June 2009
Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report 09-10-045May 2009
Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 2006 09-10-034April 2009
Quality Assurance Project Plan: Audubon Lake's Connection to Upper Crab Creek (Lincoln County): Source Assessment 09-03-112April 2009
Quality Assurance Project Plan: Okanogan River DDT and PCB Total Maximum Daily Load Effectiveness Monitoring 09-03-107April 2009
High-resolution Porewater Sampling Near the Groundwater/Surface Water Interface 09-03-017April 2009
Addendum to Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring 05-03-201ADD1April 2009
Quality Assurance Project Plan: Innovative Temperature Total Maximum Daily Load Pilot Study 09-03-105March 2009
Quality Assurance Project Plan: Dungeness Bay and Lower Dungeness River Watershed Fecal Coliform Bacteria Total Maximum Daily Load Effectiveness Monitoring 09-03-104February 2009
Surface-water/Groundwater Interactions and Near-stream Groundwater Quality along the Palouse River, South Fork Palouse River, and Paradise Creek 09-03-007February 2009
Adaptive Management Team Total Dissolved Gas in the Columbia and Snake Rivers: Evaluation of the 115 Percent Total Dissolved Gas Forebay Requirement 09-10-002January 2009
Water Quality Study Design (Quality Assurance Project Plan): Liberty Bay Tributaries Fecal Coliform Bacteria Total Maximum Daily Load 09-03-102January 2009
Palouse River Watershed PCB and Dieldrin Monitoring, 2007-2008: Wastewater Treatment Plants and Abandoned Landfills 09-03-004January 2009
Streamflow Summary for Gaging Stations on the East Fork Lewis River, 2005-06 09-03-002January 2009
Focus on Deschutes Watershed 08-10-103January 2009
Addendum to Quality Assurance Project Plan: South Prairie Creek Total Maximum Daily Load Phase II Evaluation 01-03-064ADD1January 2009