Solid Wood Inc
Site Description
Solid Wood Inc is a cleanup site in West Olympia. The site lies on the West Bay of Budd Inlet, east of West Bay Drive and north of the Fourth Avenue Bridge. The site includes the former mill area, former railroad right-of-way, and peninsula.
This site was used as a lumber mill from 1925 to 1959. The Port of Olympia bought the site in 1963 and used it to store logs. Then, the Solid Wood plywood veneer mill operated from 1971 until the facility burned down in 2001.
Now, the City of Olympia owns the site and is the potentially liable person responsible for investigating and cleaning up toxic contamination at the site. Ecology oversees cleanup and partially funds the work through a remedial action grant. Removing toxic contamination is an important step towards the city’s future vision of West Bay Park. To learn more about the park, please visit the City of Olympia's West Bay Park webpage.
2026 Interim Action Plan
The interim action, or partial cleanup, will remove contaminated soil from four areas in the undeveloped area of the site. Ecology and the city planned the location and depth of excavation areas based on previous sampling work. More sampling work will happen before excavation begins to design the exact excavation areas. Confirmation samples will also be collected after excavation, to confirm that the cleanup is effective. The interim action will also remove about 600 feet of rail track. Please refer to the interim action plan for more detailed information and figures.
Soil near the former mill foundation is contaminated with heavy oil and diesel (total petroleum hydrocarbons). About 211 cubic yards of contaminated soil will be excavated up to a maximum depth of eight feet.
Soil along the rail tracks is contaminated with carcinogenic polycyclic aromatic hydrocarbons (cPAHs) in three areas. About 395 cubic yards of contaminated soil, up to a maximum depth of six feet, will be excavated from the area closest to West Bay Park. About 345 cubic yards will be excavated from the middle area, digging to a maximum depth of one foot. Further south along the rail spur, the last excavation area will be about 275 cubic yards from a maximum depth of one foot.
Groundwater wells along the shoreline did not detect contamination. One groundwater well near the former mill foundation had contaminants, at concentrations below cleanup levels. By removing contaminated soil, the interim action should stop any pollutants from leaching into groundwater.
For information about permit exemptions and schedule, please refer to the fact sheet.
Ecology held a public comment period from July 9 to August 10, 2026, for an agreed order amendment and the draft interim action plan. We received four comments and responded to them.
Public Involvement Opportunities
Thank you for your interest in the Solid Wood Inc cleanup site!
To get added to our email list, please reach out to the staff listed in the left sidebar. We will send you emails about public comment periods and public outreach events.
To subscribe to automatic updates from our system, click the blue “Subscribe to this site” button at the top right corner of this webpage. Subscribers receive a weekly automated email whenever there’s an open comment period or a new document uploaded to this webpage. Read more about this feature on Ecology’s blog.
Documents 59
Legal 4
| Document Title | Document Date | Document Type |
| Agreed Order Amendment | 8/26/2026 | Agreed Order Amendment |
| Agreed Order Amendment without Exhibit G: Interim Action Plan | 8/24/2026 | Agreed Order Amendment |
| Solid Wood Agreed Order June 2008 Pre-Comment Period | 11/17/2008 | Agreed Order |
| Solid Wood Inc Agreed Order Scanned Original Copy | 11/17/2008 | Agreed Order |
Outreach Information 7
| Document Title | Document Date | Document Type |
| Solid Wood 2026 Responsiveness Summary | 8/26/2026 | Responsiveness Summary |
| Solid Wood Interim Action Public Comment Period 2026 | 7/8/2026 | Fact Sheet\Public Notices |
| Solid Wood Inc Responsiveness Summary | 1/1/2009 | Responsiveness Summary |
| Solid Wood Revised Public Participation Plan Agreed Order Appendix C | 11/3/2008 | Public Participation Plan |
| Solid Wood Inc Revised Agreed Order and Work Plan Available for Public Review and Comment | 11/1/2008 | Fact Sheet\Public Notices |
| Solid Wood Inc Fact Sheet Agreed Order to begin cleanup. | 6/30/2008 | Fact Sheet\Public Notices |
| Solid Wood Inc Public Participation Plan | 3/1/2008 | Public Participation Plan |
State Environmental Policy Act 3
| Document Title | Document Date | Document Type |
| Solid Wood Determination of Non-Significance | 7/7/2026 | SEPA Documents |
| Solid Wood SEPA Mitigated Determination of Non-Significance | 4/29/2008 | SEPA Documents |
| Solid Wood SEPA Checklist for RI/FS Work Plan and Interim Action (West Bay Park) | 2/20/2008 | SEPA Documents |
Technical Reports 45
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 4
| Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
|---|---|---|---|---|---|---|
| Metals - Metals Priority Pollutants | B | B | B | |||
| Non-Halogenated Organics - Petroleum Products-Unspecified | C | C | B | |||
| Halogenated Organics - Dioxins/Furans | B | S | ||||
| Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | B | S |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated