Fieldwork on Bellingham's busy working waterfront
Over the last seven years, we’ve overseen the cleanup of portions of the Central Waterfront site on Bellingham Bay. The Port of Bellingham and the City of Bellingham are getting ready to advance the site to its final cleanup step. First, we need additional information to help design the remaining cleanup work.
Contractors will test the soil, groundwater, and air on this busy working waterfront site.
The planned fieldwork, called a pre-remedial design investigation, will provide additional information to complete engineering design of the final cleanup action.
Want to learn more?
Visit our blog to read about Ecology's Central Waterfront fieldwork.
Site Timeline
- 2020: Finalized the Cleanup Action Plan. Based on Ecology's evaluation of the comments, we revised the final document. Download Response to Comments
- 2021-2022: Complete design and permitting for the cleanup action.
- 2022: Estimated implementation of cleanup action (construction).
General Cleanup Process
Public Participation
This plan includes information for the public regarding opportunities to get involved in the Site cleanup process. The outreach activities and mechanisms presented reflect Ecology’s current plans for keeping the public informed and for receiving information and comments from the public.
Site Information
Site History
The Central Waterfront cleanup site is made up of about 51 acres on Bellingham’s downtown waterfront, between I & J Waterway and Whatcom Waterway, and between Roeder Avenue and the former Georgia-Pacific industrial wastewater treatment lagoon. Property within the site is owned primarily by the Port of Bellingham or City of Bellingham. Beginning in the early 1900s, the site and surrounding tidelands were filled for various industrial uses.
Contamination
Investigations to date have found contaminants in soil, groundwater, and sediment associated with historical industrial uses:
- Soil: metals, petroleum hydrocarbons, polycyclic aromatic hydrocarbons, and volatile organic compounds. Buried municipal refuse and wood waste and associated methane gas.
- Groundwater: metals, petroleum hydrocarbons, polycyclic aromatic hydrocarbons, volatile and semi-volatile organic compounds.
- Sediment: metals. This was addressed by the Whatcom Waterway, Phase 1 cleanup in 2016.
Contaminant levels are present at potentially harmful levels and must be addressed under Washington's toxics cleanup law, the Model Toxics Control Act (MTCA).
Previous cleanup work
2013: Early cleanup at former Chevron bulk fuel storage facility:
- Removed 800 cubic yards of petroleum-contaminated soil and sediment.
- Removed timber piles, oil, and contaminated groundwater.
- Installed a waterproof barrier.
- Restored the beach area with clean sand, gravel, and rock.
2016: Whatcom Waterway, Phase 1 cleanup:
- Dredged and capped contaminated sediments.
- Built a sheet-pile containment wall.
2016 – 2017: C Street Terminal Improvements:
- Rehabilitated utilities and upland infrastructure.
- Improved stormwater collection and treatment systems.
- Removed and/or capped (paved) contaminated soil.
2017: All American Marine building
- Built 54,000 square-foot boat manufacturing building (with landfill gas control system) with adjacent pavement that caps and prevents exposure to contaminated soil and refuse.
- Created a gravel boat launch route that caps contaminated soil.
- Properly disposed of contaminated materials encountered during construction.
Bellingham Bay Demonstration Pilot
The Central Waterfront site is one of 12 sites coordinated through the Bellingham Bay Demonstration Pilot. The Pilot is a bay-wide multi-agency effort to clean up contaminated sediment, control sources of sediment contamination, and restore habitat, with consideration for land and water uses. In 2000, participants in this initiative developed the Bellingham Bay Comprehensive Strategy.
Key Documents
- Central Waterfront - Response to Comments AO Amend, CAP, SEPA DNS - January 2020
- Central Waterfront - Draft Cleanup Action Plan Public Meeting - September 18, 2019
- Central Waterfront Interim Action Completion Report All American Marine 2018
- Central Waterfront AO Amend, CAP, SEPA DNS Fact Sheet 2019
- Central Waterfront Interim Action Completion Report C Street Terminal 2018
- Central Waterfront RI-FS Fact Sheet 2017
- Central Waterfront Interim Action 2016 - Workplan
- Central Waterfront Interim Action 2016 - Fact Sheet
- Central Waterfront Interim Action 2016 -Response to Commments
Translated Content
El Departamento de Ecología le invita a revisor los documentos para el sitio que está contaminado Central Waterfront en Bellingham.
Si le gustaría recibir este documento en español, por favor llame a 425-240-4353 y espere a que un intérprete se una a la llamada o envíe un correo electrónico a preguntas@ecy.wa.gov. Traducciones de avisos públicos para los sitios de limpieza de la Bahía de Bellingham se preparan bajo solicitud.
Requesting Accommodation
If you speak a non-English language, free language services are available.
Documents 52
Legal 8
Document Title | Document Date | Document Type |
Central Waterfront - Third Amendment to Agreed Order Final - February 2020 | 2/18/2020 | Agreed Order Amendment |
Central Waterfront - Signed 2nd Amendment to Agreed Order & Exhibit G - Scope of Work and Schedule | 11/13/2018 | Agreed Order Amendment |
Central Waterfront - Second Amendment to Agreed Order Scope of Work & Schedule Draft - August 2018 | 8/20/2018 | Agreed Order Amendment |
Central Waterfront - Second Amendment to Agreed Order Draft - August 2018 | 8/20/2018 | Agreed Order Amendment |
Central Waterfront - First amendment to AO for interim action, signed | 9/25/2012 | Agreed Order Amendment |
Central Waterfront agreed order first amendment interim action location map | 7/17/2012 | Agreed Order Amendment |
Central Waterfront In the Matter of Remedial Action by: The Port of Bellingham and the City of Bellingham | 9/26/2006 | Agreed Order |
Central Waterfront In the Matter of Remedial Action by: The Port of Bellingham and the City of Bellingham | 5/11/2006 | Agreed Order |
Public Information 16
State Environmental Policy Act 2
Document Title | Document Date | Document Type |
Central Waterfront - SEPA DNS for AO Amendment and CAP - July 2019 | 7/1/2019 | SEPA Documents |
Bellingham Bay Comprehensive Strategy - SEPA - Environmental Impact Statement | 10/1/2000 | SEPA Documents |
Technical Reports 26
Places to see print documents
-
Northwest Regional Office15700 Dayton Ave NShoreline, 98133Please schedule an appointment to view print documents at this location.
-
Ecology Bellingham Field Office913 Squalicum Way, Unit 101Bellingham, 98225This location may only have print documents available during open comment periods.
-
Bellingham Public Library210 Central AveBellingham, 98225This location may only have print documents available during open comment periods.
Contaminants 18
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Other Contaminant - Base/Neutral/Acid Organics | S | S | S | |||
Halogenated Organics - Halogenated Organics | S | S | S | |||
Metals - Metals Priority Pollutants | C | C | ||||
Metals - Metals - Other | C | |||||
Non-Halogenated Organics - Petroleum Products-Unspecified | S | S | S | |||
Non-Halogenated Organics - Phenolic Compounds | S | S | S | S | ||
Non-Halogenated Organics - Non-Halogenated Solvents | C | C | C | S | ||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | S | ||||
Other Contaminant - Conventional Contaminants, Organic | C | |||||
Metals - Arsenic | C | |||||
Metals - Lead | C | C | ||||
Metals - Mercury | C | |||||
Halogenated Organics - Other Halogenated Organics | S | |||||
Non-Halogenated Organics - Benzene | C | C | ||||
Non-Halogenated Organics - Other Non-Halogenated Organics | C | |||||
Non-Halogenated Organics - Petroleum-Diesel | C | C | ||||
Non-Halogenated Organics - Petroleum-Gasoline | C | C | ||||
Non-Halogenated Organics - Petroleum-Other | C | C | C | S |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated