Facility Site ID: 5378137 Cleanup Site ID: 1966

What's New?

  • In February 2018, the construction at the East Parcel (Embassy Suite Hotel) was completed.
  • In October 2012, the construction at the West Parcel (The Nolo) was completed.
  • Post ground water and air monitoring is being conducted at this time.

Consent Decree

In January 2014, Ecology, NLD and 255 South King Street LP signed a legal agreement called a Consent Decree (CD) for the new cleanup work at the East Parcel, completion of the work at the West Parcel, and document the work completed under the 2011 Prospective Purchaser Consent Decree. The new Consent Decree will supersede the 2011 Prospective Purchaser Consent Decree.

Site Background

This Site is located north of CenturyLink Field, at the southeast intersection of South King Street and Occidental Avenue South in Seattle, WA.  The Site is approximately 3.85 acres.

The property originally was undeveloped tide-flats of Elliott Bay. The area was filled in the late 1890s and early 1900s and used as a rail yard until the late 1960s. Structures associated with the rail yard included engine maintenance buildings, paint shops, and track switching and material storage areas. In addition, two gasoline stations were formerly located in the northwest portion of the property at different times during the late 1930s and during the 1960s.

King County purchased the property in the 1970s to assist construction of the Kingdome stadium to the south of the property. The Kingdome was demolished in the early 2000s and replaced with the Century Link Field. The property has been used as a parking lot since the 1970s and as a staging area during the construction of the Kingdome and CenturyLink Field stadiums. 

The site is being cleaned up and developed as part of an Inter-Modal regional transit hub. This hub is adjacent to King Street Station with approximately 1.5 million square feet of buildable area. The Site includes the West Parcel (201 South King Street) and East Parcel (255 South King Street).
 
North Lot Development (NLD) has initiated cleanup and construction at the West Parcel, and has completed most remedial activities on the West Parcel except for groundwater compliance monitoring and implementation of institutional controls on the Site. The West Parcel development encompasses a full city block with residential, retail uses and four floors of above-ground parking. 
 
NLD sold the East Parcel to the 255 South King Street LP, and maintains ownership of the West Parcel. The 255 South King Street LP conducted remedial activities on the East Parcel as part of their commitment for cleanup and development. The East Parcel development encompasses a full city block with a high-rise hotel and a commercial office/retail building with one level of below-ground parking.

Contaminants Of Concern

The known contaminants in Soil are:
  • Petroleum substances:
  • Gasoline
  • Diesel fuel
  • Motor Oil
  • Benzene, Toluene, Ethylbenzene, Xylenes (BTEX)
  • Metals – Arsenic and Mercury
  • Dioxins/furans
  • Polycyclic Aromatic Hydrocarbons (PAHs)

The known contaminants of concern for Groundwater are: 
    • Petroleum substances:
            Gasoline 
            Diesel fuel 
            Motor Oil 
            Benzene

  • Arsenic 
  • PAHs

Site use restrictions called institutional controls are in effect

Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.

Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.

Environmental Covenant

County Recording #: 20211217001425
County Recording Date: 12/17/2021

Restrictions/Requirements

  • Maintain/Protect Monitoring System
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Domestic Ground Water Extraction/Well Installation

Restricted Media

  • Groundwater
  • Soil

Environmental Covenant

County Recording #: 20200722001461
County Recording Date: 7/22/2020

Restrictions/Requirements

  • Maintain/Protect Monitoring System
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Domestic Ground Water Extraction/Well Installation

Restricted Media

  • Groundwater
  • Soil
Legal 6
Document Title Document Date Document Type
Minor Amendment to Consent Decree 2/2/2022 Administrative Order on Consent Amendment
Environmental Covenant for North Lot East Parcel 12/17/2021 Environmental Covenant; Alternative Mechanism
Environmental Covenant for North Lot West Parcel 7/22/2020 Environmental Covenant; Alternative Mechanism
North Lot Development - Final Consent Decree Exhibit D-G 1/14/2014 Consent Decree
North Lot Development - Final Consent Decree with Exhibit A- C 1/14/2014 Consent Decree
North Lot Development - PPCD (signed) 8/12/2011 Consent Decree
Map 1
Document Title Document Date Document Type
North Lot Development Ground level Site Map 1-12-2011 1/12/2011 Map
Public Information 4
Document Title Document Date Document Type
North Lot Development - Consent Decree Fact Sheet 11/6/2013 Fact Sheet\Public Notices
North Lot Development - Consent Decree Exhibit E - Public Participation Plan 11/6/2013 Public Participation Plan
North Lot Development Purchaser Consent Decree Fact Sheet June 17 2011 6/17/2011 Fact Sheet\Public Notices
North Lot Development Public Participation Plan 5-31-2011 5/31/2011 Public Participation Plan
Technical Reports 38
Document Title Document Date Document Type
2023 Annual Cap Inspection Memo 8/1/2023 Operation and Maintenance Plan
2022 Annual Cap Inspection Memo 7/30/2022 Operation and Maintenance Plan
2021 Annual Cap Inspection Memo 7/28/2021 Operation and Maintenance Plan
Groundwater and Indoor Air Monitoirng Requirements 1/12/2021 Site Specific Technical Document - other
Request for Reduced Compliance Groundwater Monitoring 12/18/2020 Site Specific Technical Document - other
Indoor Vapor Trend Evaluation 6/15/2020 Site Specific Technical Document - other
Annual Groundwater and Indoor Vapor Monitoring - 2020 3/27/2020 Performance/Confirmational Monitoring Plan or Report
Groundwater Monitoring Report - Second Quarter 2019 8/8/2019 Performance/Confirmational Monitoring Plan or Report
Groundwater Monitoring Report - First Quarter 2019 4/28/2019 Performance/Confirmational Monitoring Plan or Report
Indoor Air Assessment Report, First Quarter 2019 4/28/2019 Performance/Confirmational Monitoring Plan or Report
Indoor Air Assessment Report, Fourth Quarter 2018 1/14/2019 Performance/Confirmational Monitoring Plan or Report
Groundwater Monitoring Report - Fourth Quarter 2018 1/14/2019 Groundwater Monitoring Report
Cleanup Action Report - East Parcel, North Lot Property 1/10/2019 Remedial Action/As-Built Report
Indoor Air Assessment Report, Third Quarter 2018 10/28/2018 Performance/Confirmational Monitoring Plan or Report
Groundwater Monitoring Report - Third Quarter 2018 10/28/2018 Groundwater Monitoring Report
Groundwater and Indoor Air Monitoring Requirements 7/19/2018 Performance/Confirmational Monitoring Plan or Report
Indoor Air Assessment Report, First Quarter 2018 6/2/2018 Performance/Confirmational Monitoring Plan or Report
Groundwater Monitoring Report - Second Quarter 2018 6/2/2018 Groundwater Monitoring Report
Groundwater Monitoring Report - First Quarter 2018 2/28/2018 Groundwater Monitoring Report
Groundwater Monitoring Report - Third Quarter 2017 8/30/2017 Groundwater Monitoring Report
Engineering Design Report Addendum 2/24/2014 Engineering Design Report
North Lot Development - Cleanup Action Plan Addendum 9/18/2013 Cleanup Action Plan
North Lot Development - Site Status Letter 12/3/2012 Remedial Action Report
Request for Partial Certificate of Completion - West Block 10/19/2012 Remedial Action Report
Cleanup Action Report - West Block 10/19/2012 Remedial Action Report
Final Revised Cleanup Action Plan 9/27/2012 Cleanup Action Plan
North Lot Development - Feasibility Study Addendum 9/27/2012 Feasibility Study
North Lot Development - 30 day Notice for Underground Storage Tank (Jan 2012) 1/4/2012 Site Specific Administrative Document - other (Administrative correspondence)
North Lot Development - Engineering Design Report (July 2011) 7/5/2011 Engineering Design Report
North Lot Development Cleanup Action Plan 7/1/2011 Cleanup Action Plan
North Lot Development Draft Remedial Investigation Report 5-23-2011 5/23/2011 Remedial Investigation Report
North Lot Development Draft Feasibility Study 5-23-2011 5/23/2011 Feasibility Study
North Lot Development - Soils Handling Disposal Plan (May 2011) 5/18/2011 Site Specific Administrative Document - other (Administrative correspondence)
North Lot Development - Dust Suppression Plan (May 2011) 5/18/2011 Site Specific Technical Document - other
North Lot Development - Stormwater Pollution Prevention Plan (May 2011) 5/6/2011 Site Specific Administrative Document - other (Administrative correspondence)
Focused Soil Vapor Investigation Report 11/19/2010 Remedial Investigation Report
North Lot Development - EIS Addendum 11/5/2009 Site Specific Technical Document - other
North Lot Revised RI October 2009 10/16/2009 Remedial Investigation Report
Voluntary Cleanup Program 6
Document Title Document Date Document Type
North Lot Development - Ecology's Opinion on the Draft Feasibility Study Addendum 7/11/2012 VCP Opinion on Site Cleanup – Other
North Lot Development - VCP Opinion on Proposed Property Cleanup - NFA Likely 4/26/2011 VCP Opinion on Property Cleanup – Other
North Lot Development - VCP Opinion on Proposed Site Cleanup 3/25/2011 VCP Opinion on Site Cleanup – Other
North Lot Development - Opinion Letter on the Draft Feasibility Study (Aug. 2010) 8/12/2010 Voluntary Cleanup Program Opinion – Other
North Lot Development - Opinion Letter (February 2010) 2/25/2010 Voluntary Cleanup Program Opinion – Other
North Lot Development - Opinion Letter (July 2009) 7/13/2009 Voluntary Cleanup Program Opinion – Other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.
  • Seattle Public Library - Central
    1000 Fourth Ave
    Seattle, 98104
    This location may only have print documents available during open comment periods.
  • Seattle Public Library - International District
    713 8th Ave S
    Seattle, 98104
    This location may only have print documents available during open comment periods.

Contaminants 9

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Dioxins/Furans C
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons C C
Metals - Arsenic C C
Metals - Mercury C
Non-Halogenated Organics - Benzene C C
Non-Halogenated Organics - Other Non-Halogenated Organics C
Non-Halogenated Organics - Petroleum-Diesel C C
Non-Halogenated Organics - Petroleum-Gasoline C C
Non-Halogenated Organics - Petroleum-Other C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.