  • Site Status

  • Cleanup Started

Current Status

Aerial view of Northern State property, September 2017
Aerial view of Northern State property, September 2017

Last Updated: February 2021

Información en español abajo


Toxics Cleanup Program Brownfield Success Story: Sedro-Woolley Innovation for Tomorrow (SWIFT) Center

Fact Sheet
(January 2021)


Cleanup Process Moves Toward Remedial Investigation and Feasibility Study


Response to Comments
(April 2019)

Fact Sheet
(March 2019)

Ecology conducted a public comment period (March 18 – April 16, 2019) on an agreed order (legal agreement) and a public participation plan for the Northern State Multi Service Center cleanup site (Site). The Site is located on the eastern edge of Sedro-Woolley in Skagit County. The property was formerly owned and operated by Washington State as the Northern State Hospital and is now owned by the Port of Skagit (Port). 

Ecology reviewed and considered all comments received on the legal agreement. Based on Ecology’s evaluation of the comments, no changes were made to the documents, and they have been finalized. (Final Agreed Order)

Ecology issued a Response to Comments to address comments received.

En español
El Departamento de Ecología le invita a revisor los documentos para el sitio que está contaminado Northern State Multi Service Center en Sedro-Woolley.  

Si le gustaría recibir este documento en español, por favor llame al 509-329-3444 o envíe un correo electrónico a preguntas@ecy.wa.gov.  Traducciones de avisos públicos para este sitio de limpieza se preparan bajo solicitud.

General Cleanup Process

The Model Toxics Control Act (MTCA) is Washington’s environmental cleanup law). It provides requirements for contaminated site cleanup and sets standards that protect human health and the environment. Ecology enacts the MTCA and oversees cleanups. The MTCA site cleanup process is completed in steps (see graphic below) over a variable timeline.
(Click graphic to enlarge)
(Click graphic to enlarge)

Site Timeline

  • Early 2019:  Held a 30-day public comment period (March 18 – April 16, 2019).  Held a public meeting on March 27, 2019 (presentation link).
  • Later 2019:  Ecology will finalize the Agreed Order (legal agreement).  Two Interim Actions, detailed in the Agreed Order, are planned to begin in Summer 2019.

Public Participation

Current Northern State Multi Service Center cleanup site Public Participation Plan

This plan includes information for the public regarding opportunities to get involved in the Site cleanup process. The outreach activities and mechanisms presented reflect Ecology’s current plans for keeping the public informed and for receiving information and comments from the public.

Site Information

Former Northern State Hospital, 2012.  Photo courtesy of public domain.
Former Northern State Hospital, 2012. Photo courtesy of public domain.

Site History
The approximately 225-acre Northern State Multi Service Center cleanup site (Site) is located on the eastern edge of Sedro-Woolley in Skagit County. It was formerly Washington State’s Northern State Hospital, constructed in 1912. The hospital treated psychiatric patients until it closed in 1973. The Northern State Hospital is on the National Registry of Historic Places.

1912-1973: Northern State Hospital treats psychiatric patients.
2014: Interlocal multi-agency agreement drafted.
2015:

2018:  Washington State transfers property ownership to Port of Skagit.



SWIFT Center

In June 2018 the Washington Department of Enterprise Services transferred ownership to the Port of Skagit. The property’s buildings are currently leased to multiple tenants. The Port of Skagit, Skagit County, and the City of Sedro-Woolley are partnering on re-use of the property as the the Sedro-Woolley Innovation for Tomorrow Center or SWIFT Center, a mixed use campus focused on technology and innovation.

Contamination
Contamination is from the former state hospital operations and the materials used in the Site’s historic buildings. Preliminary testing found contamination in:

  • Soil:  metals, carcinogenic polycyclic aromatic hydrocarbons (cPAHs), tetrachloroethene (PCE) and petroleum products.
  • Groundwater: metals, PCE, trichloroethene (TCE), and petroleum products.

Contaminant levels within the Northern State Multi Service Center are present at potentially harmful levels and must be addressed under Washington's toxics cleanup law, the Model Toxics Control Act (MTCA).

Pollution Liability Insurance Agency

A portion of this site is being managed by the Pollution Liability Insurance Agency (PLIA). For more information please see PLIA’s PTAP website or contact Kristin Evered.

Note: Records for this site could be held at both Ecology and PLIA.
Legal 4
Leaking Underground Storage Tank 3
Document Title Document Date Document Type
North Cascades Gateway Center UST Removal Report 8/21/2002 LUST Site Characterization Report
Northern State Multi-Service Center - UST Removal Summary Report 4/20/1994 LUST Status Report
Northern State Multi-Service Center - UST Removal Sites number 3 and 4 4/8/1993 LUST Site Characterization Report
Public Information 6
Technical Reports 29
Document Title Document Date Document Type
Northern State Multi Service Center - AO Progress Report - 1st Quarter 2023 4/28/2023 Progress Report
Northern State Multi Service Center - AO Progress Report - 4th Quarter 2022 2/22/2023 Progress Report
Northern State Multi Service Center - Change of Project Coordinator Letter 1/11/2023 Site Specific Administrative Document - other (Administrative correspondence)
Northern State Multi Service Center - AO Progress Report - 3rd Quarter 2022 11/3/2022 Progress Report
Northern State Multi Service Center - AO Progress Report - 2nd Quarter 2022 8/10/2022 Progress Report
Northern State Multi Service Center - AO Progress Report - 1st Quarter 2022 5/4/2022 Progress Report
Northern State Multi Service Center - AO Progress Report - 4th Quarter 2021 2/2/2022 Progress Report
Northern State Multi Service Center - AO Progress Report - 3rd Quarter 2021 11/2/2021 Progress Report
Northern State Multi Service Center - AO Progress Report - 2nd Quarter 2021 7/30/2021 Progress Report
Northern State Multi Service Center - AO Progress Report - 1st Quarter 2021 5/3/2021 Progress Report
Northern State Multi Service Center - Remedial Investigation Work Plan 3/15/2021 Remedial Investigation Work Plan
Northern State Multi Service Center - AO Progress Report - 4th Quarter 2020 1/28/2021 Progress Report
Northern State Multi Service Center - Interim Cleanup Action Plan & Engineering Design Report for AOC 4 1/12/2021 Interim Action Documents
Northern State Multi Service Center - AO Progress Report - 3rd Quarter 2020 10/29/2020 Progress Report
Northern State Multi Service Center - AO Progress Report - 2nd Quarter 2020 7/31/2020 Progress Report
Northern State Multi Service Center - AO Progress Report - 1st Quarter 2020 5/1/2020 Progress Report
Northern State Multi Service Center - AO Progress Report - 4th Quarter 2019 1/24/2020 Progress Report
Northern State Multi Service Center - AO Progress Report - 3rd Quarter 2019 11/1/2019 Progress Report
PHASE II ENVIRONMENTAL SITE, FORMER NORTHERN STATE HOSPITAL 10/29/2018 Site Specific Technical Document - other
Analysis of Brownfields Cleanup Alternatives, Former Northern State Hospital, Sedro-Woolley WASHINGTON 10/26/2018 Site Specific Technical Document - other
Northern State Multi Service Center - Preliminary Remedial Investigation and Feasibility Study 6/30/2015 Remedial Investigation / Feasibility Study
Northern State Multi-Service Center - Focused Site Assessment Report 1/19/2015 Site Specific Technical Document - other
Northern State Multi-Service Center - Work Plan 9/4/2014 Site Specific Technical Document - other
Northern State Multi-Service Center - Draft Focused Site Assessment Work Plan 8/5/2014 Site Specific Technical Document - other
Northern State Multi-Service Center - Intergrated Planning Grant 3/4/2014 Site Specific Administrative Document - other (Administrative correspondence)
Northern State Multi-Service Center - Intergranted planning grant decision memo 1/30/2014 Site Specific Administrative Document - other (Administrative correspondence)
Northern State Multi-Service Center - Adaptive Reuse Study 1/13/2014 Site Specific Technical Document - other
Northern State Multi-Service Center - Application for Northern State IPG 1/13/2014 Site Specific Administrative Document - other (Administrative correspondence)
Northern State Multi-Service Center - Letter 5/17/2012 Site Specific Administrative Document - other (Administrative correspondence)
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.
  • Ecology Bellingham Field Office
    913 Squalicum Way, Unit 101
    Bellingham, 98225
    This location may only have print documents available during open comment periods.
  • Central Skagit Sedro-Woolley Library
    110 W State St
    Sedro-Woolley, 98284
    This location may only have print documents available during open comment periods.

Contaminants 5

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Halogenated Solvents C
Non-Halogenated Organics - Benzene S S
Non-Halogenated Organics - Petroleum-Diesel C S
Non-Halogenated Organics - Petroleum-Gasoline C S
Non-Halogenated Organics - Petroleum-Other C S
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.