Phillips 66 Renton Terminal

Facility Site ID: 2070 Cleanup Site ID: 29

This site has confirmed or suspected contamination that could potentially harm people and the environment. It is in the state cleanup process under the Model Toxics Control Act.

See the Site Details report at left or the documents below to learn more about this site.

Ecology works to clean up contaminated properties throughout the state. Cleanups are construction projects that remove, treat, or contain potentially harmful substances.

Site use restrictions called institutional controls are in effect

Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.

Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.

Environmental Covenant

County Recording #: 20170413000090
County Recording Date: 4/13/2017

Restrictions/Requirements

  • Ongoing Maintenance of Remedy
  • Prevent the Reuse or Relocation of Site Soil
  • Prohibit Soil Disturbance
  • Restrict All Ground Water Extraction/Well Installation
  • Restrict Land Use

Restricted Media

  • Groundwater
Legal 4
Document Title Document Date Document Type
Phillips 66 Renton Terminal - Environmental Covenant 4/13/2017 Environmental Covenant; Alternative Mechanism
Phillips 66 Renton Terminal - Agreed Order 2015 8/21/2015 Agreed Order
Conoco Phillips Renton Terminal AO 8/27/2010 Agreed Order
ConocoPhillips Renton Terminal Draft Agreed Order 8/5/2010 Agreed Order
Public Information 6
Document Title Document Date Document Type
Phillips 66 Renton Terminal - Fact Sheet 8/21/2015 Fact Sheet\Public Notices
Phillips 66 Renton Terminal - Public Participation Plan 2015 8/21/2015 Public Participation Plan
Phillips 66 Renton Terminal - Public Participation Plan 2015 8/21/2015 Public Participation Plan
ConocoPhillips Renton Terminal Fact Sheet RI-FS WP and Revised Interim Compliance Monitoring Plan Available 4/1/2011 Fact Sheet\Public Notices
Conocophillips Renton Terminal PPP 6/30/2010 Public Participation Plan
ConocoPhillips Renton Terminal Fact Sheet 6/18/2010 Fact Sheet\Public Notices
State Environmental Policy Act 5
Document Title Document Date Document Type
Phillips 66 Renton Terminal - SEPA 8/21/2015 SEPA Documents
Phillips 66 Rentonl Terminal - DNS 8/21/2015 SEPA Documents
DNS for conocophillips and exxonmobil 6/3/2010 SEPA Documents
environmental checklist for exxonmobil 6/2/2010 SEPA Documents
environmental checklist for conocophillips 6/2/2010 SEPA Documents
Technical Reports 40
Document Title Document Date Document Type
Phillips 66 Renton Terminal - 4th Qtr 2023 GWM and O&M Report 1/29/2024 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Third Quarter 2023 GWM, O&M Report 11/3/2023 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Second Quarter 2023 GWM, O&M Report 7/31/2023 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - First Quarter 2023 Groundwater Monitoring, Operations and Maintenance Report 5/2/2023 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Fourth Quarter 2022 Groundwater Monitoring, Operations and Maintenance Report 1/20/2023 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Third Quarter 2022 Groundwater Monitoring and Operations & Maintenance Report 10/14/2022 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Second Quarter 2022 Groundwater Monitoring, Operations and Maintenance Report 7/28/2022 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - First Quarter 2022 Groundwater Monitoring, Operations and Maintenance Report 4/21/2022 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Third Quarter 2021 Groundwater Monitoring, Operations and Maintenance Report 11/11/2021 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Second Quarter 2021 Groundwater Monitoring, Operations and Maintenance Report 9/8/2021 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Fourth Quarter 2020 Groundwater Monitoring, Operations and Maintenance Report 2/16/2021 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Third Quarter 2020 Groundwater Monitoring, Operations and Maintenance Report 12/11/2020 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Second Quarter 2020 Groundwater Monitoring, Operations and Maintenance Report Phillips 66 Renton Terminal 8/17/2020 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Appendices First Quarter 2020 Groundwater Monitoring, Operations and Maintenance Report 4/28/2020 Groundwater Monitoring Report
Phillips 66 Renton Terminal - First Quarter 2020 Groundwater Monitoring, Operations and Maintenance Report 4/28/2020 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Fourth Quarter 2019 Groundwater Monitoring, Operations and Maintenance Report 2/18/2020 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Third Quarter 2019 Groundwater Monitoring, Operations and Maintenance Report 12/23/2019 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Second Quarter 2019 Groundwater Monitoring, Operations and Maintenance Report 9/11/2019 Groundwater Monitoring Report
Phillips 66 Renton Terminal - First Quarter 2019 Groundwater Monitoring, Operations and Maintenance Report 5/24/2019 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Third Quarter 2018 Groundwater Monitoring and Operations and Maintenance Report 12/11/2018 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Second Quarter 2018 Groundwater Monitoring, Operations and Maintenance Report 8/31/2018 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Interim Remedial Action Report (Retention basin remedial excavation) 6/20/2018 Remedial Action Report
Phillips 66 Renton Terminal - First Quarter 2018 Groundwater Monitoring, Operations and Maintenance Report 5/24/2018 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Compliance Monitoring Plan 10/19/2016 Performance/Confirmational Monitoring Plan or Report
Phillips 66 Renton Terminal - Remedial Investigation/Feasibility Study 8/21/2015 Remedial Investigation / Feasibility Study
Phillips 66 Renton Terminal - Final Cleanup Action Plan 2015 8/21/2015 Cleanup Action Plan
Phillips 66 Renton Terminal - Remediation Progress Report - First Quarter 2014 12/1/2014 Progress Report
Phillips 66 Renton Terminal - Groundwater Monitoring Report - Fourth Quarter 2013 8/1/2014 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Groundwater Monitoring Report - First Quarter 2014 8/1/2014 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Groundwater Monitoring Report - Third Quarter 2013 7/25/2014 Groundwater Monitoring Report
Phillips 66 Renton Terminal - Remediation Progress Report - Third Quarter 2013 7/1/2014 Progress Report
Phillips 66 Renton Terminal - Remediation Progress Report - Fourth Quarter 2013 7/1/2014 Progress Report
ConocoPhillips Renton Terminal Addendum to the Interim Action Work Plan 4/1/2011 Interim Action Documents
ConocoPhillips Renton Terminal Draft RI/FS Workplan Appendix C Part 4 2/1/2011 Remedial Investigation Work Plan
ConocoPhillips Renton Terminal Draft RI/FS Workplan Appendix C Part 3 2/1/2011 Remedial Investigation Work Plan
ConocoPhillips Renton Terminal Draft RI/FS Workplan Appendix C Part 2 2/1/2011 Remedial Investigation Work Plan
ConocoPhillips Renton Terminal Draft RI/FS Workplan Appendix C Part 1 2/1/2011 Remedial Investigation Work Plan
ConocoPhillips Renton Terminal Draft RI/FS Workplan (No Appendix A/C) 2/1/2011 Remedial Investigation Work Plan
conocophillips work plan 11/6/2009 Interim Action Documents
Draft Exxon Mobil Work Plan 10/8/2009 Interim Action Documents
Voluntary Cleanup Program 1
Document Title Document Date Document Type
Phillips 66 Renton Terminal—NW1259 VCP Termination 4/9/2008 VCP Administrative Document
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.
  • Renton Public Library
    100 Mill Ave S
    Renton, 98057
    This location may only have print documents available during open comment periods.

Contaminants 1

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Non-Halogenated Organics - Petroleum Products-Unspecified C C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.