Publications Home



Environmental Assessment (3585 publications 1957-2024)

2024 · 2023 · 2022 · 2021 · 2020 · 2019 · 2018 · 2017 · 2016 · 2015 · 2014 · 2013 · 2012 · 2011 · 2010 · 2009 · 2008 · 2007 · 2006 · 2005 ·
2004 · 2003 · 2002 · 2001 · 2000 · 1999 · 1998 · 1997 · 1996 · 1995 · 1994 · 1993 · 1992 · 1991 · 1990 · 1989 · 1988 · 1987 · 1986 · 1985 ·
1984 · 1983 · 1982 · 1981 · 1980 · 1979 · 1978 · 1977 · 1976 · 1975 · 1974 · 1973 · 1972 · 1971 · 1970 · 1969 · 1968 · 1967 · 1964 · 1963 ·
1957 ·

Title (link to summary)NumberDate (released or updated)
Eyes Over Puget Sound: Surface Conditions Report – December 31, 2013 13-03-081December 2013
Eyes Over Puget Sound: Surface Conditions Report – November 21, 2013 13-03-080December 2013
Eyes Over Puget Sound: Surface Conditions Report – October 28, 2013 13-03-079December 2013
Lakewood Plaza Cleaners Groundwater Monitoring Results, June 2013: Data Summary Report 13-03-046December 2013
Shelton Laundry and Cleaners Groundwater Monitoring Results, July 2013: Data Summary Report 13-03-045December 2013
Measuring Mercury Trends in Freshwater Fish, 2012 Sampling Results 13-03-044December 2013
Addendum to Quality Assurance Project Plan: Ione Airport Kwik Stop Groundwater Monitoring 13-03-123November 2013
Addendum to Quality Assurance Project Plan: Roofing Materials Assessment: Investigation of Toxic Chemicals in Roof Runoff 13-03-122November 2013
Western Washington NPDES Phase I Stormwater Data Characterization: Interim Findings from 2007-2012 13-03-043November 2013
Stressor Identification for Peabody Creek (Port Angeles) 13-03-040November 2013
River and Stream Water Quality Monitoring Report, Water Year 2012 13-03-042October 2013
Copper in Surface Waters from Urban and Agricultural Watersheds 13-03-041October 2013
Dictionary of Metrics for Physical Habitat: Definitions and Calculations Used for Watershed Health Monitoring and Related Studies 13-03-033October 2013
Lake Loma Phosphorus Screening-Level Assessment 13-03-031October 2013
Addendum 2 to Quality Assurance Project Plan: Palouse River Dissolved Oxygen and pH Total Maximum Daily Load Water Quality Study Design 13-03-120September 2013
Addendum 3 to Quality Assurance Project Plan: Depositional History of Mercury in Selected Washington Lakes Determined from Sediment Cores 13-03-119September 2013
Quality Assurance Project Plan: Cowiche Creek Vegetation and Shade Study 13-03-118September 2013
Wide Hollow Creek Water Quality Study for Aquatic Life Use Water Quality Study Design (Quality Assurance Project Plan) 13-03-116September 2013
Eyes Over Puget Sound: Surface Conditions Report – September 11, 2013 13-03-078September 2013
Quantification of Pharmaceuticals, Personal Care Products, and Perfluoroalkyl Substances in the Marine Sediments of Puget Sound, Washington, USA. Article in Environmental Toxicology and Chemistry. 13-03-038September 2013
Hydrodynamic Model Report: Quartermaster Harbor Nitrogen Management Study 13-03-026September 2013
Quality Assurance Project Plan: Yakima Railroad Area Groundwater Performance Monitoring 13-03-113August 2013
Eyes Over Puget Sound: Surface Conditions Report – August 21, 2013 13-03-077August 2013
Gibbons Creek Fecal Coliform Post-TMDL Water Quality Monitoring Report 13-03-037August 2013
PBT Chemical Trends in Washington State Determined from Age-Dated Lake Sediment Cores, 2012 Sampling Results 13-03-036August 2013
Development of Puget Sound Benthic Indicators 13-03-035August 2013
Addendum to Quality Assurance Project Plan Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design 13-03-117July 2013
Addendum to Quality Assurance Project Plan: Clover Creek Dissolved Oxygen, Fecal Coliform, and Temperature Total Maximum Daily Load Water Quality Study Design: Riparian Canopy Hemispherical Imagery Assessment 13-03-115July 2013
Quality Assurance Project Plan: Mid-Yakima River Tributaries Temperature Study 13-03-114July 2013
Eyes Over Puget Sound: Surface Conditions Report – July 15, 2013 13-03-076July 2013
Sediment Quality in Bellingham Bay, 2010 13-03-034July 2013
Quilcene-Snow Watershed Planning Area: Prediction of Gaged Streamflows by Modeling 13-03-032July 2013
PBT Trend Monitoring: Measuring Lead in Suspended Particulate Matter from Washington State Rivers and Lakes, 2012 Results 13-03-030July 2013
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2012 Data Summary 13-03-028July 2013
San Juan County Groundwater Monitoring Report, July 2011 to June 2013 15-03-019June 2013
WRIA 1 Groundwater Data Assessment 14-03-013June 2013
Eyes Over Puget Sound: Surface Conditions Report – June 17, 2013 13-03-075June 2013
Lake Spokane Nutrient Monitoring, 2010-2011: Data Summary Report 13-03-029June 2013
Spatial Trends and Factors Affecting Mercury Bioaccumulation in Freshwater Fishes of Washington State, USA. Article in Archives of Environmental Contamination and Toxicology. 13-03-027June 2013
Sediment Quality in Central Puget Sound, Changes over a Ten-Year Period 13-03-021June 2013
Metals Concentrations in Sediments of Lakes and Wetlands in the Upper Columbia River Watershed: Lead, Zinc, Arsenic, Cadmium, Antimony, and Mercury 13-03-012June 2013
Addendum 1 to Quality Assurance Project Plan: Freshwater Fish Contaminant Monitoring Program 13-03-112May 2013
Quality Assurance Project Plan: Freshwater Fish Contaminant Monitoring Program 13-03-111May 2013
Quality Assurance Project Plan: Integrated Ambient Monitoring in Indian Creek: Phase II Study 13-03-110May 2013
Eyes Over Puget Sound: Surface Conditions Report – May 20, 2013 13-03-074May 2013
Location of Creosote-Treated Railroad Lines near Sensitive Near-Shore Aquatic Habitats in Washington State 13-03-025May 2013
Guidance for Effectiveness Monitoring of Total Maximum Daily Loads in Surface Water 13-03-024May 2013
Port Gardner East Waterway Sediment Monitoring, 2012 13-03-023May 2013
Dioxin in Surface Water Sources to Oakland Bay (Mason County) 13-03-022May 2013
POSTER: Increasing nutrients, changes in algal biomass and large Noctiluca blooms in Puget Sound: Is eutrophication fueling the microbial food web? 13-03-019May 2013
Clover Creek Dissolved Oxygen, Fecal Coliform, and Temperature: Total Maximum Daily Load (Water Quality Study Design) 13-03-109April 2013
Quality Assurance Project Plan: Phthalates and Metals in Tier 3 Children’s Products 13-03-108April 2013
Quality Assurance Project Plan: Quilcene-Snow Watershed Planning Area Assessment of Gaged Streamflows by Modeling 13-03-107April 2013
Eyes Over Puget Sound: Surface Conditions Report – April 8, 2013 13-03-073April 2013
Focus on Environmental Monitoring: Environmental sampling of rivers and streams in the Puget Sound region 13-03-018April 2013
Squalicum Creek and Soos Creek: Bioassessment Monitoring and Analysis to Support Total Maximum Daily Load (TMDL) Development 13-03-017April 2013
Eyes Over Puget Sound: Surface Conditions Report – March 25, 2013 13-03-072March 2013
Review and Synthesis of Available Information to Estimate Human Impacts to Dissolved Oxygen in Hood Canal 13-03-016March 2013
Surface-Water/Groundwater Interactions and Near-Stream Groundwater Quality, Lacamas Creek, Clark County 13-03-015March 2013
Lakewood Plaza Cleaners Groundwater Monitoring Results, June 2012: Data Summary Report 13-03-014March 2013
Salmon Creek Watershed Low Dissolved Oxygen and pH Characterization Study 13-03-013March 2013
Addendum 6 to Quality Assurance Project Plan: Washington State Surface Water Monitoring Program for Pesticides in Salmonid Habitat for Two Index Watersheds 13-03-106February 2013
Quality Assurance Project Plan: ConAgra Foods (Lamb-Weston) Pasco Hydrogeologic Review 13-03-101February 2013
Eyes Over Puget Sound: Surface Conditions Report – February 26, 2013 13-03-071February 2013
Little Squalicum Creek Estuary – Soil and Groundwater Characterization 13-03-011February 2013
Sediment Quality in the Bainbridge Basin, Changes from 1998 to 2009 13-03-010February 2013
Case Study for Applying SUSTAIN to a Small Watershed in the Puget Lowland 13-03-009February 2013
Black Lake Grocery Groundwater Confirmational Monitoring, August 2011 to May 2012 13-03-008February 2013
Evaluation of Bisphenol A (BPA) in Products Regulated by the State of Washington 13-03-005February 2013
Sediment Quality in the Whidbey Basin, Changes from 1997 to 2007 13-03-003February 2013
Surface Water Monitoring Program for Pesticide in Salmon-Bearing Streams, 2009-2011 Triennial Report. A Cooperative Study by the Washington State Departments of Ecology and Agriculture. 13-03-002February 2013
Microcystins and Other Blue-Green Algae Toxins Analyzed in Fish and Sediments from Washington Lakes 13-03-001February 2013
Quality Assurance Project Plan: Roofing Materials Assessment: Investigation of Toxic Chemicals in Roof Runoff 13-03-105January 2013
Skykomish River Temperature Total Maximum Daily Load Development: Water Quality Study Design (Quality Assurance Project Plan) 13-03-104January 2013
Quality Assurance Project Plan: Spokane River Toxics Fish Tissue and Preliminary Monitoring in Fiscal Year 2013 in Support of the Long-term Toxics Monitoring Strategy 13-03-103January 2013
Addendum to Quality Assurance Project Plan South Puget Sound Water Quality Study Phase 2: Dissolved Oxygen for Evaluation of Shellfish Harvesting near Joint Base Lewis-McChord and Chambers Creek 13-03-102January 2013
Eyes Over Puget Sound: Surface Conditions Report – January 15, 2013 13-03-070January 2013
An Assessment of the Chlorinated Pesticide Background in Washington State Freshwater Fish and Implications for 303(d) Listings 13-03-007January 2013
Middle Snake Watershed Planning Area: Prediction of Gaged Streamflows by Modeling 13-03-006January 2013
Shelton Laundry and Cleaners Groundwater Monitoring Results, November 2011 and June 2012: Data Summary Report 13-03-004January 2013