Columbia Gorge Aluminum
Facility Site ID:
95415874
Cleanup Site ID:
11797
What's Happening Now
Proposed energy project
On Dec. 21. 2022, we released the final Environmental Impact Statement (EIS) for the proposed Goldendale Energy Storage Project. The EIS includes the evaluation of impacts on part of the former smelter site called the West Surface Impoundment.Free Flow Power, LLC (FFP) proposes to purchase, clean up, and redevelop this part of the site under a Prospective Purchaser Consent Decree (PPCD) as part of this project. On Nov. 24, 2021, we received a draft Remedial Investigation and Feasibility Study (RI/FS), and draft Cleanup Action Plan (CAP) for the proposal. We are reviewing the draft documents and negotiating the PPCD. We will make the draft RI, FS, CAP, and proposed PPCD available for public review and comment before making a final decision.
Read the public participation plan for information on how we will engage with the public as cleanup progresses on this part of the project's footprint.
Site-wide revised draft Remedial Investigation
We are also working with liable parties NSC Smelter, LLC, and Lockheed Martin Corporation to investigate and clean up the rest of the site. On June 14, 2022, we received a revised site-wide draft RI that includes additional data that fills gaps in our understanding about the nature and extent of contamination at the site and addresses comments from Ecology and the Yakama Nation.- Volume 1: Introduction
- Volume 2: Summary
- Volume 3: Rectifier Yard and Plant Area
- Volume 4: Columbia River sediments, groundwater, and wetlands
A thorough investigation and cleanup of this site is a high priority for the Department of Ecology. Cleanup of the full site will proceed regardless of the proposed energy project. We will continue to make sure that activities at the site, whether they are related to cleanup or a future use, meet local, state, and federal requirements to protect the environment.
Site Information
Located at 85 John Day Dam road in Goldendale, next to the Columbia River, the Columbia Gorge Aluminum aluminum smelter operated under various owners until it closed in 2003. Starting in 1980, owners managed hazardous and solid waste at several locations on the site. The facility was added to the Hazardous Sites list in 1990.
Investigation and clean up of the contamination is taking place under an Agreed Order.
Investigation and clean up of the contamination is taking place under an Agreed Order.
Wastewater Permit
Under a National Pollutant Discharge Elimination System (NPDES) wastewater permit, the site currently discharges stormwater and a small amount of sanitary wastewater to the Columbia River. Demolition contractors use best management practices to minimize pollutants in the stormwater. Sanitary wastewater is treated using a small actived sludge system prior to combining with stormwater. For more information, read the NPDES permit, fact sheet, and permit modification fact sheet.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 1
Environmental Covenant
County Recording #:
Vol. 244, pp.34-47
County Recording Date:
12/4/1987
Restrictions/Requirements
- Restrict Land Use
Restricted Media
- Groundwater
- Soil
Documents 26
Legal 5
Document Title | Document Date | Document Type |
2014 Columbia Gorge Aluminum Agreed Order 10483 | 3/26/2014 | Agreed Order |
2013 Columbia Gorge Aluminum NSC Smelter PLP Letter | 6/13/2013 | Final Potentially Liable Person Status Letter |
2011 Columbia Gorge Aluminum Lockheed Martin PLP Letter | 8/10/2011 | Final Potentially Liable Person Status Letter |
2011 Columbia Gorge Aluminum PLP Letter | 8/9/2011 | Final Potentially Liable Person Status Letter |
1987 Columbia Gorge Aluminum Deed Restriction | 2/22/1988 | Environmental Covenant; Alternative Mechanism |
Public Information 3
Document Title | Document Date | Document Type |
Goldendale Energy Storage Project Public Participation Plan | 5/4/2022 | Public Participation Plan |
2014 Columbia Gorge Aluminum Public Comment Notice Agreed Order 10483 | 3/26/2014 | Fact Sheet\Public Notices |
2014 Columbia Gorge Aluminum Public Participation Plan | 3/17/2014 | Public Participation Plan |
Technical Reports 18
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Contaminants 4
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | |||||
Other Contaminant - Conventional Contaminants, Inorganic | C | C | ||||
Non-Halogenated Organics - Petroleum-Diesel | C | |||||
Non-Halogenated Organics - Petroleum-Other | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.