Facility Site ID: 47779679 Cleanup Site ID: 12260

West Of 4Th Cleanup

West of 4th is an Ecology cleanup that includes four responsible parties conducting a joint cleanup between Fourth Avenue South and the Duwamish Waterway, and between South Lucille and Fidalgo streets. The four parties have completed remedial investigations in the area west of 4th Ave. S.  Together they are evaluating cleanup remedies for the contamination and developing specific cleanup proposals, all leading to a future proposed cleanup action plan. These elements will be subject to public review and formal comment periods prior to adoption by Ecology.

The four parties to the agreed order (legal document) with Ecology are:

Stericyle (formerly known as Burlington Environmental, or PSC Environmental Services), 734 S. Lucile St. (a closed hazardous waste treatment and storage facility, located four blocks east  of 4th Ave. S.).

Blaser Die Casting, Co., 5700 3rd Ave. S.

Capital Industries, Inc., 5800 3rd Ave.

Art Brass Plating, Inc. 5516 3rd. Ave. S.

For more information click here.

Legal 2
Document Title Document Date Document Type
FIRST AMENDMENT TO AGREED ORDER 8/30/2017 Agreed Order Amendment
Agreed Order DE10402 1/7/2014 Agreed Order
Map 3
Document Title Document Date Document Type
Site Map 12/1/2013 Map
Site Diagram West of 4th - Burlington Environmental 12/1/2013 Map
Site Diagram East of 4th - Burlington Environmental 4/28/2010 Map
Public Information 16
Document Title Document Date Document Type
West of 4th Public Participation Plan 6/13/2023 Public Participation Plan
West of 4th Public Notice - Chinese 6/13/2023 Fact Sheet\Public Notices
West of 4th Public Notice - Vietnamese 6/13/2023 Fact Sheet\Public Notices
West of 4th Public Notice - Khmer 6/13/2023 Fact Sheet\Public Notices
West of 4th Public Notice - Spanish 6/13/2023 Fact Sheet\Public Notices
West of 4th Public Notice - English 6/13/2023 Fact Sheet\Public Notices
West of 4th Responsiveness Summary Agreed Order 11/20/2017 Responsiveness Summary
West of 4th Comment Period Mailer 9/28/2017 Fact Sheet\Public Notices
Glossary of Terms 8/29/2017 Fact Sheet\Public Notices
ATSDR Public Health Statement, TCE 11/1/2016 Fact Sheet\Public Notices
EPA Factsheet 1,4 dioxane 1/1/2014 Fact Sheet\Public Notices
EPA Citizen Guide to in Situ chemical reduction 9/1/2012 Fact Sheet\Public Notices
EPA Citizen Guide to in Situ chemical oxidation 9/1/2012 Fact Sheet\Public Notices
EPA Citizen Guide to Bioremediation 9/1/2012 Fact Sheet\Public Notices
ATSDR Public Health Statement, Vinyl Chloride 7/1/2006 Fact Sheet\Public Notices
ATSDR Public Health Statement, Nickel 8/1/2005 Fact Sheet\Public Notices
State Environmental Policy Act 1
Document Title Document Date Document Type
West of 4th SEPA DNS 9/22/2017 SEPA Documents
Technical Reports 36
Document Title Document Date Document Type
Feasibility Study Addendum SU2 - W of 4th - FINAL 5/1/2023 Feasibility Study
Feasibility Study Addendum SU1 - W of 4th - FINAL 5/1/2023 Feasibility Study
Clean Earth Letter 2020 6/3/2020 Site Specific Administrative Document - other (Administrative correspondence)
Addendum to In Situ Metals Immobilization Pilot Study Field Implementation Work Plan - Site Unit 1 7/17/2019 Feasibility Study
Draft Capital Industries Plant 4 Interim Action - Stage 1 In-Situ Chemical Oxidation Report 2/13/2019 Feasibility Study
Site Unit 2, Capitol Industries Interim Action Work Plan 1/12/2018 Interim Action Documents
2017 SU2 Interim Action Work Plan Revised 12/22/2017 Feasibility Study
2017 SU1 Metals Pilot Test Work Plan Final 12/21/2017 Feasibility Study
2017 SU1 Downgradient CVOC Pilot Test Work Plan FINAL 12/21/2017 Feasibility Study
Site Unit 2: Capital Industries Plant 4 Interim Action Approval Letter 11/22/2017 Feasibility Study
Site Unit 1, In Situ Metals Immobilization Pilot Testing Work Plan 11/22/2017 Feasibility Study
Site Unit 1, CVOC Pilot Study work Plan 11/22/2017 Feasibility Study
Capital Industries Plant 4 Interim Action Work Plan Unit 2 7/27/2017 Feasibility Study
CVOC PILOT STUDY WORK PLAN, Site Unit 1 6/14/2017 Feasibility Study
Draft IN SITU METALS IMMOBILIZATION -PILOT TESTING WORK PLAN 4/17/2017 Feasibility Study
Cover Letter: Draft In Situ Metals Immobilization Pilot Testing, Site Unit 1 4/17/2017 Feasibility Study
Letter: Revised Feasibility Study Report, Site Units 1 and 2 10/25/2016 Site Specific Administrative Document - other (Administrative correspondence)
FEASIBILITY STUDY Site Unit 2 Appendix A 8/11/2016 Feasibility Study
Feasibility Study Site Unit 2 8/11/2016 Feasibility Study
FEASIBILITY STUDY Site Unit 1 8/11/2016 Feasibility Study
Site Unite 1 FS Report APPENDIX A 8/11/2016 Feasibility Study
Site Wide Feasibility Study Submittal Letter 1/22/2008 Feasibility Study
Site Wide Feasibility Study-TM5: Remedial Alternatives Development and Evaluation 4/12/2007 Feasibility Study
Site Wide Feasibility Study-TM4: Technology Identification and Screening 1/10/2007 Feasibility Study
Site Wide Feasibility Study-TM2: Remediation Areas 6/30/2006 Feasibility Study
Site Wide Feasibility Study-TM1: Modeling, Cleanup Level, COCs, Remediation Levels, Conditional Points of Compliance, Schedule 6/23/2006 Feasibility Study
Site Wide Feasibility Study-TM3: Vapor Intrusion Assessment and Mitigation 5/26/2006 Feasibility Study
Draft Site Wide Feasibility Study Report 9/5/2005 Feasibility Study
Final Comprehensive Remedial Investigation Report - Vol 7 (8) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 6 (7) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 5 (6) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 4b (5) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 4a (4) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 3b (3) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 3a (2) 11/14/2003 Remedial Investigation Report
Final Comprehensive Remedial Investigation Report - Vol 1 and 2 (1) 11/14/2003 Remedial Investigation Report
Voluntary Cleanup Program 1
Document Title Document Date Document Type
Art Brass Plating Inc - VCP Status Request Letter 5/27/2008 VCP Administrative Document
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Contaminants 1

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Other Halogenated Organics C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.