Yakima River (55 publications 1971-2024)


Title (link to summary)NumberDate (released or updated)
Upper Yakima River Basin Water Quality Monitoring for Aquatic Life: Temperature, Dissolved Oxygen, and pH - Data Summary 21-03-005January 2024
WRIA 39 Upper Yakima Watershed Water Availability 20-11-039August 2023
WRIA 37 Lower Yakima Watershed Water Availability 20-11-037August 2023
Quality Assurance Project Plan: Monitoring of Tributaries to the Yakima River Boundary Waters of the Yakama Nation 22-03-112August 2022
Quality Assurance Project Plan: Lower Yakima River Monitoring to Support Continuous Water Quality Gaging 22-03-111August 2022
Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticides TMDL: 2019 Effectiveness Monitoring for TSS and Turbidity TMDL Targets 21-03-013July 2021
Enfoque en: Pruebas de pozos de agua potable en el Lower Yakima Valley 21-03-012ESMay 2021
Focus on: Drinking Water Well Tests in the Lower Yakima Valley 21-03-012April 2021
Upper Yakima River Tributaries Temperature Total Maximum Daily Load (TMDL): Water Quality Improvement Report and Implementation Plan 20-10-044February 2021
Mid-Yakima River Basin Bacteria TMDL - Water Quality Improvement Report 20-10-030October 2020
Enfoque: La Carga Diaria Máxima Total (TMDL, por sus siglas en inglés) de Bacteria en la Cuenca del Rio Medio-Yakima 20-10-034September 2020
Focus on: Mid-Yakima River Basin Bacteria TMDL 20-10-029September 2020
Quality Assurance Project Plan: Upper Yakima River Basin Water Quality Monitoring for Aquatic Life Parameters: Water Temperature, Dissolved Oxygen, and pH 19-03-112September 2019
Quality Assurance Project Plan: Upper Yakima River Basin Suspended Sediment and Turbidity Status Monitoring 19-03-108June 2019
Frequently Asked Questions: Yakima River Basin Adjudication 19-11-068May 2019
2018 Cost Estimate and Financing Plan Yakima River Basin Integrated Water Resource Management Plan 18-12-006October 2018
Quality Assurance Project Plan: Lower Yakima River Thermal Refuge Profiling 18-12-009June 2018
Yakima River Basin Integrated Water Resource Management Plan Implementation Status Report 2017 18-12-005May 2018
Freshwater Fish Contaminant Monitoring Program: 2014 Results 16-03-027July 2016
Yakima River Preliminary Assessment of Temperature, Dissolved Oxygen, and pH 16-03-048February 2016
Kachess Drought Relief Pumping Plant and Keechelus Reservoir-to-Kachess Reservoir Conveyance Draft Environmental Impact Statement 15-12-001January 2015
Yakima River Basin Integrated Water Resource Management Plan Cost Estimate and Financing Plan Legislative Report 15-12-003December 2014
Mid-Yakima River Basin Fecal Coliform Bacteria Total Maximum Daily Load: Water Quality Study Findings 12-03-047September 2012
Focus on Yakima Basin Water Plan 13-12-002July 2012
Kachess Reservoir Inactive Storage Project At A Glance - Yakima River Basin Integrated Water Resource Management Plan 12-12-013July 2012
Wymer Surface Water Storage At A Glance - Yakima River Basin Integrated Water Resource Management Plan 12-12-011July 2012
Cle Elum Pool Raise At A Glance - Yakima River Basin Integrated Water Resource Management Plan 12-12-009June 2012
Project Update for the Lower Yakima River Suspended Sediment TMDL 98-10-202aMay 2012
Project Update for the Lower Yakima River Suspended Sediment TMDL 12-10-034May 2012
Yakima River Basin Integrated Water Resource Management Plan Final Programmatic Environmental Impact Statement 12-12-002March 2012
Yakima River Basin Study - Proposed Integrated Water Resource Management Plan for the Yakima River Basin 11-12-004April 2011
Water for Jobs and Fish: The Red Mountain AVA/Kiona Diversion Project 10-12-004June 2010
Yakima River Pesticides and PCBs Total Maximum Daily Load: Volume 1. Water Quality Study Findings 10-03-018April 2010
Frequently Asked Questions: Yakima River Watershed Toxics Study:: Progress Update 09-10-088November 2009
Final EIS, Yakima River Basin Integrated Water Resource Management Alternative 09-12-009June 2009
Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load Study: Water Quality Effectiveness Monitoring Report 09-10-045May 2009
Quality Assurance Project Plan: Suspended Sediment and Turbidity Total Maximum Daily Load Effectiveness-Monitoring Project in the Upper Yakima River Basin April to October 2006 09-10-034April 2009
POSTER: Pesticides in Salmonid-Bearing Streams: Intensive Sampling in an Agricultural Drain 08-03-014December 2008
Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study. 07-03-107July 2007
Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish in 2006: Data Summary and Comparison to Human Health Criteria 07-03-036July 2007
Focus on Upper Yakima Basin - Restoration plan targets sediments 01-10-003December 2005
Upper Yakima River Basin Suspended Sediment, Turbidity and Organochlorine Pesticide Total Maximum Daily Load -- Submittal Report 02-10-047August 2002
Upper Yakima River Basin Suspended Sediment and Organochlorine Pesticide Total Maximum Daily Load Evaluation 02-03-012April 2002
Lower Yakima River Cleanup Plan - a plan targeting sediment and pesticides 98-2026WQDecember 1998
Lower Yakima River Suspended Sediment TMDL 98-10-202November 1998
GIS Analysis, Yakima River Suspended Sediment TMDL Evaluation. 95-e17June 1995
Organochlorine analysis of Yakima River samples for State of the Environment Report. 91-e27September 1991
Results of Low-flow Surveys in the Yakima River Above and Below Prosser STP, October 5-6, 1982, and September 13-14, 1983. 84-e22January 1984
DDT Concentrations in Fish taken from the Yakima River Below Birchfield (Moxee) Drain. 83-e27December 1983
Review of Available DDT Data. Especially as Related to the Yakima River and Recent Elevated Residues Found in Samples from Birchfield (Moxee) Drain. 83-e26July 1983
Birchfield DDT Recommendations. 83-e01July 1983
Water Quality in the Gap-to-Gap Reach of the Yakima River, June-October 1982. 83-e17June 1983
Yakima River Basin Water Enhancement Project 82-11-002December 1982
1981 Water Supply for the Yakima River Watershed 81-11-005May 1981
Yakima River Study Near the Utah and Idaho Sugar Company, Toppenish, Washington. 71-e27November 1971