Facility Site ID: 62773 Cleanup Site ID: 15008

  • Site Status

  • Cleanup Started
Nov. 18
12:00 am
Dec. 19
11:59 pm

Public Comment Period

Block 38 West documents ready for public review and comment

Fact Sheet: English | 中文 

Submit Comments | Read Comments 

We invite you to review the following cleanup documents between Ecology and City Investors IX L.L.C.

  • Remedial Investigation and Focused Feasibility Study (Volume 1 and Volume 2): describes contamination at the Site and evaluates and recommends a preferred cleanup action.

  • Draft Cleanup Action Plan: describes the cleanup work to address contamination at the Site.

  • Consent Decree: a legal agreement between Ecology and City Investors IX, that requires City Investors IX to implement the cleanup action plan for the Site.

Current Status

New construction at Block 38 West Property, February 2023
New construction at Block 38 West Property, February 2023
Updated November 2024

Fact Sheet: English | 中文 

The Department of Ecology (Ecology) is overseeing the cleanup of the Block 38 West Site (Site) in Seattle’s South Lake Union neighborhood. City Investors IX L.L.C. (City Investors IX) is the Potentially Liable Person (PLP) cleaning up the Site. We invite you to review and comment on the following documents:

  • Remedial Investigation and Focused Feasibility Study (Volume 1 and Volume 2): describes contamination at the Site and evaluates and recommends a preferred cleanup action.

  • Draft Cleanup Action Plan: describes the cleanup work to address contamination at the Site.

  • Consent Decree: a legal agreement between Ecology and City Investors IX, that requires City Investors IX to implement the cleanup action plan for the Site.

What Happens Next?

Ecology will consider all comments received during this public comment period and may amend the documents based on the comments. If the documents require significant changes, we will hold another public comment period. If no significant changes are made, Ecology will finalize the documents.

Sign Up For Updates!

Join our email list to receive updates about the South Lake Union cleanup sites, including Block 38 West. You may also email the Public Involvement Coordinator (listed under Contacts) to be added to the list. Unsubscribe at any time.

Subscribe here!

General Cleanup Process

The Model Toxics Control Act (MTCA) is Washington’s environmental cleanup law. It provides requirements for contaminated site cleanup and sets standards that protect human health and the environment. Ecology enacts MTCA and oversees cleanups. The MTCA site cleanup process is completed in steps over a variable timeline.

Public Participation

Current Block 38 West cleanup site Public Participation Plan

This plan describes how Ecology will share information with the community and how you can share information with us. Ecology will review this plan as the cleanup progresses and amend/update it as necessary.

Site Information

Block 38 West cleanup Site location
Block 38 West cleanup Site location

Site Location

The Block 38 West Site is located in the South Lake Union neighborhood of Seattle. The Site includes the Block 38 West Property, a portion of the Westlake Avenue North right of way, and a north-south-trending alley (City of Seattle public right-of-way) east of the Block 38 West Property.

Site Background

Historical operations and placement of contaminated fill at the Block 38 West Property resulted in contaminated soil and groundwater at the Site.

From October 2019 through July 2021, substantial cleanup of the Block 38 West Site was performed through interim actions (early partial cleanups) on the Block 38 West Property and east-adjacent alley. These interim actions included removal and disposal of contaminated soil and were implemented in conjunction with the redevelopment of the Block 38 West Property.

View the Interim Action Completion Report for the Block 38 West Property:

View the Interim Action Completion Report for the Alley

These reports are also included in the Documents tab under Technical Reports at the bottom of this webpage.

Recent Redevelopment

Redevelopment of the Block 38 West Property began in late October 2019. The former structures were demolished and a multi-story mixed-use building with 12 stories above street level and 4 levels of underground parking was constructed. Construction of the new building required mass excavation across the entire Block 38 West Property to approximately 30 to 35 feet below ground level.

Contamination

Between 1994 and 2024 multiple phases of the Remedial Investigation were executed to assess the Site for contaminants of concern and to establish cleanup levels. Investigations found the following contaminants in soil and/or groundwater:

  • Petroleum hydrocarbons as diesel-range organics (DRO), oil-range organics (ORO), and gasoline-range organics (GRO)
  • Benzene
  • Naphthalenes, including 1-methylnaphthalene and 2-methylnaphthalene
  • Carcinogenic polycyclic aromatic hydrocarbons (cPAHs), including benzo(a)pyrene
  • Metals (barium and mercury)
These contaminants were present at levels that exceeded standards under the state’s cleanup law, the Model Toxics Control Act (MTCA). Most of the contamination was removed during the interim actions. The interim actions constitute a permanent cleanup action to the maximum extent practicable in accordance with MTCA and current and future land use. Only the implementation of institutional controls remains.

Requesting Accommodation

Ecology is committed to providing people with disabilities access to information and services. To request an ADA accommodation, contact Ecology by phone at 360-407 6831, email ecyadacoordinator@ecy.wa.gov, or visit ecology.wa.gov/Accessibility. For Relay Service or TTY call 711 or 877-833-6341.

If you speak a non-English language, free language services are available.
Legal 6
Public Information 10
Document Title Document Date Document Type
Block 38 West Public Participation Plan - Nov 2024 11/12/2024 Public Participation Plan
Block 38 West Fact Sheet - RIFSS CAP CD Chinese - November 2024 11/6/2024 Fact Sheet\Public Notices
Block 38 West Fact Sheet - RIFSS CAP CD - November 2024 11/6/2024 Fact Sheet\Public Notices
Response to Comments Block 38 West IAWP 1/22/2021 Responsiveness Summary
Block 38 West Fact Sheet Interim Action Spanish - December 2020 12/16/2020 Fact Sheet\Public Notices
Block 38 West Fact Sheet Interim Action Chinese - December 2020 12/16/2020 Fact Sheet\Public Notices
Block 38 West Fact Sheet Interim Action - December 2020 12/16/2020 Fact Sheet\Public Notices
Block 38 West Fact Sheet Legal Agreements - March 2020 CHINESE 3/12/2020 Fact Sheet\Public Notices
Block 38 West Fact Sheet Legal Agreements - March 2020 SPANISH 3/12/2020 Fact Sheet\Public Notices
Block 38 West Fact Sheet Legal Agreements - March 2020 3/12/2020 Fact Sheet\Public Notices
State Environmental Policy Act 2
Document Title Document Date Document Type
Block 38 West - Ecology SEPA Comment Letter 5/16/2019 SEPA Documents
Block 38 West - Addendum to the FEIS 4/29/2019 SEPA Documents
Technical Reports 86
Document Title Document Date Document Type
Block 38 West - Draft Cleanup Action Plan - October 2024 10/28/2024 Cleanup Action Plan
Block 38 West - AO Progress Report for September 2024 10/14/2024 Progress Report
Block 38 West - SHARP Report 10/14/2024 SHARP Report
Block 38 West - AO Progress Report for August 2024 9/16/2024 Progress Report
Block 38 West - DRAFT Remedial Investigation and Focused Feasibility Study - Volume 2 8/20/2024 Remedial Investigation / Feasibility Study
Block 38 West - DRAFT Remedial Investigation and Focused Feasibility Study - Volume 1 8/20/2024 Remedial Investigation / Feasibility Study
Block 38 West - AO Progress Report for July 2024 8/15/2024 Progress Report
Block 38 West - AO Progress Report for June 2024 7/12/2024 Progress Report
Block 38 West - AO Progress Report for May 2024 6/14/2024 Progress Report
Block 38 West - AO Progress Report for April 2024 5/13/2024 Progress Report
Block 38 West - AO Progress Report for March 2024 4/15/2024 Progress Report
Block 38 West - AO Progress Report for February 2024 3/15/2024 Progress Report
Block 38 West - AO Progress Report for January 2024 2/13/2024 Progress Report
Block 38 West - AO Progress Report for December 2023 1/15/2024 Progress Report
Block 38 West - Alley Interim Action Report 1/5/2024 Interim Action Documents
Block 38 West - Interim Action Report (Property Cleanup) - Appx C thru Appx K 12/28/2023 Interim Action Documents
Block 38 West - Interim Action Report (Property Cleanup) - Appx B 12/28/2023 Interim Action Documents
Block 38 West - Interim Action Report (Property Cleanup) - text, figures, tables, Appx A 12/28/2023 Interim Action Documents
Block 38 West - AO Progress Report for November 2023 12/13/2023 Progress Report
Block 38 West - AO Progress Report for October 2023 11/15/2023 Progress Report
Block 38 West - AO Progress Report for September 2023 10/12/2023 Progress Report
Block 38 West - AO Progress Report for August 2023 9/14/2023 Progress Report
Block 38 West - AO Progress Report for July 2023 8/15/2023 Progress Report
Block 38 West - AO Progress Report for June 2023 7/17/2023 Progress Report
Block 38 West - AO Progress Report for May 2023 6/13/2023 Progress Report
Block 38 West - AO Progress Report for April 2023 5/15/2023 Progress Report
Block 38 West - RI Work Plan Approval Letter 5/1/2023 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - Final Remedial Investigation Work Plan 4/26/2023 Remedial Investigation Work Plan
Block 38 West - AO Progress Report for March 2023 4/14/2023 Progress Report
Block 38 West - AO Progress Report for February 2023 3/15/2023 Progress Report
Block 38 West - AO Progress Report for January 2023 2/15/2023 Progress Report
Block 38 west - AO Progress Report for December 2022 1/16/2023 Progress Report
Block 38 West - AO Progress Report for November 2022 12/15/2022 Progress Report
Block 38 West - AO Progress Report for October 2022 11/15/2022 Progress Report
Block 38 West - AO Progress Report for September 2022 10/13/2022 Progress Report
Block 38 West - AO Progress Report for August 2022 9/15/2022 Progress Report
Block 38 West - AO Progress Report for July 2022 8/15/2022 Progress Report
Block 38 West - AO Progress Report for June 2022 7/15/2022 Progress Report
Block 38 West - AO Progress Report for May 2022 6/15/2022 Progress Report
Block 38 West - AO Progress Report for April 2022 5/13/2022 Progress Report
Block 38 West - AO Progress Report for March 2022 4/15/2022 Progress Report
Block 38 West - AO Progress Report for February 2022 3/15/2022 Progress Report
Block 38 West - AO Progress Report for January 2022 2/15/2022 Progress Report
Block 38 West - AO Progress Report for December 2021 1/17/2022 Progress Report
Block 38 West - AO Progress Report for November 2021 12/15/2021 Progress Report
Block 38 West - AO Progress Report for October 2021 11/15/2021 Progress Report
Block 38 West - AO Progress Report for September 2021 10/15/2021 Progress Report
Block 38 West - AO Progress Report for August 2021 9/15/2021 Progress Report
Block 38 West - AO Progress Report for July 2021 8/16/2021 Progress Report
Block 38 West - AO Progress Report for June 2021 7/15/2021 Progress Report
Block 38 West - AO Progress Report for May 2021 6/15/2021 Progress Report
Block 38 West - AO Progress Report for April 2021 5/17/2021 Progress Report
Block 38 West - AO Progress Report for March 2021 4/15/2021 Progress Report
Block 38 West - AO Progress Report for February 2021 3/15/2021 Progress Report
Block 38 West - AO Progress Report for January 2021 2/15/2021 Progress Report
Block 38 West - Sampling and Analysis Plan_Alley Area (Interim Action) 2/10/2021 Sampling and Analysis Plan
Block 38 West - Interim Action Work Plan_Alley Area 2/3/2021 Interim Action Documents
Block 38 West - AO Progress Report for December 2020 1/15/2021 Progress Report
Block 38 West - AO Progress Report for November 2020 12/15/2020 Progress Report
Block 38 West - AO Progress Report for October 2020 11/16/2020 Progress Report
Block 38 West - AO Progress Report for September 2020 10/15/2020 Progress Report
Block 38 West - AO Progress Report for August 2020 9/15/2020 Progress Report
Block 38 West - Ecology Approval of Alley Supplemental Investigation Work Plan 9/11/2020 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - Responses to Ecology Comments on June 2020 Alley Supplemental Investigation Work Plan 9/10/2020 Site Specific Technical Document - other
Block 38 West - AO Progress Report for July 2020 8/14/2020 Progress Report
Block 38 West - Ecology Comments on June 2020 Alley Supplemental Investigation Work Plan 8/12/2020 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - AO Progress Report for June 2020 7/15/2020 Progress Report
Block 38 West - AO Progress Report for May 2020 6/15/2020 Progress Report
Block 38 West - Supplemental Subsurface Investigation Work Plan (Adjacent Alley) and Foundation Elements Memo 6/15/2020 Remedial Investigation Work Plan
Block 38 West - Farallon Interim Action Soil Data Summary Memo 5/29/2020 Interim Action Documents
Block 38 West - Monitoring Well Installation (Building Wells) Work Plan Memo 5/22/2020 Scope Of Work
Block 38 West - AO Progress Report for April 2020 5/15/2020 Progress Report
Block 38 West - SHA Rank Letter 2/18/2020 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - Site Hazard Assessment 2/10/2020 Site Hazard Assessment Report
Block 38 West - Subsurface Investigation Results, Letter Report 1/22/2020 Remedial Investigation Report
Block 38 West - Groundwater Monitoring Program - Technical Memo 1/13/2020 Site Specific Technical Document - other
Block 38 West - Farallon Release Notification Letter 12/9/2019 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - Independent IAWP_Part 4-Appendix F through I_Nov2019 11/8/2019 Interim Action Documents
Block 38 West - Independent IAWP_Part 3-Appendix B through E_Nov2019 11/8/2019 Interim Action Documents
Block 38 West - Independent IAWP_Part 2-Appendix A_Nov2019 11/8/2019 Interim Action Documents
Block 38 West - Independent Interim Action Work Plan (IAWP)_Part 1-Text-Figures-Tables_Nov2019 11/8/2019 Interim Action Documents
Block 38 West - SHA Notification Letter 9/11/2019 Site Specific Administrative Document - other (Administrative correspondence)
Block 38 West - Initial Investigation Field Report 7/31/2019 Initial Investigation Report
Block 38 West - Subsurface Investigation Report and Enviro Media Mgmt Plan 12/28/2018 Site Specific Technical Document - other
Block 38 West - Farallon Tech Memo: Summary of Results from Subsurface Investigations 10/16/2018 Site Specific Technical Document - other
South Lake Union, Seattle, WA - Cleanup Site Summary - June 2017 6/30/2017 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Contaminants 7

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Metals - Metals - Other RB
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons C RB
Metals - Mercury RB
Non-Halogenated Organics - Benzene RB
Non-Halogenated Organics - Petroleum-Diesel C RB
Non-Halogenated Organics - Petroleum-Gasoline RB RB
Non-Halogenated Organics - Petroleum-Other C RB
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.