Facility Site ID: 2551 Cleanup Site ID: 7030

  • Site Status

  • Cleanup Started

Related Information

Current Status

Boeing Field Chevron
Boeing Field Chevron
Updated February 2020

The Feasibility Study (see below) is underway.

In 2015, Ecology entered into an Agreed Order with Potentially Liable Persons or PLPs (Chevron and the current property owner) to investigate and develop a cleanup action plan for the site.  

The Agreed Order describes the work that the PLPs agree to perform on the site. Under this legal agreement, the PLPs are required to complete the following:
  • Remedial Investigation (RI). The purpose of the RI is to define the nature and extent of contamination at the site and to determine if it is contributing to the sediment contamination in the Lower Duwamish Waterway. During the RI, the PLPs will collect data necessary to adequately characterize the contamination in soil, groundwater, stormwater, and sediments. 
  • Feasibility Study (FS). The FS will use the results of the RI to evaluate and choose measures to cleanup contamination and prevent recontamination of the sediment. 
  • Draft Cleanup Action Plan (DCAP). Ecology will identify a preferred cleanup action based on the results of the FS.

What happens next?

Ecology is working with the PLPs to complete the RI and move forward with the FS. The next opportunity for public comment will be when the Draft Final RI Report is ready for review.

Why this cleanup matters

This site is part of Ecology’s Lower Duwamish Waterway source control efforts, because it is within the Lower Duwamish Waterway (LDW) Superfund Site. The 5-mile stretch of the Duwamish River that flows north into Elliot Bay was added to the Superfund National Priorities List by the U.S. Environmental Protection Agency (EPA) in 2001.

The sediments (mud) in the river contain a wide range of contaminants due to decades of industrial activity and runoff from urban areas. EPA is leading efforts to clean up the river sediments.

Ecology is leading efforts to control sources of contamination from the surrounding land area. The long-term goal is to minimize recontamination of the river sediment and restore water quality in the river. 

The Boeing Chevron Site is one of several sites that will be cleaned up as part of Ecology’s Source Control Strategy – controlling sources of pollution to the river. Contaminants in the soil and groundwater around the river pose a risk to human health and the environment. They can also find their way into the river through storm runoff and other pathways. For more information, visit our Source Control page.

Site Information

Site location

The Site is located between Pacific Highway South and East Marginal Way, immediately south of the South Boeing Access Road. The Site is located approximately 250 feet east of the Duwamish River and approximately 1/2 mile southwest of Boeing Field. 
Final site boundaries will be defined by the extent of contamination determined during the remedial investigation.  
The Lower Duwamish Waterway drainage basin is divided into source control areas. This site is located within the Norfolk Combined Sewer Overflow/ Storm Drain Basin Early Action Area source control area along the east bank of the river at river mile 4.9.

Site history

The Boeing Field Chevron facility has operated as a gasoline station since 1940. Standard Oil and Chevron operated the Site from the late 1960s to the mid 1980s. 

The site currently includes underground storage tanks with associated pump islands and dispensers, a car wash and a mini-mart building.

Contamination

In soil and groundwater:

•Diesel and gasoline-range hydrocarbons
•Light Non-aqueous Phase Liquids (LNAPLs)
•BenzeneTolueneEthylbenzeneXylenes


Previous cleanup work

Chevron reported releases of gasoline to Ecology in 1990 and 1996 associated with the former underground storage tanks (USTs). As a result, Chevron removed eleven USTs, three pump islands, the former service station building, and about 2,500 cubic yards of petroleum contaminated soils (PCS) from the site between 1990 and 1996.

Some soil and groundwater with petroleum hydrocarbon concentrations above MTCA cleanup levels remained on the site. In 2003 Chevron reported a new release of gasoline. Some chemicals from the different releases are co-mingled.

General Cleanup Process

The Model Toxics Control Act (MTCA; Chapter 70.105D RCW is Washington’s environmental cleanup law). It provides requirements for contaminated site cleanup and sets standards that protect human health and the environment. Ecology enacts the MTCA and oversees cleanups. The MTCA site cleanup process is completed in steps (see graphic) over a variable timeline.
Legal 6
Document Title Document Date Document Type
BoeingFieldChevron Signed AO DE10947 07-13-2015 7/13/2015 Agreed Order
Boeing Field Chevron Agreed Order 2015 4/6/2015 Agreed Order
Determination of Potentially Liable Person Status RPNP Corporation 8/15/2014 Final Potentially Liable Person Status Letter
RPNP Corp Intial PLP Letter 07-08-2014 7/8/2014 Early Notice Letter
Sandhu Determination of PLP Status Modification 7/8/2014 Early Notice Letter
Chevron Signatory for Agreed Order 6/16/2014 Agreed Order
Public Information 3
Document Title Document Date Document Type
Boeing Field Chevron Public Comment Summary 7/6/2015 Responsiveness Summary
Boeing Field Chevron Public Participation Plan 2015 4/6/2015 Public Participation Plan
Boeing Field Chevron Fact Sheet 2015 4/6/2015 Fact Sheet\Public Notices
Technical Reports 98
Document Title Document Date Document Type
Final Pilot Study Report 08-13-2024 8/13/2024 Feasibility Study
Ecology Analysis Pilot Test GW Field and Lab Data 8/6/2024 Feasibility Study
Ecology Comments to the Pilot Test Report BFC 8/6/2024 Feasibility Study
final Groundwater Monitoring and Sampling Work Plan 12-06-2023 12/6/2023 Groundwater Monitoring Report
Boeing Field Chevron Third Quarter 2022 Progress Report 09-15-2022 9/15/2022 Progress Report
UIC Well Registration 36723 - Boeing Field Chevron AO_DE10947 08-22-2022 8/22/2022 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron Memorandum Addendum to the Pilot Study Workplan 07-28-2022 7/28/2022 Site Specific Technical Document - other
Chevron Boeing Field Pilot Study Workplan 06-21-2022 6/21/2022 Site Specific Technical Document - other
Boeing Field Chevron Second Quarter 2022 Status Report 0615-2022 6/15/2022 Progress Report
Boeing Field Chevron RI Final 10-07-2020 10/7/2020 Remedial Investigation Report
Boeing Field Chevron RI Final 10-07-2020 Part 2 10/7/2020 Remedial Investigation Report
Boeing Field Chevron RI Final 10-07-2020 Part 1 10/7/2020 Remedial Investigation Report
Boeing Field Chevron July 2020 Progress Memo 08-17-2020 8/17/2020 Progress Report
Boeing Field Chevron June 2020 Progress Memo 07-15-2020 7/15/2020 Progress Report
Boeing Field Chevron May 2020 Progress Memo 06-15-2020 6/15/2020 Progress Report
Boeing Field Chevron Historical Aerial Photos 6/2/2020 Remedial Investigation Report
Boeing Field Chevron April 2020 Progress Memo 05-19-2020 5/19/2020 Progress Report
Boeing Field Chevron Extension Request 04-22-2020 4/22/2020 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron March 2020 Progress Memo 04-15-2020 4/15/2020 Progress Report
Boeing Field Chevron February 2020 Progress Report 03-17-2020 3/17/2020 Progress Report
Boeing Field Chevron Meeting 03-02-2020 G-Logics Figs&Tables 3/2/2020 Site Specific Technical Document - other
Boeing Field Chevron Meeting 03-02-2020 Ecology MtgNotes&Agenda 3/2/2020 Site Specific Technical Document - other
Boeing Field Progress Report December 2019 01-15-2020 1/15/2020 Progress Report
Boeing Field Chevron Nov 2019 Progress Memo 12-20-2019 12/20/2019 Progress Report
Boeing Field Chevron Ecology Comments on Proposed Cleanup Action Alternatives 11-12-2019 11/12/2019 Feasibility Study
Boeing Field Chevron Proposed Cleanup Action Alternatives 10-17-2019 10/17/2019 Feasibility Study
Chevron Boeing Field Sept 2019 Progress Memo 10-08-2019 10/8/2019 Progress Report
Chevron Boeing Field ChevronProject Coordinator Change 09182019 9/18/2019 Site Specific Administrative Document - other (Administrative correspondence)
Chevron Boeing Field August 2019 Progress Memo 9/13/2019 Progress Report
Chevron Boeing Field July 2019 Progress Memo 08-16-2019 8/16/2019 Progress Report
Boeing Field Chevron Final Feasibility Study Test Report 08-14-2019 8/14/2019 Feasibility Study
Chevron Boeing Field May 2019 Progress Memo 07-17-2019 7/17/2019 Progress Report
Chevron Boeing Field June 19, 2019 Progress Memo 6/19/2019 Progress Report
Boeing Field Chevron Pilot Study Field Oversight Memo 05-23-2019 5/23/2019 Site Specific Technical Document - other
05-16-2019 Progress Report (04-01-2019 thru 04-30-2019) 5/16/2019 Progress Report
04-15-2019 Progress Report (03-01 thru 03-31 2019) 4/15/2019 Progress Report
Boeing Field Chevron Boring Logs 04-11-2019 4/11/2019 Site Specific Technical Document - other
Boeing Field Pilot Field Schedule 4/11/2019 Site Specific Technical Document - other
03-19-2019 Progress Report 3/19/2019 Progress Report
02-19-2019 Progress Report 2/19/2019 Progress Report
Feasibility Study Pilot Test Workplan 02-04-2019 2/4/2019 Feasibility Study
Final Tech Memo Comments Glogics Pilot Study Workplan 01-31-2019 1/31/2019 Site Specific Technical Document - other
10-15-2018 Progress Report 10/15/2018 Progress Report
Chevron Change of Contact Notice 09-10-2018 9/10/2018 Site Specific Administrative Document - other (Administrative correspondence)
08-14-2018 Progress Report 8/14/2018 Progress Report
07-09-2018 Progress Report 7/9/2018 Progress Report
Chevron Boeing Field Extension 06-25-2018 6/25/2018 Site Specific Administrative Document - other (Administrative correspondence)
06-18-2018 Progress Report 6/18/2018 Progress Report
05-18-2018 Progress Report 5/18/2018 Progress Report
Progress Report 04-16-2018 4/16/2018 Progress Report
Progress Report 03-15-2018 3/15/2018 Progress Report
Progress Report 01-01-2018 thru 01-31-2018 2/15/2018 Progress Report
Boeing Field Chevron Progress Report Nov 2017 to Jan 2018 1/16/2018 Progress Report
Boeing Field Chevron Notice of Change of Project Manager g-logics 1-15-2018 1/15/2018 Site Specific Administrative Document - other (Administrative correspondence)
Progress Report, October 15, 2017 to November 15, 2017 11/15/2017 Progress Report
Project Lead Personnel Change Notification 10-16-2017 10/16/2017 Site Specific Administrative Document - other (Administrative correspondence)
Progress Report, September 15, 2017 to October 15, 2017 10-15-2017 10/15/2017 Progress Report
Progress Report, August 15, 2017 to September15, 2017 09-18-2017 9/18/2017 Progress Report
08-14-2017 Progress Report 8/14/2017 Progress Report
05-15-2017 Progress Report 5/15/2017 Progress Report
Progress Report 03-15-2017 3/15/2017 Progress Report
Boeing Field Chevron Data Validation Report 02-16-2017 2/16/2017 Site Specific Technical Document - other
Progress Report 02-15-2017 2/15/2017 Progress Report
Chevron Boeing Field Progress Report 12-15-2016 12/15/2016 Progress Report
Boeing Field Chevron Scanned Purge Logs 11-29-2016 11/29/2016 Site Specific Technical Document - other
Boeing Field Chevron Notification 30-day Extension 11/21/2016 Site Specific Administrative Document - other (Administrative correspondence)
Progress Report 11-15-2016 11/15/2016 Progress Report
Boeing Field Chevron Meeting Notes November 9 2016 11/9/2016 Site Specific Technical Document - other
Boeing Field Chevron Request for Field Work Extension 11-01-2016 11/1/2016 Site Specific Administrative Document - other (Administrative correspondence)
Progress Report 10-14-2016 10/14/2016 Progress Report
Boeing Field Chevron Meeting Notes from 03 October 2016 10/3/2016 Site Specific Technical Document - other
Progress Report 09-23-2016 9/23/2016 Progress Report
Progress Report 09-21-2016 9/21/2016 Progress Report
Sandhu Notification of Change of Project Manager 09-21-2016 9/21/2016 Site Specific Administrative Document - other (Administrative correspondence)
Notice of Change of Project Manager 9/21/2016 Site Specific Administrative Document - other (Administrative correspondence)
Progress Report 07-19-2016 7/19/2016 Progress Report
Progress Report 05-25-2016 5/25/2016 Progress Report
Boeing Field Chevron Remedial Investigation Work Plan 5/24/2016 Remedial Investigation Work Plan
Progress Report 04-22-2016 4/22/2016 Progress Report
Progress Report 01-15-2016 1/15/2016 Progress Report
Progress Report 12-11-2015 12/11/2015 Progress Report
Progress Report 10-15-2015 10/15/2015 Progress Report
Progress Report 9-17-15 9/17/2015 Progress Report
Work Plan for GW Monitoring Well Assessment 6-29-15 6/29/2015 Site Specific Technical Document - other
Boeing Field Chevron - Site Hazard Assessment 7/17/2014 Site Hazard Assessment Report
Agreement to ammend PLP Determination letter 7/2/2014 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron - SHA Notification Letters (to all) 1/7/2014 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron response 3/1/2013 3/1/2013 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron Response to Potential Liabililty 3/1/2013 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron Response to Notice of PLP Status 2/7/2013 Site Specific Technical Document - other
Boeing Field Chevron, Rajbir Sandhu c/o Kurt Peterson Determination of PLP Status 1/15/2013 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron Determination of PLP Status 1/15/2013 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron's Responce to Notice of Potential Liability 10/31/2012 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron Response of Rajbir Sandhu re: Notice of PLP Liability 10/22/2012 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron Notice of PLP Liability for Chevron 9/27/2012 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron Notice of PLP Liability for Rajbir Sandhu 9/27/2012 Site Specific Administrative Document - other (Administrative correspondence)
Current and Heritage Chevron LUST sites in Northwest Washington 11/9/2009 Site Specific Administrative Document - other (Administrative correspondence)
Boeing Field Chevron, Chevron Environmental Agreement 8/2/1991 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.

Contaminants 5

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Non-Halogenated Organics - Non-Halogenated Solvents C
Non-Halogenated Organics - Benzene C C
Non-Halogenated Organics - Petroleum-Diesel C C
Non-Halogenated Organics - Petroleum-Gasoline C C
Non-Halogenated Organics - Petroleum-Other C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.