Cascade Pole Inc McFarland
Site Description
The Cascade Pole cleanup site is located at 1503 Marine Drive, at the north end of the Port of Olympia peninsula in Olympia. From 1957 to 1986, the Cascade Pole Company operated a wood-treating facility on property leased from the Port of Olympia. Before then, several other wood-treating businesses operated at the site.
Cascade Pole operated a wood treatment plant on the site from the 1930s to the 1980s. Creosote, a mixture of several different chemicals used to preserve wood, was released to the environment during the plant’s operation. Soil and groundwater were contaminated as a result.
The Port has been working on cleaning up the Cascade Pole site for several years. Ecology and Cascade Pole entered into a legal agreement in 1990 to begin cleaning up pollution at the site. Since that time, the Port of Olympia has taken over responsibility for the cleanup. Ecology and the Port have entered into several legal agreements to continue with cleanup efforts. Ecology is amending the most recent legal agreement (an agreed order) to include new cleanup actions.
The Port has taken several interim (partial) cleanup actions to contain much of the contamination. Ecology continues to work with the Port to make progress on the site cleanup.
Current Status
The port conducted an interim (partial cleanup) action to remove and cover contaminated soil in the North Point area during 2010.
In early 2012, the port installed a new system to treat contaminated groundwater from the site. The old system for treating contaminated groundwater began operating in 1993 and needed to be replaced. Long-term monitoring is continuing at the site.
Documents 80
Legal 10
Document Title | Document Date | Document Type |
Cascade Pole Amended Agreed Order 2 753 2010 | 6/21/2010 | Agreed Order Amendment |
Cascade Pole Amendment No. 1 to AO DE 00TCPSR-753 | 7/3/2004 | Agreed Order Amendment |
Cascade Pole Agreed Order 00TCPSR-753 2000 | 4/11/2000 | Agreed Order |
Cascade Pole Agreed Order DE 97TC-S417 | 4/24/1998 | Agreed Order |
Cascade Pole Consent Decree | 8/8/1996 | Consent Decree |
In the Matter of Remedial Action by: Cascade Pole Company | 11/12/1992 | Enforcement Order |
Cascade Pole Enforcement Order Amendment 2 | 2/22/1991 | Enforcement Order Amendment |
Cascade Pole Enforcement Order Amendment | 6/13/1990 | Enforcement Order Amendment |
Cascade Pole Consent Decree | 5/15/1990 | Consent Decree |
Cascade Pole Order | 10/16/1989 | Agreed Order |
Public Information 6
Document Title | Document Date | Document Type |
Cascade Pole Flyer for 2012 Canoe Journey Landing | 6/4/2012 | Fact Sheet\Public Notices |
Cascade Pole IAWP and SEPA Comment Period Responsiveness Summary | 7/30/2010 | Responsiveness Summary |
Cascade Pole Interim Action June 2010 | 5/10/2010 | Fact Sheet\Public Notices |
Cascade Pole Public Participation Plan | 4/1/2010 | Public Participation Plan |
Cascade Pole Fact Sheet Agreed Order Amendment Proposed | 6/1/2004 | Fact Sheet\Public Notices |
Cascade Pole Focus Sheet | 8/1/2001 | Focus Sheet |
State Environmental Policy Act 2
Document Title | Document Date | Document Type |
Cascade Pole SEPA DNS | 5/10/2010 | SEPA Documents |
Cascade Pole SEPA DNS | 6/1/2004 | SEPA Documents |
Technical Reports 62
Document Title | Document Date | Document Type |
Groundwater Monitoring Report | 12/15/2023 | Groundwater Monitoring Report |
Cascade Pole Co. Notification of Project Coordinator Designation | 3/6/2023 | Site Specific Administrative Document - other (Administrative correspondence) |
Groundwater Quality Results Dry Season 2021 Long-Term Groundwater Compliance Monitoring | 3/7/2022 | Groundwater Monitoring Report |
Cascade Pole Inc. McFarland - Groundwater Monitoring Report April 2020 through March 2021 | 7/1/2021 | Groundwater Monitoring Report |
Cascade Pole Inc Mcfarland - Groundwater Monitoring Report April 2019-March 2020 | 7/30/2020 | Groundwater Monitoring Report |
2020 Cathodic Protection Plan | 7/27/2020 | Performance/Confirmational Monitoring Plan or Report |
Second half groundwater monitoring report | 4/3/2020 | Performance/Confirmational Monitoring Plan or Report |
Cathodic Protection | 1/2/2020 | Performance/Confirmational Monitoring Plan or Report |
Expanded Extraction System | 1/2/2020 | Operation and Maintenance Plan |
Shoreline Containment Wall Investigation | 1/2/2020 | Remedial Investigation Report |
HolBrook/KGY soil investigation report | 1/2/2020 | Site Specific Technical Document - other |
Cathodic Protection Report | 12/31/2019 | Performance/Confirmational Monitoring Plan or Report |
April 2018 to March 2019 Long Term Groundwater Monitoring Data | 8/6/2019 | Performance/Confirmational Monitoring Plan or Report |
Groundwater Monitoring Report April 2018 through March 2019 Cascade Pole Site | 8/6/2019 | Groundwater Monitoring Report |
Evaluation of Groundwater Improvements to Groundwater extraction System | 4/29/2019 | Operation and Maintenance Plan |
Dry Season 2018 Long Term Groundwater Monitoring Report | 9/27/2018 | Performance/Confirmational Monitoring Plan or Report |
Groundwater Monitoring Report April 2017 through March 2018 | 9/14/2018 | Groundwater Monitoring Report |
2017 Dry season groundwater monitoring report | 1/23/2018 | Performance/Confirmational Monitoring Plan or Report |
2017 dry season groundwater monitoring report | 1/23/2018 | Performance/Confirmational Monitoring Plan or Report |
2017 dry season groundwater monitoring report | 1/23/2018 | Performance/Confirmational Monitoring Plan or Report |
Dry Season 2017 Long-Term Compliance Monitoring | 1/23/2018 | Performance/Confirmational Monitoring Plan or Report |
Dry Season 2017 Long-Term Compliance Monitoring | 1/23/2018 | Performance/Confirmational Monitoring Plan or Report |
2017 Sediment Quality Report | 1/5/2018 | Performance/Confirmational Monitoring Plan or Report |
2017 Cathodic Protection Test Results | 8/4/2017 | Performance/Confirmational Monitoring Plan or Report |
Sediment RI Data | 7/14/2017 | Remedial Investigation Report |
April 2016 through March 2017 Groundwater Monitoring Report | 7/7/2017 | Performance/Confirmational Monitoring Plan or Report |
Sediment RI Report | 7/5/2017 | Remedial Investigation Report |
Sediment RI Data | 6/1/2017 | Remedial Investigation Report |
Dry Season 2016 Long Term Groundwater Monitoring Results | 12/29/2016 | Performance/Confirmational Monitoring Plan or Report |
April 2015 March 2016 Groundwater monitoring Report | 8/18/2016 | Performance/Confirmational Monitoring Plan or Report |
Sheet Pile Wall Cathodic Protection Inspection Report | 6/30/2016 | Performance/Confirmational Monitoring Plan or Report |
2015 Cathodic Protection Annual Testing | 8/5/2015 | Performance/Confirmational Monitoring Plan or Report |
Groundwater Monitoring Report, April 2014 through March 2015 | 7/31/2015 | Performance/Confirmational Monitoring Plan or Report |
Dry Season 2014 Long Term Complaince Monitoring | 1/27/2015 | Performance/Confirmational Monitoring Plan or Report |
April 2013 - March 2014 Groundwater monitoring Report | 6/6/2014 | Performance/Confirmational Monitoring Plan or Report |
2012 Sediment Quality Monitoring Data | 1/16/2014 | Performance/Confirmational Monitoring Plan or Report |
Groundwater Monitoring Report April 2012 Through March 2013 | 10/4/2013 | Performance/Confirmational Monitoring Plan or Report |
2012-2013 long term groundwater monitoring | 10/3/2013 | Performance/Confirmational Monitoring Plan or Report |
2013 Cathodic Protection Report for the Containment Sheet Pile Wall | 10/1/2013 | Performance/Confirmational Monitoring Plan or Report |
October 2012 long-term compliance monitoring | 9/9/2013 | Performance/Confirmational Monitoring Plan or Report |
2012 Corrected Sediment Performance Monitoring | 4/29/2013 | Performance/Confirmational Monitoring Plan or Report |
Coirrected Sediment Quality Monitoring Results | 4/23/2013 | Performance/Confirmational Monitoring Plan or Report |
2012 Final Sediment Monitoring | 9/20/2012 | Performance/Confirmational Monitoring Plan or Report |
Groundwater Monitoring Report April 2011 through March 2012 | 7/22/2012 | Performance/Confirmational Monitoring Plan or Report |
Engineering Design Report/Summary of Capping and Stormwater Management System | 6/21/2012 | Site Specific Technical Document - other |
Corrosion Protection Testing for Sheet Pile Wall | 5/14/2012 | Performance/Confirmational Monitoring Plan or Report |
Cathodic Protection Inspection, Shoreline Containment Wall | 4/16/2012 | Performance/Confirmational Monitoring Plan or Report |
August 2011 Groundwater Monitoirng | 12/15/2011 | Groundwater Monitoring Report |
Groundwater Monitoring Report, February 2010 Through May 2011 | 12/15/2011 | Groundwater Monitoring Report |
North Point Compliance Monitoring Report | 7/12/2011 | Interim Action Documents |
Cascade Pole Groundwater Treatment Plant Engineering Design Report | 7/1/2010 | Engineering Design Report |
Cascade Pole Interim Action Work Plan North Point/Phase III | 4/26/2010 | Interim Action Documents |
Cascade Pole Cleanup Actions - Historical and Proposed | 1/1/2010 | Site Specific Technical Document - other |
Cascade Pole Timeline | 11/1/2009 | Site Specific Technical Document - other |
Deep Aquifer Hydrogelogy | 10/11/2007 | Remedial Investigation Report |
Biological Opinion | 4/13/2001 | Remedial Investigation Report |
Cleanup Action Plan Cascade POle Company Site Sediments Operable Unit | 4/11/2000 | Cleanup Action Plan |
Cadcade Pole/Olympia/Proposed Cutoff Wall and Storm Drain Remediation | 3/1/1999 | Remedial Action Report |
Cascade Pole/Olympia-Soil Exploration Program to Determine the Depth to Aquitard | 2/8/1999 | Site Specific Technical Document - other |
Cascade Pole/Olympia-Shoreline Area Investigation | 4/22/1997 | Remedial Investigation Report |
Remedial Investigation for Sediment | 1/22/1993 | Remedial Investigation Report |
Cascade Pole/Olympia-Supplemental Site Investigation, Volume II | 7/10/1992 | Remedial Investigation Report |
Places to see print documents
-
Southwest Regional Office300 Desmond Dr SELacey, 98503-1274Please schedule an appointment to view print documents at this location.
Contaminants 6
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Other Contaminant - Base/Neutral/Acid Organics | C | C | ||||
Metals - Metals Priority Pollutants | C | C | ||||
Non-Halogenated Organics - Petroleum Products-Unspecified | C | C | C | |||
Non-Halogenated Organics - Phenolic Compounds | C | C | C | |||
Halogenated Organics - Dioxins/Furans | C | C | C | R | ||
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons | C | C | C | R |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated