Simplot Soilbuilders Sunnyside

Facility Site ID: 76742139 Cleanup Site ID: 2558

Site History

Simplot Soilbuilders Sunnyside - Photo Courtesy of Google Streetview
Simplot Soilbuilders Sunnyside - Photo Courtesy of Google Streetview
In the 1960s, the site began as Simplot Soilbuilders in Sunnyside as an agricultural distribution facility for fertilizers, pesticides, and soil amendments. It is now operating as Simplot Grower Solutions.

Environmental investigations in 2007 and 2008 revealed agricultural chemicals, diesel, and gasoline contamination in soil and groundwater. In 2012, contaminated soil from a fertilizer spray equipment rinse area on the site was excavated and removed. In 2011, the main warehouse, office building, fertilizer storage tank area, and containment system were removed. A new office and concrete basin containment structure was built. A maintenance shop remains on the site.

A Remedial Investigation (RI) and Feasibility Study (FS) will be completed as part of the Agreed Order. The RI will show how far the contamination has gone, and the FS will detail different options, with costs and timelines, to do the cleanup.
Legal 2
Document Title Document Date Document Type
Simplot SoilBuilders Sunnyside - Agreed Order DE 16446 6/26/2019 Agreed Order
Simplot Soilbuilders Sunnyside - Determination of PLP Status 12/17/2018 Final Potentially Liable Person Status Letter
Public Information 1
Document Title Document Date Document Type
Simplot Soilbuilders Sunnyside - Agreed Order Fact Sheet 6/26/2019 Fact Sheet\Public Notices
Technical Reports 42
Document Title Document Date Document Type
Simplot Soilbuilders Sunnyside - Ecology Comments on Draft Feasibility Study 11/15/2023 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - 3rd Quarter 2023 Progress Report 10/4/2023 Progress Report
Simplot Soilbuilders Sunnyside - Feasibility Study Extension Approval 8/21/2023 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - ECY Comments on RI Phase 3 5/8/2023 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - 1st Quarter 2023 Progress Report 4/7/2023 Progress Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendices D, E, and F 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix C - Lab Reports 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Tables 5b, 6, 7, 8, and 9 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Table 5a Part 3 of 3 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Table 5a Part 2 of 3 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Table 5a Part 1 of 3 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Tables 4a and 4b 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix B - Tables 1, 2, and 3 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report Appendix A - Figures 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Phase 3 Remedial Investigation Report without appendices 3/1/2023 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Site Manager Change 1/24/2023 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - 4th Quarter 2022 Progress Report 1/10/2023 Progress Report
Simplot Soilbuilders Sunnyside - 3rd Quarter 2022 Progress Report 10/10/2022 Progress Report
Simplot Soilbuilders Sunnyside - Ecology Comments on Phase 3 Work Plan 7/29/2022 Site Specific Technical Document - other
Simplot Soilbuilders Sunnyside - Tier 2 Vapor Intrusion Work Plan 4/22/2022 Sampling and Analysis Plan
Simplot Soilbuilders Sunnyside - Phase 2.5 Remedial Investigation 4/1/2022 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - 1st Quarter 2022 Progress Report 1/6/2022 Progress Report
Simplot Soilbuilders Sunnyside - 3rd Quarter 2021 Progress Report 10/11/2021 Progress Report
Simplot Soilbuilders Sunnyside - Draft Quality Assurance Project Plan 6/11/2021 Site Specific Technical Document - other
Simplot Soilbuilders Sunnyside - SAP Phase 2.5 RI Activities 6/10/2021 Sampling and Analysis Plan
Simplot Soilbuilders Sunnyside - Phase 2 Remedial Investigation Report 3/1/2021 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Comments on Phase 1 Remedial Investigation Report 4/28/2020 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilder Sunnyside - Phase 1 Remedial Investigation Report 4/1/2020 Remedial Investigation Report
Simplot Soilbuilders Sunnyside - Comments and Conditional Approval for RIWP 11/5/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Sunnyside Draft Data Summary Report without Appendix C 8/1/2019 Site Specific Technical Document - other
Simplot Soilbuilders Sunnyside - Transmittal of Draft Agreed Order 2/11/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - PM - General Standards of Work Letter 2/7/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - Tranmittal Letter from TCP PM 2/7/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - VCP Termination Letter 1/29/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Sunnyside Agreed Order letter 1/22/2019 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside - Status of Cleanup 12/17/2018 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside 30 Notice of Potentially Liability 11/2/2018 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside Site Status Update 11/2/2018 Site Specific Administrative Document - other (Administrative correspondence)
Simplot Soilbuilders Sunnyside Monitoring Well Sampling 6/1/2018 Groundwater Monitoring Report
Simplot Soilbuilders Sunnyside Supplemental Drain Evaluation and Monitoring Well Sampling Report 9/1/2013 Groundwater Monitoring Report
Simplot Soilbuilders Sunnyside 2011 gw sampling rpt 5/1/2012 Groundwater Monitoring Report
Simplot Soilbuilders Sunnyside Prelim Site Investigation Report 12/22/2009 Site Specific Technical Document - other
Voluntary Cleanup Program 1
Document Title Document Date Document Type
Simplot Soilbuilders Sunnyside - VCP Opinion on Site Cleanup - Further Action 6/4/2010 Voluntary Cleanup Program Opinion – Other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Central Regional Office
    1250 W Alder St
    Union Gap, 98903-0009
    Please schedule an appointment to view print documents at this location.

Contaminants 10

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals Priority Pollutants C
Metals - Metals - Other C
Non-Halogenated Organics - Non-Halogenated Solvents C
Halogenated Organics - Halogenated Solvents C
Metals - Arsenic C C
Metals - Lead C
Non-Halogenated Organics - Benzene C
Non-Halogenated Organics - Petroleum-Diesel C
Non-Halogenated Organics - Petroleum-Gasoline C
Pesticides - Non-Halogenated Pesticides C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.