The Sudbury Road Landfill is about 4 miles west of the City of Walla Walla and ½ mile north of Highway 12. The landfill sits on 125 acres in a mainly rural area. The City of Walla Walla owns and operates the landfill, which is used for disposal of the area's municipal solid waste (MSW). It disposed MSW in unlined areas from 1978 to 2006. It continues to dispose of MSW today, though in an area of the landfill that is lined.
Since 1977, the City has tested groundwater from wells around the landfill. In 2001, the City installed a new well. Tests on water from this new well show the groundwater contains chemicals, including volatile organic compounds, at levels that may be harmful to human health and the environment. Follow-up tests show the landfill is at least in part contributing to these impacts to groundwater.
In January 2011, the City did some work at the site to prevent groundwater impacts from becoming worse. The City placed a cover and installed gas and stormwater control systems over one unlined landfill cell, and diverted stormwater run-on away from another unlined landfill cell.
In May 2011, the Washington Department of Ecology and the City of Walla Walla worked through an Agreed Order requiring further investigation of contaminants from the site. The Agreed Order required the City of Walla Walla to conduct a Remedial Investigation and Feasibility Study, which it completed in 2012-2014. The City found chemicals (tetrachloroethylene and vinyl chloride) within the site at levels that need cleanup. It did not find these chemicals off-site at levels that need cleanup. In the study, preferred cleanup actions include improvements to landfill cover and stormwater controls, installation of gas control system, long-term groundwater and gas monitoring, and restrictions on property use.
Through a May 2015 Consent Decree, the City began remedy construction as directed by a Cleanup Action Plan (CAP). The CAP included installation of landfill gas controls in three distinct areas, improved cover over two areas, improved grading to shed stormwater in one area, installation of stormwater controls at the northern edge of the landfill, ongoing groundwater monitoring, and property use restrictions through an Environmental Covenant. The City completed all construction in 2017, filed the Environmental Covenant in 2019, and monitors groundwater quarterly.
Ecology completed its first Periodic (5-Year) Review of cleanup effectiveness in 2022. Both contaminants of concern in groundwater (tetrachloroethylene and vinyl chloride) have decreased and have been at or below cleanup levels since March 2019 and December 2019, respectively.
Since 1977, the City has tested groundwater from wells around the landfill. In 2001, the City installed a new well. Tests on water from this new well show the groundwater contains chemicals, including volatile organic compounds, at levels that may be harmful to human health and the environment. Follow-up tests show the landfill is at least in part contributing to these impacts to groundwater.
In January 2011, the City did some work at the site to prevent groundwater impacts from becoming worse. The City placed a cover and installed gas and stormwater control systems over one unlined landfill cell, and diverted stormwater run-on away from another unlined landfill cell.
In May 2011, the Washington Department of Ecology and the City of Walla Walla worked through an Agreed Order requiring further investigation of contaminants from the site. The Agreed Order required the City of Walla Walla to conduct a Remedial Investigation and Feasibility Study, which it completed in 2012-2014. The City found chemicals (tetrachloroethylene and vinyl chloride) within the site at levels that need cleanup. It did not find these chemicals off-site at levels that need cleanup. In the study, preferred cleanup actions include improvements to landfill cover and stormwater controls, installation of gas control system, long-term groundwater and gas monitoring, and restrictions on property use.
Through a May 2015 Consent Decree, the City began remedy construction as directed by a Cleanup Action Plan (CAP). The CAP included installation of landfill gas controls in three distinct areas, improved cover over two areas, improved grading to shed stormwater in one area, installation of stormwater controls at the northern edge of the landfill, ongoing groundwater monitoring, and property use restrictions through an Environmental Covenant. The City completed all construction in 2017, filed the Environmental Covenant in 2019, and monitors groundwater quarterly.
Periodic review
Ecology completed its first Periodic (5-Year) Review of cleanup effectiveness in 2022. Both contaminants of concern in groundwater (tetrachloroethylene and vinyl chloride) have decreased and have been at or below cleanup levels since March 2019 and December 2019, respectively.
Site use restrictions called institutional controls are in effect
Institutional controls can be fences, signs, or restrictions on how the property is used. For instance, an institutional control may prohibit installing drinking water wells or disturbing a protective cap that isolates contamination. These restrictions keep the contamination contained and keep people from being exposed to the contamination. The controls are usually listed in environmental covenants recorded with the county.
Periodic reviews are required when institutional controls are required at a site. Ecology conducts reviews to make sure the controls remain effective and the cleanup still protects human health and the environment. We conduct periodic reviews about every five years.
Institutional Controls 1
Environmental Covenant
County Recording #:
2019-08284
County Recording Date:
10/16/2019
Restrictions/Requirements
- Restrict Land Use
Restricted Media
- Soil
Documents 53
Legal 11
Document Title | Document Date | Document Type |
Environmental Covenant | 10/16/2019 | Environmental Covenant; Alternative Mechanism |
Consent Decree Exhibit C - Scope of Work and Schedule | 8/19/2015 | Consent Decree |
Consent Decree Exhibit B - Cleanup Action Plan | 8/19/2015 | Consent Decree |
Consent Decree Exhibit A - Site Diagrams | 8/19/2015 | Consent Decree |
Consent Decree | 8/19/2015 | Consent Decree |
Consent Decree Exhibit E | 5/27/2015 | Consent Decree |
Consent Decree Exhibit D | 5/27/2015 | Consent Decree |
Consent Decree Exhibit C | 5/27/2015 | Consent Decree |
Consent Decree | 5/27/2015 | Consent Decree |
Consent Decree Exhibit A | 5/26/2015 | Consent Decree |
Agreed Order for RI/FS | 5/26/2011 | Agreed Order |
Public Information 5
Document Title | Document Date | Document Type |
Fact Sheet - Spanish | 5/27/2015 | Fact Sheet\Public Notices |
Fact Sheet - English | 5/27/2015 | Fact Sheet\Public Notices |
Response to Comment on Agreed Order | 5/23/2011 | Responsiveness Summary |
Fact Sheet: Sudbury Road Landfill Agreed Order Comment Period - Spanish | 4/1/2011 | Fact Sheet\Public Notices |
Fact Sheet: Sudbury Road Landfill Agreed Order Comment Period - English | 4/1/2011 | Fact Sheet\Public Notices |
State Environmental Policy Act 1
Document Title | Document Date | Document Type |
DNS and SEPA Checklist | 6/1/2015 | SEPA Documents |
Technical Reports 36
Document Title | Document Date | Document Type |
Sudbury Landfill Periodic Review 2022 | 7/5/2022 | Periodic Review (5 Year) |
SBRL OM Manual | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.5 | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.4 | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.3 | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.2 | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.1.c | 4/14/2017 | Operation and Maintenance Plan |
Appendix A.1.b | 4/14/2017 | Operation and Maintenance Plan |
Appedix A.1.a | 4/14/2017 | Operation and Maintenance Plan |
Operation and Maintenance Plan | 4/14/2017 | Operation and Maintenance Plan |
Construction Quality Assurance Certification Report | 4/14/2017 | Final Cleanup Action Report |
Engineering Design Report for Sudbury Landfill Remedial Action | 1/6/2016 | Engineering Design Report |
Construction Plans and Specs - Vol III CQA - Final | 1/1/2016 | Construction Plans and Specifications |
Construction Plans and Specs - Vol II - Final | 1/1/2016 | Construction Plans and Specifications |
Construction Plans and Specs - Vol I - Final | 1/1/2016 | Construction Plans and Specifications |
Sudbury Road Landfill Draft Cleanup Action Plan | 5/1/2015 | Cleanup Action Plan |
RIFS Final Draft Figure 3 | 10/3/2014 | Remedial Investigation / Feasibility Study |
Remedial Investigation and Feasibility Study Fact Sheet - Spanish | 10/2/2014 | Remedial Investigation / Feasibility Study |
Remedial Investigation and Feasibility Study Fact Sheet - English | 10/2/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 11 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 10 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 9 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 8 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 7 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 6 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 5 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 4 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 3 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 2 | 9/15/2014 | Remedial Investigation / Feasibility Study |
RIFS Final Draft App D 1 | 9/15/2014 | Remedial Investigation / Feasibility Study |
Remedial Investigation / Feasibility Study (RIFS) Final Draft | 9/15/2014 | Remedial Investigation / Feasibility Study |
Cleanup Alternatives Analysis | 11/8/2013 | Feasibility Study |
Remedial Investigation Work Plan | 12/28/2011 | Remedial Investigation Work Plan |
Interim Action Plan | 3/31/2010 | Interim Action Documents |
Historical Study Report | 1/1/2006 | Site Specific Technical Document - other |
Sudbury Road Landfill Historical Study Report | 1/1/2006 | Independent Reports |
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.
Places to see print documents
-
Eastern Regional OfficeN 4601 Monroe StSpokane, 99205-1265Please schedule an appointment to view print documents at this location.
Contaminants 5
Contaminant Type | Soil |
Groundwater |
Surface Water |
Air |
Sediment |
Bedrock |
---|---|---|---|---|---|---|
Halogenated Organics - Halogenated Organics | C | |||||
Metals - Metals - Other | S | |||||
Other Contaminant - Conventional Contaminants, Organic | S | |||||
Other Contaminant - Conventional Contaminants, Inorganic | C | |||||
Other Contaminant - Other Deleterious Substances | C |
- S
- Suspected
- C
- Confirmed Above Cleanup Levels
- B
- Below Cleanup Levels
- RA
- Remediated-Above
- RB
- Remediated-Below
- R
- Remediated