Jeld Wen - Email and maps from Floyd Snider re Street Sweeping
|
9/17/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Current Project Status
|
9/3/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Creosote Area 90 Percent Design Sheets
|
6/22/2026 |
Construction Plans and Specifications |
|
Jeld Wen - Woodlife Area 90 Percent Design Sheets
|
6/22/2026 |
Construction Plans and Specifications |
|
Jeld Wen - Ecology Feedback on Cap Condition Survey Memorandum
|
6/16/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Cap Condition Survey Memorandum - Corrected Upload
|
6/16/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Stormwater Pollution Prevention Plan (SWPPP)
|
5/15/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Clarification re Ecology Approval of Uplands EDRs and 60% Design
|
5/6/2026 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Ecology Notification of the Need for a Habitat Mitigation and Monitoring Plan
|
5/4/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Draft Marine EDR, Revision 1
|
5/1/2026 |
Engineering Design Report |
|
Jeld Wen - Catch Basins Solids Sampling Summary
|
4/30/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from ECY TCP to ECY SEA re Site Cleanup Status
|
4/27/2026 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Ecology Approval of Woodlife and Creosote Area EDRs
|
4/13/2026 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Final Engineering Design Report (EDR) and 60% Design, Woodlife Area
|
3/31/2026 |
Engineering Design Report |
|
Jeld Wen - Final Engineering Design Report (EDR) and 60% Design, Creosote Area
|
3/31/2026 |
Engineering Design Report |
|
Jeld Wen - Draft Marine Engineering Design Report, Revision 1 - w Track Change Edits
|
3/20/2026 |
Engineering Design Report |
|
Jeld Wen - Draft Marine Engineering Design Report, Revision 1, Attachments (60% Design)
|
3/20/2026 |
Engineering Design Report |
|
Jeld Wen - Anchor Response to Ecology's Comments on Draft Marine EDR dated November 21, 2025
|
3/20/2026 |
Engineering Design Report |
|
Jeld Wen - Draft Operations, Maintenance, and Monitoring Plan (OMMP)
|
3/12/2026 |
Monitoring Plan |
|
Jeld Wen - Draft Construction Quality Assurance Plan (CQAP)
|
3/12/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter re Stormwater Management Recommendations
|
1/29/2026 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Revised Draft Uplands EDRs
|
11/24/2025 |
Engineering Design Report |
|
Jeld Wen - Ecology Comments on Revised Draft Marine EDR dated October 27, 2025
|
11/21/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology re Clarifications on Cleanup Action Plan
|
11/4/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter re Soil to Groundwater to Surface Water Pathway
|
10/30/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - re Response to Ecology Questions on Demolition
|
10/28/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Revised Draft Marine Engineering Design Report (EDR)
|
10/27/2025 |
Engineering Design Report |
|
Jeld Wen - Responses to Ecology Comments on Draft Marine EDR
|
10/27/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology re Demolition Work
|
10/22/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - CSID 4402 - 2025-09-29 SHARP
|
9/29/2025 |
Site Hazard Assessment and Ranking Process Report |
|
Jeld Wen - Ecology Comments on Marine EDR
|
9/10/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology requesting Regulatory Stakeholder and Tribal Meeting
|
8/26/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Uplands EDRs
|
8/25/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Comments from Tulalip Tribe re Draft Marine EDR
|
8/22/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology re Work Plan for Stormwater System Cleanout
|
7/28/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Draft EDR - Woodlife Area
|
7/21/2025 |
Engineering Design Report |
|
Jeld Wen - Draft EDR - Creosote Area
|
7/21/2025 |
Engineering Design Report |
|
Jeld Wen - Updated Work Plan for Stormwater System Cleanout
|
7/18/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Technical Memorandum re Updated Conceptual Site Model - Uplands Soils/Site Definition
|
7/17/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Draft Marine EDR
|
7/3/2025 |
Engineering Design Report |
|
Jeld Wen - Initial Ecology Feedback on Draft Marine EDR (re Armoring)
|
6/30/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology re Creosote Area Excavation Depth DCA
|
6/25/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Supplemental Disproportionate Cost Analysis (DCA) - Creosote Area Excavation Depth
|
6/20/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Draft Marine EDR
|
6/20/2025 |
Engineering Design Report |
|
Jeld Wen - Letter from Ecology re Site Boundary Definition
|
6/12/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re W&W Investments Properties
|
6/12/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Heidelberg Properties
|
6/12/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Pre-Remedial Design Investigation (PRDI) Report - Marine Areas wo Appendices
|
6/6/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Pre-Remedial Design Investigation (PRDI) Report - Marine Areas - Supplemental Figures
|
6/6/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Pre-Remedial Design Investigation (PRDI) Report - Uplands wo Lab Data
|
5/30/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Pre-Remedial Design Investigation (PRDI) Report - Uplands Lab Data
|
5/30/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Data Submittal - DFs in Shallow Soil Samples
|
5/30/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Draft Marine PRDI Report
|
5/8/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Draft Uplands PRDI Report
|
5/2/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Feedback on Cleanout of Central Area Stormwater Lines
|
5/2/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Draft Pre-Remedial Design Investigation Data Report - Upland Areas
|
4/15/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PRDI Appendix A - Bathymetric Survey
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PRDI Appendix B - Marine Mammal Monitoring Report
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PRDI Appendix D - Photographic Log
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PRDI Appendix E - Field Documentation
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PRDI Appendix G - Data Validation Report
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Marine PDRI Appendix H&I - Geotech Boring Logs & Geotech Lab Report
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Draft Pre-Remedial Design Investigation Data Report - Marine Areas - wo Appendices
|
4/10/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Soil Sampling Request
|
3/11/2025 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Schedule Update
|
1/21/2025 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Work Plan for Remediation of Stormwater Facilities and Components
|
11/21/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Stormwater
|
10/1/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Wood Waste Characterization
|
9/19/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Memo from Anchor QEA re Archaeological Considerations
|
6/4/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from DAHP re Cultural Resources Consultation
|
5/8/2024 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Ecology Memo re Cultural Resources Consultation
|
5/7/2024 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - 2023 Groundwater Monitoring Report (Revised)
|
4/26/2024 |
Monitoring Report |
|
Jeld Wen - Approval of PRDI Step 2 Work Plans April 2024
|
4/25/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Step 2 Pre-Remedial Design Investigation (PRDI) Work Plan - Marine Areas
|
4/19/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Incidental Discovery Plan (IDP) - Marine Areas
|
4/19/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Final Step 2 Pre-Remedial Design Investigation (PRDI) Work Plan - Uplands
|
4/3/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Incidental Discovery Plan (IDP) - Uplands
|
4/3/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Feedback on Draft Final PRDI Step 2 Uplands Work Plan
|
3/28/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Feedback on Draft Final PRDI Step 2 Uplands WP - w Attachments
|
3/28/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Responses to Ecology Comments on PDRI Step 2 Uplands Work Plan
|
3/8/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Transmittal of ECY comments - Step 2 Marine Work Plan
|
3/4/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - ECY Comments on Step 2 Marine Work Plan
|
3/4/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Transmittal of ECY Initial Comments - Step 2 Marine Work Plan
|
2/26/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Initial Comments on Step 2 Marine Work Plan
|
2/26/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter from Ecology re Deferral of Step 2 BIO Testing
|
2/23/2024 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Ecology Revised Comments on Step 2 Uplands Work Plan
|
2/21/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Ecology Comments on Draft Step 2 Uplands Work Plan
|
2/14/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter to U.S. ACE re Permitting Schedule
|
2/7/2024 |
Site Specific Administrative Document - Other (Administrative Correspondence) |
|
Jeld Wen - Draft PRDI Step 2 Uplands Work Plan
|
1/24/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Draft PRDI Step 2 Marine Work Plan
|
1/24/2024 |
Site Specific Technical Document - Other |
|
Jeld Wen - Letter re Ecology Expectations for Wood Waste Characterization
|
12/1/2023 |
Site Specific Technical Document - Other |
|
Jeld Wen Site PDI Round 1 Sampling Plan
|
9/7/2023 |
Sampling and Analysis Plan |
|
Jeld Wen - Final Cleanup Action Plan August 2023
|
8/10/2023 |
Cleanup Action Plan |
|
Jeld Wen - DCAP
|
6/15/2023 |
Cleanup Action Plan |
|
Jeld Wen - Final RI/FS: December 2021 - (Text and Figures - No Appendices)
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendix J part 1
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendix J part 2
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendix J part 3
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendix P part 1
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendix P part 2
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendices A to I
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Final RI/FS: December 2021 - Appendices K to O and Q
|
12/17/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - (Text and Figures - No Appendices)
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendices A-D, F-I, K-O
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix E
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix J 1st Part
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix J 2nd Part
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix J 3rd Part
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix P 1st Part
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - Draft Final RI/FS: March 2021 - Appendix P 2nd Part
|
3/31/2021 |
Remedial Investigation / Feasibility Study Report |
|
Jeld Wen - 2nd Addendum to Source Control Evaluation Work Plan -August 2019
|
9/3/2019 |
Remedial Investigation Work Plan |
|
Jeld Wen - Summary Report ‐ 2019 Data Gap Assessment
|
7/9/2019 |
Remedial Investigation Report |
|
Jeld Wen - Addendum to Source Control Evaluation Work Plan
|
4/3/2019 |
Remedial Investigation Work Plan |
|
Jeld Wen - Summary of Source Control Evaluation & Data Gaps
|
1/1/2019 |
Remedial Investigation Report |
|
Jeld Wen - Source Control (SCE) Work Plan Final
|
11/1/2017 |
Remedial Investigation Work Plan |
|
Jeld Wen - Amendment to Phase II Work Plan
|
6/17/2015 |
Remedial Investigation Work Plan |
|
Jeld Wen - Sediment Quality Assurance Project Plan - Third Addendum March 2014
|
3/5/2014 |
Remedial Investigation Work Plan |
|
Jeld Wen - Data Gap Assessment
|
2/25/2014 |
Remedial Investigation Report |
|
Jeld Wen - Second Amendment to Phase II Remedial Investigation Work Plan - Knoll Area November 2013
|
11/22/2013 |
Remedial Investigation Work Plan |
|
Jeld Wen - Former Woodlife Area Upland Assessment
|
7/7/2013 |
Remedial Investigation Report |
|
Jeld Wen - Sediment Quality Assurance Project Plan Addendum
|
4/20/2013 |
Remedial Investigation Work Plan |
|
Jeld Wen - Amendment to Phase II Remedial Investigation Work Plan - Upland Assessment
|
2/20/2013 |
Remedial Investigation Work Plan |
|
Jeld Wen - Draft Quality Assurance Project Plan Addendum February 2013
|
2/14/2013 |
Remedial Investigation Work Plan |
|
Jeld Wen - Draft Phase II Remedial Investigation Upland Soil and Groundwater Summary Report August 2012
|
8/24/2012 |
Remedial Investigation Report |
|
Jeld Wen - Phase II Remedial Investigation Work Plan
|
8/20/2011 |
Remedial Investigation Work Plan |
|
Jeld Wen Inc - Phase 2 RI Work Plan, Addendum to Final Work Plan for RI/FS and Draft Cleanup Action Plan, August 2011
|
8/9/2011 |
Remedial Investigation Work Plan |
|
Jeld Wen Inc - Appendix A, Phase 2 RI Uplands Sampling and Analysis Plan, August 2011
|
8/9/2011 |
Sampling and Analysis Plan |
|
Jeld Wen Inc - Phase 2 RI Work Plan Addendum to Final Work Plan for RI/FS and Draft Cleanup Action Plan, 2nd Draft, May 2011
|
5/17/2011 |
Remedial Investigation Work Plan |
|
Jeld Wen - Initial Investigation Report LUST 2092
|
5/3/2011 |
State Initial Investigation Report |
|
Jeld Wen Inc - Addendum to Final Work Plan for RI/FS and Draft Cleanup Action Plan, Draft, January 2011
|
1/24/2011 |
Remedial Investigation Work Plan |
|
Jeld Wen - Final Initial Remedial Investigation Data Summary Report November 2009
|
11/22/2009 |
Remedial Investigation Report |
|
Jeld Wen Inc - Initial Remedial Investigation Data Summary, Final, November 2009
|
11/20/2009 |
Remedial Investigation Report |
|
Jeld Wen - Addendum to Final Work Plan for RI/FS and DCAP
|
3/13/2009 |
Remedial Investigation Work Plan |
|
Jeld Wen - Safety and Health Plan
|
10/21/2008 |
Health and Safety Plan |
|
Jeld Wen - RI/FS Work Plan
|
10/21/2008 |
Remedial Investigation Work Plan |
|
Jeld Wen - Miscellaneous UST-related documents 1989-1994
|
6/3/1994 |
Site Specific Technical Document - Other |
|
Jeld Wen - UST Removal - 30-day notice
|
10/4/1990 |
LUST Status Report |