Title (link to summary) | Number | Date (released or updated) |
WRIA14 Kennedy-Goldsborough Watershed Phase II Hydrogeologic Investigation
| 12-03-275 | December 2005 |
Quality Assurance Project Plan: Comparison of Stream Temperature Monitoring Protocols used by the Environmental Monitoring and Trends Section
| 05-03-205 | December 2005 |
Quality Assurance Project Plan: Continuous Stream Temperature Monitoring by the Freshwater Monitoring Unit
| 05-03-202 | December 2005 |
Quality Assurance Project Plan (Revised): Little Spokane River Watershed Total Maximum Daily Load Study
| 05-03-121 | December 2005 |
Quality Assurance Project Plan: PCBs and Other Contaminants in Spokane River Fish, 2005
| 05-03-120 | December 2005 |
Quality Assurance Project Plan: Assessment of Ambient Groundwater Quality Conditions in the Surficial Unconsolidated Sedimentary Aquifer of the Moxee Valley, Yakima County, Washington
| 05-03-119 | December 2005 |
Quality Assurance Project Plan: Toxics in Stormwater Runoff from Puget Sound Boatyards
| 05-03-118 | December 2005 |
An Analysis of Microbial Pollution in the Sinclair-Dyes Inlet Watershed
| 05-03-042 | December 2005 |
Walla Walla River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-041 | December 2005 |
Plate D. Groundwater Quality Results for Select Constituents
| 05-03-040plateD | December 2005 |
Plate C. Water-Level Contours, Groundwater Flow Directions, Well Hydrographs, and Groundwater/Surface Water Interactions
| 05-03-040plateC | December 2005 |
Plate B. Map of Inventoried Wells
| 05-03-040plateB | December 2005 |
Plate A. Hydrogeology, Hydrogeologic Cross Sections, and Hydraulic Conductivity Distribution
| 05-03-040plateA | December 2005 |
Washington State Groundwater Assessment Program: Hydrology and Quality of Groundwater in the Centralia-Chehalis Area Surficial Aquifer
| 05-03-040 | December 2005 |
River and Stream Water Quality Monitoring Report for Water Year 2004
| 05-03-038 | December 2005 |
Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit: Technical Appendix
| 05-03-037 | December 2005 |
Washington State Water Quality Conditions in 2004, based on Data from the Freshwater Monitoring Unit
| 05-03-036 | December 2005 |
Wenatchee River Basin Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-012 | December 2005 |
Hudson Bay Aquifer Recharge Testing Annual Report 2005
| 12-03-302 | November 2005 |
Quality Assurance Project Plan: Squalicum Harbor Tributyltin (TBT) Investigation
| 05-03-117 | November 2005 |
Quality Assurance Project Plan: South Puget Sound Fish and Shellfish Tissue Verification of 303(d) Listings
| 05-03-116 | November 2005 |
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study
| 05-03-115 | November 2005 |
Quality Assurance Project Plan: Hood Canal Dissolved Oxygen Program Integrated Assessment and Modeling Study Year 1 Activities
| 05-03-114 | November 2005 |
Aquifer Storage and Recovery Assessment, City of Kennewick
| 12-03-299 | October 2005 |
Old Stillaguamish River Channel Diel Surveys, July and September 2004
| 05-03-035 | October 2005 |
Clean Water Act Monitoring Strategy for Washington State
| 05-03-034 | October 2005 |
Quality Assurance Monitoring Plan: Streamflow Gaging Network
| 05-03-204 | September 2005 |
Quality Assurance Project Plan: PBT Monitoring: Measuring PBDE Levels in Washington Rivers and Lakes
| 05-03-113 | September 2005 |
Quality Assurance Project Plan: Metals Concentrations from Stormwater Runoff in an Industrial Area Creek
| 05-03-112 | September 2005 |
QUAL2Kw - A framework for modeling water quality in streams and rivers using a genetic algorithm for calibration
| 05-03-044 | September 2005 |
Screening Survey for Petroleum Contamination at Cornet Bay Marina (Island County)
| 05-03-033 | September 2005 |
Investigation of Petroleum Products in Black Lake Sediment and Surface Water Adjacent to an Underground Storage Tank Site
| 05-03-030 | September 2005 |
Surficial Aquifers and Approximate Depth to Water
| 12-03-264 | August 2005 |
Quality Assurance Project Plan: Pataha Creek Effectiveness Monitoring Total Maximum Daily Load Study
| 05-03-203 | August 2005 |
Flow Summary for Gaging Stations on Selected Tributaries of the Walla Walla River
| 05-03-029 | August 2005 |
Stormwater Quality Survey of Western Washington Construction Sites, 2003-2005
| 05-03-028 | August 2005 |
Palermo Wellfield Superfund Site Subdrain System and Treatment Lagoon, Status Report, September 2004 and June 2005
| 05-03-027 | August 2005 |
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, April through October, 2004: A Cooperative Study by the Washington State Departments of Ecology and Agriculture
| 05-03-025 | August 2005 |
Changes and Trends in Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-2000
| 05-03-024 | August 2005 |
Ostrich Bay Sediment Toxicity Evaluation
| 05-03-023 | August 2005 |
Assessment of Surface Water and Groundwater Interchange in the Walla Walla River Watershed
| 05-03-020 | August 2005 |
Wenatchee River Temperature Total Maximum Daily Load Study
| 05-03-011 | August 2005 |
Groundwater Data Summary for the Wenatchee River Watershed Total Maximum Daily Load Study
| 05-03-018 | July 2005 |
Temporal Monitoring of Puget Sound Sediments: Results of the Puget Sound Ambient Monitoring Program, 1989-2000
| 05-03-016 | July 2005 |
Assessment of Total Dissolved Gas in the Spokane River at Upriver and Little Falls Dams
| 05-03-010 | July 2005 |
Glade Fourmile Subbasin Water Quality Report
| 12-03-297 | June 2005 |
Multi-Purpose Storage Assessment WRIA 20
| 12-03-289 | June 2005 |
Quality Assurance Project Plan: Upper Yakima Basin Temperature Total Maximum Daily Load Study
| 05-03-111 | June 2005 |
Quality Assurance Project Plan: East Fork Lewis River Temperature and Fecal Coliform Bacteria Total Maximum Daily Load Study
| 05-03-110 | June 2005 |
Quality Assurance Project Plan: Cornet Bay Intertidal Contaminant Screening Survey
| 05-03-109 | June 2005 |
Typical Dioxin Concentrations in Agriculture Soils of Washington State and Potential Sources
| 05-03-043 | June 2005 |
Shelton Laundry and Cleaners, September 2004 and April 2005 Groundwater Monitoring Results
| 05-03-019 | June 2005 |
Verification of 303(d) Listings for Fish Tissue in the Skagit and Pend Oreille Rivers
| 05-03-017 | June 2005 |
Flow Summary for Gaging Stations on the Wenatchee River and Selected Tributaries
| 05-03-015 | June 2005 |
Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study
| 05-03-014 | June 2005 |
Hydrogeologic Assessment of Tucannon River, Pataha and Asotin Creek Drainages
| 12-03-310 | May 2005 |
Quality Assurance Project Plan: Methoprene Monitoring in Grant County Mosquito Control District #1
| 05-03-108 | May 2005 |
Quality Assurance Project Plan: Total Maximum Daily Load Analysis for Temperature in Tributaries to Oakland Bay-Hammersley Inlet: Mill Creek, Cranberry Creek, and Johns Creek
| 05-03-107 | May 2005 |
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish
| 05-03-106 | May 2005 |
Quality Assurance Project Plan: Bioaccumulative Chemicals in Hatchery Feed and Hatchery Fish
| 05-03-104 | May 2005 |
Appendices: Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study
| 05-03-002app | May 2005 |
Nisqually River Basin Fecal Coliform Bacteria and Dissolved Oxygen Total Maximum Daily Load Study
| 05-03-002 | May 2005 |
Quality Assurance Project Plan: Investigation of Petroleum Products in Black Lake Sediment and Surface Water from Underground Tanks.
| 05-03-105 | April 2005 |
Quality Assurance Project Plan: A Survey of Zinc Concentrations in Industrial Stormwater Runoff
| 05-03-103 | April 2005 |
Focus Sheet: Water Cleanup Planning in the East Fork Lewis River Watershed
| 05-03-013 | April 2005 |
A Comparison of Water Quality Data Collected from Two Washington Rivers by the Department of Ecology and the U.S. Geological Survey
| 05-03-009 | April 2005 |
Spatial Extent of Dioxin/Furan Contaminated Sediments in Dillenbaugh Creek
| 05-03-008 | April 2005 |
Hydrogeologic Study of the Lower Dosewallips_Brinnon Area_WRIA 16 Final Report
| 12-03-276 | March 2005 |
Seawater Intrusion Topic Paper
| 12-03-271 | March 2005 |
Effects of Small-Scale Gold Dredging on Arsenic, Copper, Lead, and Zinc Concentrations in the Similkameen River
| 05-03-007 | March 2005 |
Concentrations of 303(d) Listed Pesticides, PCBs, and PAHs Measured with Passive Samplers Deployed in the Lower Columbia River
| 05-03-006 | March 2005 |
Quality Assurance Project Plan: Skokomish River Basin Fecal Coliform TMDL Attainment Monitoring
| 05-03-201 | February 2005 |
Quality Assurance Project Plan: Saginaw Mill Groundwater Monitoring
| 05-03-102 | February 2005 |
Walla Walla River Basin Fecal Coliform Bacteria and pH Total Maximum Daily Load Study, Data Summary Report
| 05-03-003 | February 2005 |
Quality Assurance Project Plan: Yakima Area Creeks Fecal Coliform Total Maximum Daily Load Study
| 05-03-101 | January 2005 |
Lake Whatcom Total Maximum Daily Load Groundwater Study
| 05-03-001 | January 2005 |