Title (link to summary) | Number | Date (released or updated) |
Quality Assurance Project Plan: Puget Sound Groundwater Toxics Loading Analysis, Direct Discharge Pathway
| 10-03-122 | December 2010 |
Streamflow Summary for Burnt Bridge Creek (Clark County), 2008
| 10-03-072 | December 2010 |
Streamflow Summary for the Palouse and South Fork Palouse Rivers and Selected Tributaries, 2006-08
| 10-03-071 | December 2010 |
Weaver Creek (Mason County) Fecal Coliform Attainment Monitoring
| 10-03-070 | December 2010 |
POSTER: Transport of Heat, Salt, Oxygen, and Freshwater within the Southernmost Extent of South Puget Sound: Year 2010 in Review
| 10-03-063 | December 2010 |
Addendum to Quality Assurance Project Plan: Des Moines, Massey, and McSorley Creeks Copper and Zinc Water Quality Assessment
| 08-03-119 Addendum 1 | December 2010 |
Puget Sound Dissolved Oxygen Modeling Study: Development of an Intermediate-Scale Hydrodynamic Model
| 14-03-022 | November 2010 |
Quality Assurance Project Plan: Skagit Bay Fecal Coliform Bacteria Loading Assessment
| 10-03-121 | November 2010 |
Quality Assurance Project Plan: Assessment for Chemical Contaminants in Northeastern Washington Area Lakes.
| 10-03-119 | November 2010 |
POSTER: Sediment transport and contaminant loading to the Lower Duwamish Superfund Site from the Green River: Application of innovative sampling technologies to verify model predictions
| 10-03-068 | November 2010 |
POSTER: South Sound Sediment Quality and Partnership Opportunities for 2011 Sediment Monitoring in South Puget Sound and Budd Inlet
| 10-03-067 | November 2010 |
POSTER: The Long-Term Fate and Bioaccumulation of Polychlorinated Biphenyls in Puget Sound
| 10-03-066 | November 2010 |
POSTER: Washington’s Swimming Beach Program: Bacterial Monitoring in Puget Sound
| 10-03-065 | November 2010 |
POSTER: Evaluating the Toxicity of Arsenic and Lead in the Tacoma Smelter Plume and Hanford Site Old Orchards Areas
| 10-03-062 | November 2010 |
Shelton Laundry and Cleaners Groundwater Monitoring Results, November 2009 and June 2010
| 10-03-060 | November 2010 |
Land-Use Effects on Export and Retention of Mercury in the Lake Ozette Watershed
| 10-03-059 | November 2010 |
Upper Chehalis River Watershed Multi-Parameter Total Maximum Daily Load: Water Quality Data Review
| 10-03-057 | November 2010 |
Quality Assurance Project Plan: Lake Spokane Nutrient Monitoring
| 10-03-120 | October 2010 |
Quality Assurance Project Plan: Mercury Screening in Lake Ozette Sockeye
| 10-03-118 | October 2010 |
Quality Assurance Project Plan: Trend Monitoring for Organic PBTs in Washington Rivers and Lakes
| 10-03-117 | October 2010 |
Measuring Mercury Trends in Freshwater Fish in Washington State, 2009 Sampling Results
| 10-03-058 | October 2010 |
Quality Management Plan, 2010: Washington State Department of Ecology
| 10-03-056 | October 2010 |
Quality Assurance Project Plan Addendum: Measuring Mercury Trends in Freshwater Fish in Washington State.
| 06-03-103Addendum1 | October 2010 |
Quality Assurance Project Plan: Hangman Hills Sewage Treatment Plant Nutrient Loading and Groundwater Study
| 10-03-116 | September 2010 |
Quality Assurance Project Plan: Analyzing Toxaphene at Water Quality Criteria Levels in Treated Lakes and Agricultural Streams
| 10-03-115 | September 2010 |
Quality Assurance Project Plan: Pilot Study of an Ambient Monitoring Approach for Evaluating the Biological Integrity of Urban Streams.
| 10-03-114 | September 2010 |
Quality Assurance Project Plan: Blue-Green Algae Toxins in Fish and Sediment from Washington Lakes: Microcystins and Saxitoxin
| 10-03-112 | September 2010 |
Quality Assurance Project Plan: Supplemental: South Fork Palouse River Basin Dissolved Oxygen and pH Total Maximum Daily Load Study
| 10-03-111 | September 2010 |
Quality Assurance Project Plan: Phase 2: High Summer Bacteria Concentrations in Streams
| 10-03-110 | September 2010 |
American Plating Post-Interim-Action Groundwater Monitoring Results: May and November, 2009
| 10-03-055 | September 2010 |
Walla Walla River Basin Fecal Coliform Bacteria, pH, and Dissolved Oxygen
Total Maximum Daily Load: Supplemental Study
| 10-03-054 | September 2010 |
Potholes Reservoir: Screening Survey for Dieldrin, Other Chlorinated Pesticides, and PCBs in Fish, Water, and Sediments
| 10-03-053 | September 2010 |
Procedure Manual for the Environmental Laboratory Accreditation Program
| 10-03-048 | September 2010 |
PCBs, Dioxins, and Furans in Fish, Sediment, and Wastewater Treatment Plant Effluent from West Medical Lake
| 10-03-038 | September 2010 |
Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design
| 10-03-113 | August 2010 |
Quality Assurance Monitoring Plan: Ambient Biological Monitoring in Rivers and Streams: Benthic Macroinvertebrates and Periphyton
| 10-03-109 | August 2010 |
Final Cost-Benefit and Least Burdensome Alternative Analysis: Chapter 173-50 WAC, Accreditation of Environmental Laboratories
| 10-03-052 | August 2010 |
Concise Explanatory Statement: Chapter 173-50 WAC, Accreditation of Environmental Laboratories. Summary of rule making and response to comments.
| 10-03-051 | August 2010 |
Rule Adoption Notice: Accreditation of Environmental Laboratories, Chapter 173-50 WAC
| 10-03-050 | August 2010 |
Rule Implementation Plan: Accreditation of Environmental Laboratories, Chapter 173-50 WAC
| 10-03-049 | August 2010 |
River and Stream Water Quality Monitoring Report, Water Year 2009
| 10-03-046 | August 2010 |
Focus on Perfluorinated Compounds: PFCs in Washington State Rivers and Lakes
| 10-03-044 | August 2010 |
Skagit-Samish Basin Intensive Surface Water Sampling for Pesticides in Salmon-Bearing Streams, 2009
| 10-03-043 | August 2010 |
Perfluorinated Compounds in Washington Rivers and Lakes
| 10-03-034 | August 2010 |
2010 Addendum to Quality Assurance Project Plan: The Puget Sound Assessment and Monitoring Program Sediment Monitoring Component.
| 09-03-121-Addendum1 | August 2010 |
Quality Assurance Project Plan: Monitoring Stream Temperatures and Habitat Characteristics for the Extensive Riparian Status and Trends Program
| 10-03-105 | July 2010 |
Lower White River Nutrients and pH Study: Data Summary Report
| 10-03-040 | July 2010 |
Addendum to 2007 Hydrologic Information Report, Water Availability Assessment for Swale Creek Subbasin
| 12-03-338 | June 2010 |
Little Klickitat Subbasin Water Level Monitoring Report, WRIA 30
| 12-03-336 | June 2010 |
Little Spokane Groundwater Elevation and Stream Flow Monitoring Project
| 12-03-330 | June 2010 |
Technical Memorandum Update on Groundwater Level Gauging Project - Lower Lake Roosevelt
| 12-03-327 | June 2010 |
Groundwater Inventory and Mapping Project Lower Lake Roosevelt Watershed
| 12-03-325 | June 2010 |
Preliminary Critical Aquifer Recharge Analysis Report Lower Lake Roosevelt Watershed
| 12-03-324 | June 2010 |
Quality Assurance Project Plan: Walla Walla Watershed Planning Area Prediction of Gaged Streamflows by Modeling
| 10-03-108 | June 2010 |
Quality Assurance Project Plan: Evaluating the Toxicity of Arsenic and Lead in the Soils of the Tacoma Smelter Plume Footprint and Hanford Site Old Orchards Areas.
| 10-03-107 | June 2010 |
Quality Assurance Project Plan: Asotin Creek Fecal Coliform Study.
| 10-03-106 | June 2010 |
PBT Trend Monitoring: Measuring Lead in Suspended Particulate Matter from Washington State Rivers and Lakes, 2009 Results
| 10-03-041 | June 2010 |
Guidance for Stressor Identification of Biologically Impaired Aquatic Resources in Washington State
| 10-03-036 | June 2010 |
Determination of PBT Chemical Trends in Selected Washington Lakes Using Age-Dated Sediment Cores, 2009 Sampling Results
| 10-03-035 | June 2010 |
State Approaches and Needs for Measuring, Tracking, and Reporting on Water Quality Improvements
| 10-03-017 | June 2010 |
Mercury Accumulation in Sediment Cores from Three Washington State Lakes: Evidence for Local Deposition from a Coal-Fired Power Plant. Journal article in the Archives of Environmental Contamination and Toxicology.
| 10-03-037 | May 2010 |
Focus on Fish Testing: Fish Testing Planned for Lake Chelan and Wenatchee River in 2010
| 10-03-033 | May 2010 |
Dungeness Bay and Dungeness River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring Report
| 10-03-032 | May 2010 |
An Assessment of Washington Lakes: National Lake Assessment Results
| 10-03-029 | April 2010 |
City of Waitsburg Wastewater Treatment Plant Groundwater Study: Evaluation of Nutrient Loading to the Touchet River
| 10-03-028 | April 2010 |
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, PAHs, and PBDEs in Washington Rivers and Lakes, 2008
| 10-03-027 | April 2010 |
South Prairie Creek Tributaries Fecal Coliform Bacteria Data Summary: Inglin Creek and Spiketon Ditch
| 10-03-026 | April 2010 |
Nooksack Watershed Planning Area (WRIA 1): Prediction of Gaged Streamflows by Modeling
| 10-03-023 | April 2010 |
Focus on Puget Sound’s Urban Bays: Sediment Quality in Commencement Bay, 1999 to 2008
| 10-03-021 | April 2010 |
Urban Waters Initiative 2008: Sediment Quality Changes in Commencement Bay Since 1999 (Summary document)
| 10-03-020 | April 2010 |
Urban Waters Initiative, 2008: Sediment Quality in Commencement Bay
| 10-03-019 | April 2010 |
Yakima River Pesticides and PCBs Total Maximum Daily Load: Volume 1. Water Quality Study Findings
| 10-03-018 | April 2010 |
Monitoring Intertidal Seepage from the Port Angeles Landfill
| 10-03-016 | April 2010 |
Quality Assurance Project Plan: Nason Creek (Chelan County) Oxbow Reconnection Monitoring
| 10-03-104 | March 2010 |
Quality Assurance Project Plan: Upper Mainstem Stillaguamish River Dissolved Oxygen Study
| 10-03-103 | March 2010 |
Quality Assurance Project Plan: Assessing the Potential for Excessive Lead and Arsenic in Construction Site Stormwater Discharges.
| 10-03-102 | March 2010 |
Preliminary Cost-Benefit and Least Burdensome Alternative Analysis, Chapter 173-50 WAC: Accreditation of Environmental Laboratories
| 10-03-025 | March 2010 |
Small Business Economic Impact Statement, Chapter 173-50 WAC: Accreditation of Environmental Laboratories
| 10-03-024 | March 2010 |
Rule Proposal Notice: Accreditation of Environmental Laboratories, Chapter 173-50 WAC
| 10-03-022 | March 2010 |
PBT Monitoring: PBDE Flame Retardants in Spokane River Fish, 2009
| 10-03-015 | March 2010 |
General Characterization of PCBs in South Lake Washington Sediments
| 10-03-014 | March 2010 |
Audubon Lake’s Connection to Upper Crab Creek (Lincoln County): Source Assessment
| 10-03-013 | March 2010 |
Blue-Green Algae Toxins in Washington Lakes: Screening Fish Tissue for Microcystins and Anatoxin-a
| 10-03-011 | March 2010 |
Appendices B- J: Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2006-2008 Triennial Report
| 10-03-008AppendicesB-J | March 2010 |
Surface Water Monitoring Program for Pesticides in Salmonid-Bearing Streams, 2006-2008 Triennial Report
| 10-03-008 | March 2010 |
Technical Memo_Lake Spokane GW Loading Analysis_DRAFT
| 12-03-335 | February 2010 |
Technical Memo_Orthophosphate Groundwater Load Analyses_DRAFT
| 12-03-331 | February 2010 |
Bertrand Fishtrap Flow Depletion Model
| 12-03-267 | February 2010 |
Grayland Ditch: An Evaluation of Organophosphate Pesticides and Pesticide Test Kits
| 10-03-012 | February 2010 |
Lakewood Plaza Cleaners Groundwater Monitoring Results, June and November 2009
| 10-03-010 | February 2010 |
Sediment Quality Assessment of Puget Sound’s Hood Canal Region, 2004
| 10-03-006 | February 2010 |
Sediment Quality Assessment of the Hood Canal Region of Puget Sound, 2004: Spatial/Temporal Sediment Monitoring Element of the Puget Sound Assessment and Monitoring Program
| 10-03-005 | February 2010 |
Addendum to Phase 2 subtask 2F: Evaluation of the recalculated loading rates with the box model of PCBs in Puget Sound
| 09-03-015-Addendum | February 2010 |
Data Update and On-Site Feasibility Report_Saltese Flats Wetland Restoration Investigation
| 12-03-329 | January 2010 |
Technical Memorandum Groundwater Time of Travel Contours_McCarteney Creek and Rattlesnake Springs
| 12-03-317 | January 2010 |
Groundwater Elevation Monitoring Report_Exempt Well Water Use Phase II_2009
| 12-03-315 | January 2010 |
Quality Assurance Project Plan: Seasonal Water Quality Study of Vancouver Lake Tributaries for PCBs, Dioxin, and Chlorinated Pesticides
| 10-03-101 | January 2010 |
Washington State Department of Ecology Quality Report to Management, November 2006 through June 2009: Quality System Structure, Activities, and Assessment
| 10-03-009 | January 2010 |
An Assessment of the PCB and Dioxin Background in Washington Freshwater Fish, with Recommendations for Prioritizing 303(d) Listings
| 10-03-007 | January 2010 |
Pharmaceuticals and Personal Care Products in Municipal Wastewater and Their Removal by Nutrient Treatment Technologies
| 10-03-004 | January 2010 |
Focus on Pharmaceuticals and Personal Care Products
| 10-03-003 | January 2010 |
Shelton Laundry and Cleaners, October 2008 and June 2009 Groundwater Monitoring Results
| 10-03-002 | January 2010 |
Union River Watershed Fecal Coliform Total Maximum Daily Load: Water Quality Effectiveness Monitoring
| 10-03-001 | January 2010 |
Quality Assurance Project Plan Addendum: South Fork Palouse River Fecal Coliform Bacteria Total Maximum Daily Load Study.
| 06-03-105-Addendum1 | January 2010 |