Facility Site ID: 19135499 Cleanup Site ID: 11690

  • Site Status

  • Cleanup Started

Site Status - June 2020

Troy Laundry Cleanup Site
Troy Laundry Cleanup Site
The Department of Ecology (Ecology) and Ponte Gadea have entered into a legal agreement called a Prospective Purchaser Consent Decree (PPCD) prior to the sale of a downtown Seattle property. The property is located at 300 Boren Avenue North and 399 Fairview Avenue North (previously listed as 307 Fairview Avenue North). 


The PPCD requires the operators to:

    * Monitor groundwater beneath the property;
    * Monitor groundwater beneath the adjacent rights-of-way located north (Harrison Street), west (Boren Avenue North), and south (Thomas Street) of the property;
    * Perform additional groundwater treatment if deemed necessary.

The Public Participation Plan details how people can be involved in the progress of this cleanup site.

View these documents by following the links below, or go to the "View Documents" link.

Email List

Join our email list to receive updates about the South Lake Union cleanup sites, including Troy Laundry Seattle. You may also email the Public Involvement Coordinator (listed under Contacts) to be added to the list. Unsubscribe at any time.

Subscribe Here!

Site Background

The Troy Laundry Property is a recently redeveloped city block in South Lake Union that is part of the Troy Laundry Seattle cleanup site (Site). It operated as an industrial laundry and dry cleaning facility from 1926 until 1985. Touchstone, the current owner of the Property, performed cleanup activities in coordination with redevelopment and is now proposing to sell the Property to Ponte Gadea Seattle, LLC (Ponte Gadea).

Contamination
Hazardous dry cleaning solvents, heating oil, and gasoline products were used and stored in 19 above- and under-ground tanks located on the Property.  Dry cleaning solvents and petroleum were released on the Property, resulting in soil and groundwater contamination. Contaminants found included:
 
·         Tetrachloroethene (PCE) and its degradation compounds trichloroethene (TCE), cis-1,2-dichloroethene (DCE), and vinyl chloride (VC).
·         Gasoline, diesel, and oil-range petroleum hydrocarbons.

Agreed Order and Interim Action
2012:  Ecology enters into an Agreed Order with Touchstone, the current owner of the Property. The Order requires Touchstone to:
    * Complete an investigation (RI/FS) of the site;
    * Prepare a draft cleanup plan (DCAP) for the site.

2013:  Ecology and Touchstone amend the Agreed Order, providing for:
    * An interim cleanup action (Interim Action) to be performed in coordination with property redevelopment;

2014: Touchstone conducts Interim Action work:
    * Excavates and disposes of 100,000+ tons of contaminated soil;
    * Installs groundwater treatment system to address contamination remaining in groundwater beneath and adjacent to the property. The treatment system injects edible oil into groundwater in order to degrade dry cleaning solvents and petroleum into byproducts that do not pose a threat to human health and the environment.

2015:  Interim Action work completed:
    * Construction of two new commercial buildings on property
    * Touchstone begins evaluating indoor air quality (vapor intrusion) in new buildings to ensure that residual groundwater contamination is not creating health risks.

Additional Agreed Order & PPCD Work
The cleanup that Touchstone performed on the Property as an interim action is not necessarily the final cleanup remedy for the Site. Upon entry of the PPCD, Touchstone will remain obligated under the Agreed Order to investigate the full nature and extent of contamination at the Site and evaluate site-wide cleanup options.
While Touchstone will complete the work required under the Agreed Order for the entire Site, the PPCD will require Ponte Gadea to perform monitoring of groundwater beneath the Property and beneath the adjacent rights-of-way located north of the Property (Harrison Street), west of the Property (Boren Avenue North), and south of the Property (Thomas Street), and to perform additional groundwater treatment on the Property if necessary. In addition, the sale of the Property will result in significant new funds being set aside for site-wide investigation and cleanup.

Community Profile


The Environmental Protection Agency (EPA) has developed a new environmental justice (EJ) mapping and screening tool called EJSCREEN. It is based on nationally consistent data and an approach that combines environmental and demographic indicators in maps and reports. See below for information about demographics in the area of the Troy Touchstone in South Lake Union, Seattle.

EJSCREEN Census Block Map - This shows the Census Blocks used to generate the reports below.

EJSCREEN ACS Summary Report Troy Touchstone – This shows the demographic information about the population of the area.

EJScreen Report Troy Touchstone – This report shows the values for environmental and demographic indicators and EJSCREEN indexes. These percentiles provide perspective on how the selected block group or buffer area compares to the entire state, EPA region, or nation.
 
You can also check out What’s in My Neighborhood to find out about other cleanups in your area. 

Legal 11
Document Title Document Date Document Type
Final PLP letter for Seattle Times 12/19/2019 Early Notice Letter
Early Notice Letter to Onni 12/18/2019 Early Notice Letter
3rd Agreed Order Amendment 4/25/2019 Agreed Order Amendment
prospective purchaser consent decree 3/19/2019 Administrative Order on Consent
Final PLP notice letter LeatherCare 10/4/2018 Early Notice Letter
Early Notice ahd Preliminary PLP letter LeatherCare 8/13/2018 Early Notice Letter
Early Notice and Preliminary PLP letter 6/11/2018 Early Notice Letter
Troy Laundry Seattle Agreed Order Amendment #2 3/13/2015 Agreed Order Amendment
Troy Laundry Seattle Agreed Order Amendment #1 8/28/2013 Agreed Order Amendment
Troy Laundry Seattle Signed Agreed Order 5/22/2012 Agreed Order
Troy Laundry Seattle - Early Notice Letter 10/18/2011 Early Notice Letter
Public Information 12
Document Title Document Date Document Type
Troy Laundry - Public Participation Plan - February 2019 2/1/2019 Public Participation Plan
Troy Laundry - PPCD Fact Sheet - January 2019 1/31/2019 Fact Sheet\Public Notices
EJSCREEN Report Troy Touchstone 1/4/2017 Fact Sheet\Public Notices
EJSCREEN ACS Summary Report Troy Touchstone 1/4/2017 Fact Sheet\Public Notices
EJSCREEN Census Block Map Troy Laundry 1/4/2017 Fact Sheet\Public Notices
Interim Action Cleanup to Begin at Troy Laundry 3/6/2014 Fact Sheet\Public Notices
Troy Laundry Seattle Responsiveness Summary & Agreed Order Amendment signed by Ecology letter 8/29/2013 Responsiveness Summary
Troy Laundry Interim Action Plan Responsiveness Summary 8/26/2013 Responsiveness Summary
Troy Laundry - Public Participation Plan (May 2013) 5/10/2013 Public Participation Plan
Troy Laundry - Amended Agreed Order and SEPA Determination Fact Sheet (May 2013) 5/10/2013 Fact Sheet\Public Notices
Troy Laundry Seattle - Public Participation Plan (April 2012) 4/6/2012 Public Participation Plan
Troy Laundry Seattle - Fact Sheet (April 2012) 4/6/2012 Fact Sheet\Public Notices
State Environmental Policy Act 2
Document Title Document Date Document Type
Troy Laundry - SEPA DNS (May 2013) 5/8/2013 SEPA Documents
Troy Laundry- SEPA Checklist (May 2013) 5/8/2013 SEPA Documents
Technical Reports 67
Document Title Document Date Document Type
Troy Laundry-Add'l Comments_09_23_2024 9/23/2024 Remedial Investigation / Feasibility Study
PPCD_2nd Quarter 2024 GWS_ProgressRpt 8/6/2024 Progress Report
2023 annual groundwater monitoring report 5/24/2024 Groundwater Monitoring Report
May 2024_ResponsetoEcology 5/4/2024 Remedial Investigation / Feasibility Study
Troy Laundry MW29R GW Results 2023 12/4/2023 Feasibility Study
TroyLaundry_FS_Comments Onni 12/4/2023 Feasibility Study
PPCD_2nd Quarter 2023 GWS_ProgressRpt 8/8/2023 Progress Report
TroyLaundry_ReplacementWells at SeattleTimes 4/10/2023 Remedial Investigation / Feasibility Study
PPCD Fourth Quarter 2022 Progress Report 2/21/2023 Progress Report
2022_ GW Annual Monitoring Report 2/21/2023 Performance/Confirmational Monitoring Plan or Report
PPCD Second Quarter 2022 Progress Report 8/24/2022 Performance/Confirmational Monitoring Plan or Report
2021_ GW Annual Monitoring Report 3/15/2022 Performance/Confirmational Monitoring Plan or Report
draft Feasibility Study report 1/24/2022 Feasibility Study
Troy Laundry PPCD_GW_ProgressRpt_Q2 2021 8/2/2021 Progress Report
2020_Annual GW Monitoring Report_Revised 4/29/2021 Performance/Confirmational Monitoring Plan or Report
Ecology's comments on the 2020 Groundwater Report 3/23/2021 Site Specific Technical Document - other
Pilot Work Area Message 3/21/2021 Site Specific Technical Document - other
Pilot Work Area 3/21/2021 Site Specific Technical Document - other
2020 Groundwater Monitoring Report Figures 3/3/2021 Groundwater Monitoring Report
2020 Groundwater Monitoring Report Attachment B 3/3/2021 Groundwater Monitoring Report
2020 Groundwater Monitoring Report Attachment B revised 3/3/2021 Groundwater Monitoring Report
2020 Groundwater Monitoring Report 3/3/2021 Groundwater Monitoring Report
PPCD Third Quarter 2020 Progress Report 12/10/2020 Progress Report
Final RI report 12/7/2020 Remedial Investigation Report
2019 Grounwater Monitoring Report 4/1/2020 Performance/Confirmational Monitoring Plan or Report
PPCD Fourth Quarter 2019 Progress Report 1/3/2020 Performance/Confirmational Monitoring Plan or Report
RI New Well Locations 2019 11/5/2019 Remedial Investigation / Feasibility Study
RI New Wells MW28 to MW33 Groundwater Results 2019 11/5/2019 Remedial Investigation / Feasibility Study
RI New Wells MW29 to MW33 Soil Results 2019 11/5/2019 Remedial Investigation / Feasibility Study
PPCD Third Quarter 2019 Progress Report 9/30/2019 Progress Report
vapor pathway assessment 7/8/2019 Site Specific Administrative Document - other (Administrative correspondence)
PPCD Second Quarter 2019 Progress Report 6/28/2019 Performance/Confirmational Monitoring Plan or Report
SUPPLEMENTAL VAPOR INTRUSION ASSESSMENT REPORT 5/21/2019 Performance/Confirmational Monitoring Plan or Report
Supplemental Remedial Investigation Work Plan 3/20/2019 Remedial Investigation Work Plan
supplemental Vapor Intrusion Assessment Work Plan 2/12/2019 Remedial Investigation Work Plan
Ecology letter on Vapor Intrusion 7/30/2018 Site Specific Technical Document - other
vapor intrusion report 6/28/2018 Site Specific Technical Document - other
site wide investigation letter 4/30/2018 Remedial Investigation / Feasibility Study
VAPOR INTRUSION ASSESSMENT WORK PLAN 1/25/2018 Remedial Investigation Work Plan
South Lake Union, Seattle, WA - Cleanup Site Summary - June 2017 6/30/2017 Site Specific Technical Document - other
Interim Action Progress Report, Petroleum-Contaminated Soil Disposal Tracking (Appendix F, Part 2) 1/22/2016 Interim Action Documents
Interim Action Progress Report, Contained-Out Disposal Tracking (Appendix F, Part 1) 1/22/2016 Interim Action Documents
Interim Action Progress Report, Extensions and Addendums (Appendix E, Part 2) 1/22/2016 Interim Action Documents
Interim Action Progress Report, Contained- out Approvals (Appendix E, Part 1) 1/22/2016 Interim Action Documents
Interim Action Progress Report, Tables (Report Tables) 1/22/2016 Interim Action Documents
Interim Action Progress Report, Appendix G Construction Dewatering 1/22/2016 Interim Action Documents
Interim Action Progress Report, Appendix D Lab. Analytical Reports 1/22/2016 Interim Action Documents
Interim Action Progress Report, Appendix C UST Decommissioning Documents 1/22/2016 Interim Action Documents
Interim Action Progress Report, Appendix B Well/Boring Logs 1/22/2016 Interim Action Documents
Interim Action Progress Report, Appendix A Permits 1/22/2016 Interim Action Documents
Interim Action Progress Report, Figures 1/22/2016 Interim Action Documents
Interim Action Progress Report, Text 1/22/2016 Interim Action Documents
Engineering Design Report Approval 3/4/2014 Interim Action Documents
Engineering Design Report 2/13/2014 Engineering Design Report
GROUNDWATER MONITORING REPORT Third Quarter 2013 10/13/2013 Groundwater Monitoring Report
Interim Action Plan Troy Laundry Property 8/21/2013 Interim Action Documents
Troy Laundry - Draft Interim Action Plan (Jan 2013) 1/30/2013 Interim Action Documents
Troy Laundry Seattle - Draft Feasibility Study Report (August 9, 2012) 8/9/2012 Feasibility Study
Troy Laundry Seattle submittal cover letter 5/8/2012 Site Specific Administrative Document - other (Administrative correspondence)
Troy Laundry Seattle ATRANS Conceptual Model 5/2/2012 Site Specific Technical Document - other
Troy Laundry Seattle ATRANS Manual Main Conceptual Model 5/2/2012 Site Specific Technical Document - other
Troy Laundry Seattle ATRANS Manual Appendix B 5/2/2012 Site Specific Technical Document - other
Troy Laundry Seattle ATRANS Manual Appendix A 5/2/2012 Site Specific Technical Document - other
Troy Laundry Property Draft Remedial Investigation Report 5/2/2012 Remedial Investigation Report
Troy Laundry Seattle Site Specific Health & Safety Plan 9/23/2011 Health and Safety Plan
Troy Laundry Seattle Remedial Investigation Sampling & Analysis Plan 9/23/2011 Sampling and Analysis Plan
Troy Laundry Seattle - Initial Investigation Field Report 3/4/2011 Initial Investigation Report
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.
  • Seattle Public Library - Central
    1000 Fourth Ave
    Seattle, 98104
    This location may only have print documents available during open comment periods.

Contaminants 5

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Halogenated Solvents S
Halogenated Organics - Other Halogenated Organics C C
Non-Halogenated Organics - Petroleum-Diesel C C
Non-Halogenated Organics - Petroleum-Gasoline C C
Non-Halogenated Organics - Petroleum-Other C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.