This is the Ecology webpage for the Time Oil Bulk Terminal Cleanup Site. The Site includes five parcels of land, including the BNSF Property. Please see Site History section below for a description of each of these properties.

Site Status

View of the Time Oil site
View of the Time Oil site

Last Updated: May 2026

Ecology is overseeing cleanup of the Time Oil Bulk Terminal site (Site) in Seattle. Two parties are investigating and cleaning up contamination under two separate legal agreements. In 2020, TOC Seattle Terminal 1 LLC (TOCST) purchased four parcels associated with the former Time Oil Bulk Terminal facility (Property) and entered into a Prospective Purchaser Consent Decree (PPCD) with Ecology for cleanup and redevelopment of the Property. In 2021, BNSF Railway Company (BNSF) entered into an Agreed Order with Ecology to complete the remedial investigation (RI) and feasibility study (FS) and prepare a draft Cleanup Action Plan (dCAP) for an adjacent parcel south of the Property (BNSF Property). 

Activities by both parties are ongoing under these two legal agreements, which are described in more detail below. 

Property Location And History

The Property is generally located at 2737-2805 West Commodore Way in Seattle, along the industrial waterfront area of Salmon Bay on the Lake Washington Ship Canal. It is approximately 11 acres in size and consists of multiple parcels, including two waterfront parcels and formerly two larger parcels south of West Commodore Way which have since been divided into 6 smaller parcels.

Time Oil began bulk fuel operations at the Property in the early 1940s to support World War II efforts. The former Time Oil Bulk Terminal stored large quantities of fuel during and after the war. In later years, portions of it were leased to other parties for industrial purposes. Rail spurs from the BNSF railroad historically serviced the Property to load and unload fuels and other materials during its operations.

The historical operations and uses resulted in releases of petroleum hydrocarbons, chlorinated solvents, wood preservative, and metals into soil and groundwater on the Property, the adjacent West Commodore Way right-of-way, the BNSF Property to the south, and sediments in Salmon Bay to the north. Several interim cleanup actions were done between 1991 and 2017 to remove some contamination. TOCST is conducting a final cleanup action to address the remaining contamination at the Property, including parts of the West Commodore right-of-way. BNSF is in the process of completing remedial investigation and feasibility study activities to select a final cleanup action for the BNSF Property.

The Site includes anywhere on or near the Property where hazardous substances from the former Time Oil facility have ended up. This covers parts of the Property, West Commodore Way, the sediments in Salmon Bay, the BNSF Property, and possibly other nearby areas.

Tocst Parcels

Some parts of the Property are currently being cleaned up under TOCST’s PPCD and final cleanup plan. These areas are called the Bulk Terminal, ASKO, and East Waterfront parcels. The West Waterfront parcel was also bought by TOCST, but it does not need cleanup. After TOCST bought the Property, the Bulk Terminal and ASKO parcels were divided into seven smaller parcels. The easternmost one, called Lot F, was sold to someone else but still has to follow the cleanup requirements in the PPCD and final cleanup plan.

Tocst Property Cleanup Action - Phase 1

Property Cleanup Summary figure from Remedial Action Completion Report Phase 1 - Final (August 8, 2022)
Property Cleanup Summary figure from Remedial Action Completion Report Phase 1 - Final (August 8, 2022)
Under PPCD No. 20‑2‑15215‑3 SEA, TOCST finished the first phase of cleanup in 2021. This work included:

  • Excavating and hauling away 15,390 tons of contaminated soil from the Bulk Terminal, ASKO, and East Waterfront parcels, plus part of West Commodore Way.
  • Treating about 27,900 cubic yards of contaminated soil on the Bulk Terminal and ASKO parcels using in‑place solidification and stabilization (ISS).
  • Installing a trench and permeable reactive barrier along the south edge of the Property to capture and treat contaminated groundwater coming from the BNSF Property.
  • Injecting treatment materials into the ground to clean up contaminated groundwater on the ASKO parcel.
  • Application of an oxygen releasing compound to treat approximately 336 cubic yards of contaminated soil and groundwater remaining beneath utilities in West Commodore Way.

In early 2023, a Long‑Term Compliance Monitoring Plan (LTCMP) was finalized for the Property. It includes a Groundwater Monitoring Plan, a Soil and Remedial Elements Management Plan, and a Vapor Intrusion Assessment and Mitigation Plan. TOCST began carrying out the LTCMP soon after it was finalized and continues to monitor groundwater to track cleanup progress and make sure the work meets the required standards.

Tocst Property Cleanup Action - Phase 2

Subdivided parcels (Source: King County Parcel Viewer, 2026)
Subdivided parcels (Source: King County Parcel Viewer, 2026)
TOCST will put a protective cap over the Bulk Terminal and ASKO parcels where contamination remains after the first phase of work. This cap will keep the remaining contamination contained until it naturally reaches safe cleanup levels.

The cap is being installed as the Property is redeveloped. As of 2025, only Lot F has been redeveloped and capped. Temporary surfaces cover the rest of the ASKO and Bulk Terminal parcels. Redevelopment of the remaining parcels is expected to start in 2026. All new buildings will include vapor‑intrusion protections to keep indoor air safe. Environmental covenants will be recorded for each redeveloped parcel that still has contamination in soil or groundwater. These covenants will set limits and requirements to prevent activities that could damage the cap, interfere with engineered cleanup systems, or expose people to contamination.

Bnsf Property And Remedial Actions

Remedial Investigation in progress at the BNSF property (February 2025)
Remedial Investigation in progress at the BNSF property (February 2025)
The BNSF-owned parcel next to the Property is still contributing contamination to the Site. Under Agreed Order No. 18042, BNSF has completed several steps so far:

  • They prepared a Remedial Investigation Work Plan (RIWP), which Ecology approved in 2023.
  • They carried out field investigation work from 2023 to 2025 as outlined in the RIWP.
  • They submitted a draft Remedial Investigation (RI) Report to Ecology in 2026. 
Ecology is now reviewing the draft RI Report. When it is ready for public review, Ecology will hold a public comment period. After the RI Report is finalized, BNSF will prepare a Feasibility Study (FS) to evaluate possible cleanup options for contamination on the BNSF Property. BNSF may also complete an interim cleanup action under the agreed order.

General Cleanup Process

The Model Toxics Control Act (MTCA) is Washington’s environmental cleanup law. It provides requirements for contaminated site cleanup and sets standards that protect human health and the environment. Ecology enacts the MTCA and oversees cleanups. The MTCA site cleanup process is completed in steps over a variable timeline.
Click image to enlarge
Click image to enlarge
Legal 5
Outreach Information 8
Document Title Document Date Document Type
Time Oil-BNSF Property - Factsheet (Spanish) - August 2021 8/22/2021 Fact Sheet\Public Notices
Time Oil-BNSF Property - Public Participation Plan - August 2021 8/11/2021 Public Participation Plan
Time Oil-BNSF Property - Factsheet (English) - August 2021 8/11/2021 Fact Sheet\Public Notices
Time Oil - Final Response to Comments - September 2020 9/25/2020 Responsiveness Summary
Time Oil Bulk Terminal - Presentation - July 29, 2020 7/29/2020 Multimedia
Time Oil - Factsheet-Spanish - July 2020 7/16/2020 Fact Sheet\Public Notices
Time Oil - Public Participation Plan - July 2020 7/14/2020 Public Participation Plan
Time Oil Bulk Terminal - Fact Sheet - July 2020 7/13/2020 Fact Sheet\Public Notices
State Environmental Policy Act 2
Document Title Document Date Document Type
Time Oil Bulk Terminal - SEPA Determination - June 2020 6/24/2020 SEPA Documents
Time Oil Bulk Terminal - SEPA Checklist - June 2020 6/22/2020 SEPA Documents
Technical Reports 138
Document Title Document Date Document Type
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2026 10/15/2026 Progress Report
Time Oil BNSF Property - AO Progress Report - Third Quarter 2026 10/14/2026 Progress Report
Time Oil BNSF Property - AO Progress Report - Second Quarter 2026 7/15/2026 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2026 7/9/2026 Progress Report
Time Oil Bulk Terminal - Ecology Approval of Notice of Construction, New Buildings and Storm Vault 6/16/2026 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - Ecology Approval and Comments on Well Network Update Plan 6/16/2026 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - Notice of Construction, New Buildings and Storm Vault 6/5/2026 Site Specific Technical Document - Other
Time Oil Bulk Terminal - Well Network Update Plan (email and attachments) 5/29/2026 Site Specific Technical Document - Other
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2026 4/15/2026 Progress Report
Time Oil BNSF Property - AO Progress Report - First Quarter 2026 4/15/2026 Progress Report
Time Oil Bulk Terminal - 2025 Annual Report (with April 2026 final Appendix A) 2/25/2026 Monitoring Report
Time Oil BNSF Property - AO Progress Report - Fourth Quarter 2025 1/15/2026 Progress Report
Time Oil BNSF Property - Q3 2025 Lab Analytical Report 10/24/2025 Monitoring Report
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2025 10/15/2025 Progress Report
Time Oil BNSF Property - AO Progress Report - Third Quarter 2025 10/15/2025 Progress Report
Time Oil Bulk Terminal - Draft Q3 2025 Groundwater Data 10/8/2025 Monitoring Report
Time Oil Bulk Terminal - SHARP Report 8/28/2025 Site Hazard Assessment and Ranking Process Report
Time Oil BNSF Property - AO Progress Report - Second Quarter 2025 7/15/2025 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2025 7/14/2025 Progress Report
Time Oil BNSF Property - RI Well Development Logs (Draft) 6/20/2025 Site Specific Technical Document - Other
Time Oil BNSF Property - May 8 2025 RI Data Presentation Slides (draft for discussion purposes) 5/23/2025 Site Specific Technical Document - Other
Time Oil BNSF Property - RI Boring Logs, February 2025 Locations 5/23/2025 Site Specific Technical Document - Other
Time Oil BNSF Property - RI Boring Logs, November 2023 Locations 5/23/2025 Site Specific Technical Document - Other
Time Oil BNSF Property - AO Progress Report - First Quarter 2025 4/14/2025 Progress Report
Time Oil Bulk Terminal - Draft Q1 2025 Groundwater Data 4/11/2025 Monitoring Report
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2025 4/10/2025 Progress Report
Time Oil Bulk Terminal - 2024 Annual Report 2/26/2025 Monitoring Report
Time Oil Bulk Terminal - Notice of Construction, Grading and Capping Plan for Upland Parcels 2/19/2025 Construction Plans and Specifications
Time Oil BNSF Property - AO Progress Report - Fourth Quarter 2024 1/15/2025 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Fourth Quarter 2024 1/13/2025 Progress Report
Memo Re: Response to ASKO-BNSF Property Line Data Summary memo (Arcadis) 12/12/2024 Site Specific Technical Document - Other
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2024 10/15/2024 Progress Report
Time Oil BNSF Property - AO Progress Report - Third Quarter 2024 10/11/2024 Progress Report
Memo Re: ASKO-BNSF Property Line Data Summary (Floyd Snider) 10/1/2024 Site Specific Technical Document - Other
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2024 7/15/2024 Progress Report
Time Oil BNSF Property - AO Progress Report - Second Quarter 2024 7/11/2024 Progress Report
Time Oil BNSF Property - AO Progress Report - First Quarter 2024 4/16/2024 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2024 4/15/2024 Progress Report
Time Oil Bulk Terminal - 2023 Annual Report 3/1/2024 Monitoring Report
Time Oil BNSF Property - AO Progress Report - Fourth Quarter 2023 1/12/2024 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Fourth Quarter 2023 1/10/2024 Progress Report
Time Oil Bulk Terminal - Draft Q4 2023 Groundwater Data 1/4/2024 Monitoring Report
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2023 10/13/2023 Progress Report
Time Oil BNSF Property - AO Progress Report - Third Quarter 2023 10/13/2023 Progress Report
Time Oil Bulk Terminal - Draft Q3 2023 Groundwater Data 8/28/2023 Monitoring Report
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2023 7/14/2023 Progress Report
Time Oil BNSF Property - AO Progress Report - Second Quarter 2023 7/13/2023 Progress Report
Time Oil BNSF Property - Remedial Investigation Work Plan 6/26/2023 Remedial Investigation Work Plan
Time Oil Bulk Terminal - Draft Q2 2023 Groundwater Data 5/19/2023 Monitoring Report
Time Oil BNSF Property - AO Progress Report - First Quarter 2023 4/14/2023 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2023 4/7/2023 Progress Report
Time Oil Bulk Terminal - Draft Q1 2023 Groundwater Data 4/5/2023 Monitoring Report
Time Oil Bulk Terminal - Long-Term Compliance Monitoring Plan 2/10/2023 Monitoring Plan
Time Oil Bulk Terminal - PPCD Progress Report - Fourth Quarter 2022 1/11/2023 Progress Report
Time Oil BNSF Property - AO Progress Report - Fourth Quarter 2022 1/10/2023 Progress Report
Time Oil BNSF Property - AO Progress Report - Third Quarter 2022 10/14/2022 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2022 10/13/2022 Progress Report
Time Oil Bulk Terminal - Remedial Action Report_Phase 1-PART 1_text_tables_figures_AppsA1_A2_B 8/8/2022 Remedial Action/As-Built Report
Time Oil Bulk Terminal - Remedial Action Report_Phase 1-PART 2_AppC 8/8/2022 Remedial Action/As-Built Report
Time Oil Bulk Terminal - Remedial Action Report_Phase 1-PART 3_AppD 8/8/2022 Remedial Action/As-Built Report
Time Oil Bulk Terminal - Remedial Action Report_Phase 1-PART 4_AppsE_thru_K 8/8/2022 Remedial Action/As-Built Report
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2022 7/19/2022 Progress Report
Time Oil BNSF Property - AO Progress Report - Second Quarter 2022 7/13/2022 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2022 4/13/2022 Progress Report
Time Oil BNSF Property - AO Progress Report - First Quarter 2022 4/13/2022 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Fourth Quarter 2021 1/14/2022 Progress Report
Time Oil BNSF Property - AO Progress Report - Fourth Quarter 2021 1/6/2022 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Third Quarter 2021 10/15/2021 Progress Report
Time Oil Bulk Terminal - PPCD Progress Report - Second Quarter 2021 7/15/2021 Progress Report
Time Oil Bulk Terminal - EDR Approval Letter 6/29/2021 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - Engineering Design Report-part1_txt_tbls_figs_AppA_AppB 6/28/2021 Engineering Design Report
Time Oil Bulk Terminal - Engineering Design Report-part2_AppC_thru_AppH 6/28/2021 Engineering Design Report
Time Oil Bulk Terminal - Pre-Remedial Design Investigation Summary Report 5/17/2021 Site Specific Technical Document - Other
Time Oil Bulk Terminal - PPCD Progress Report - First Quarter 2021 4/15/2021 Progress Report
Time Oil Bulk Terminal - Ecology Project Coord Change Letter 3/22/2021 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - Pre-Remedial Design Work Plan 10/20/2020 Site Specific Technical Document - Other
Time Oil Bulk Terminal - Final Cleanup Action Plan - September 2020 9/25/2020 Cleanup Action Plan
Time Oil Bulk Terminal - Final Supplemental RI-FS Report-Part 1 9/25/2020 Remedial Investigation / Feasibility Study Report
Time Oil Bulk Terminal - Final Supplemental RI-FS Report-Part 2 9/25/2020 Remedial Investigation / Feasibility Study Report
Time Oil Bulk Terminal - SHA Rank Letter 7/9/2020 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - Site Hazard Assessment 7/7/2020 Site Hazard Assessment Report
Time Oil Bulk Terminal - Upland Ecological Risk Assessment Memo 6/26/2020 Terrestrial Ecological Evaluation
Time Oil Bulk Terminal - SHA Notification Letter (Wood) 8/14/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - SHA Notification Letter (Joyce) 8/14/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - SHA Notification Letter (DeGross) 8/14/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - SHA Notification Letter (Crabbe) 8/14/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Time Oil Bulk Terminal - SHA Notification Letter (Ice) 8/14/2019 Site Specific Administrative Document - Other (Administrative Correspondence)
Technical Memorandum: Sediment Data Summary Report 8/5/2019 Site Specific Technical Document - Other
Supplemental Upland Remedial Investigation Work Plan 3/27/2019 Remedial Investigation Work Plan
Technical Memorandum: Addendum to the Surface Sediment Quality Evaluation Sampling and Analysis Plan/Quality Assurance Project Plan, Cantera-TOC, Time Oil Bulk Terminal PPA 2/6/2019 Sampling and Analysis Plan
Former time Oil Company Seattle Terminal, Surface Sediment Quality Evaluation Sampling and Analysis Plan/Quality Assurance Project Plan 7/23/2018 Sampling and Analysis Plan
Letter fr Foster Pepper 6/6/2017 Site Specific Technical Document - Other
Letter from Foster Pepper 6/6/2017 Site Specific Technical Document - Other
TOC Bankruptcy Letters from Foster Pepper 6/6/2017 Site Specific Technical Document - Other
Time Oil Co Asko Property - Laboratory Analytical Reports 6/14/2016 Monitoring Report
Time Oil Co Seattle Terminal - Laboratory Analytical Reports 6/7/2016 Monitoring Report
Time Oil East Waterfront - Laboratory Analytical Reports 5/24/2016 Monitoring Report
Vapor Intrusion Assessment, ASKO Hydraulic Property 2/17/2016 Site Specific Technical Document - Other
Vapor Intrusion Assessment, Bulk Terminal Property, 2737 West Commdore Way, Seattle 2/15/2016 Site Specific Technical Document - Other
Subsurface Investigation Report, East Waterfront Property, 2750 West Commodore Way 12/2/2015 Site Specific Technical Document - Other
Subsurface Investigation Report, Bulk Terminal Property Southern Property Line, 2737 West Commodore Way, Seattle 8/3/2015 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Feasibility Study Report 6/17/2014 Feasibility Study
Time Oil Co Seattle Terminal - Remedial Investigation Rpt - text, figures, tables 6/14/2014 Remedial Investigation Report
Time Oil Co Seattle Terminal - RI Report - Appendix A, B, C, D, G, I, & J 6/14/2014 Remedial Investigation Report
Time Oil Co Seattle Terminal - RI Report - Appendix K (Part 1) 6/14/2014 Remedial Investigation Report
Time Oil Co Seattle Terminal - RI Report - Appendix K (Part 2) 6/14/2014 Remedial Investigation Report
Time Oil Co Seattle Terminal - RI Report - Appendix H 6/14/2014 Remedial Investigation Report
Time Oil 2754 Commodore (East Waterfront) - RI Report - text, figures, tables, Appendix A, B, & C 6/12/2014 Remedial Investigation Report
Time Oil 2754 Commodore (East Waterfront) - FS Report 6/12/2014 Feasibility Study
Time Oil 2754 Commodore (East Waterfront) - RI Report - Appendix D 6/12/2014 Remedial Investigation Report
Time Oil 2754 Commodore (East Waterfront) - RI Report - Appendix E 6/12/2014 Remedial Investigation Report
Time Oil 2754 Commodore (East Waterfront) - RI Report - Appendix F 6/12/2014 Remedial Investigation Report
Time Oil Co Asko Property - FS Report 6/9/2014 Feasibility Study
Time Oil Co Asko Property - RI Report - text, figures, tables, Appendix A, B, C, D, E, & I 5/23/2014 Remedial Investigation Report
Time Oil Co Asko Property - RI Report - CD files: Appendix F (previous reports) 5/23/2014 Remedial Investigation Report
Time Oil Co Asko Property - RI Report - CD files: Appendix G (boring logs) 5/23/2014 Remedial Investigation Report
Time Oil Co Asko Property - RI Report - CD files: Appendix H (groundwater lab data) 5/23/2014 Remedial Investigation Report
Time Oil Co Asko Property - RI Report - Appendix H (soil lab data) 5/23/2014 Remedial Investigation Report
Time Oil Co Seattle Terminal - Technical Memorandum: Sediment Quality 6/17/2008 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Annual Groundwater Monitoring Event, Fourth Quarter 2005 12/20/2005 Monitoring Report
Time Oil Co Seattle Terminal - Draft Quarterly Groundwater Sampling Report for November 2004 3/1/2005 Monitoring Report
Time Oil Co Seattle Terminal - Final Quarterly Groundwater Sampling Report for July 2004 11/1/2004 Monitoring Report
Time Oil Co Seattle Terminal - Final Quarterly Groundwater Sampling Report for July 2004 11/1/2004 Monitoring Report
Time Oil Co Seattle Terminal - Results of Ground Penatrating Radar and Electromagnetic Survey 9/17/2003 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Final Cleanup Action Plan 5/1/2003 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Final Limited Soil Removal Report at the Former PCP/Diesel Mixing Area 12/18/2002 Site Specific Technical Document - Other
Time Oil Co Asko Property - Final Environmental Site Assessments & RBCA Evaluation 10/1/2002 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Rapid Response Soil Excavation at western edge of parking area 8/23/2002 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Phase III Environmental Site Assessment 12/27/2001 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Final Phase II Environmental Site Assessment for the PCP/Diesel Mixing Areas 6/4/2001 Site Specific Technical Document - Other
Time Oil Co Asko Property - Final Environmental Site Assessment Phase II 4/6/2001 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Phase II Environmental Site Assessment 4/6/2001 Phase II Environmental Site Assessment
Time Oil Co Asko Property - Environmental Site Assessment Phase I 8/25/2000 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Phase I Environmental Site Assessment 8/25/2000 Site Specific Technical Document - Other
Time Oil 2754 Commodore - Phase I Environmental Site Assessment 8/25/2000 Site Specific Technical Document - Other
Time Oil 2754 Commodore - Site Assessment Report 3/8/2000 LUST Site Assessment Report
Time Oil 2754 Commodore - Excavating Activities Conducted at Former Waste Oil Tank Location 9/22/1992 Site Specific Technical Document - Other
Time Oil Co Seattle Terminal - Underground Storage Tank Site Check/Site Assessment 12/30/1991 Site Specific Technical Document - Other
Voluntary Cleanup Program 13
Document Title Document Date Document Type
Time Oil Bulk Terminal - NW3201 VCP Termination letter 10/22/2020 VCP Administrative Document
Opinion on Proposed Remedial Action - Time Oil Bulk Terminal PPA 4/8/2019 VCP Opinion on Site Cleanup – Other
Opinion on Proposed Remedial Action: Time Oil Bulk Terminal PPA 2/28/2019 Voluntary Cleanup Program Opinion – Other
Opinion on Proposed Remedial Action: Time Oil Bulk Terminal PPA 2/28/2019 VCP Opinion on Site Cleanup – Other
Time Oil Co Seattle Terminal - NW2948 VCP Termination by customer 6/6/2017 VCP Administrative Document
Time Oil Co Asko Property - NW2950 VCP Termination by customer 6/6/2017 VCP Administrative Document
Time Oil Co ASKO Property - NW2950 Staus Request Letter 6/1/2017 VCP Administrative Document
Time Oil 2754 Commodore - NW2949 Status Request Letter 6/1/2017 VCP Administrative Document
Time Oil Co Seattle Terminal - NW2948 Status Request Letter 6/1/2017 VCP Administrative Document
Time Oil Co Seattle Terminal - NW2948 Opinion Letter - RIFS 11/25/2015 VCP Opinion on Site Cleanup – Other
Time Oil Co Asko Property - NW2950 Opinion Letter - RIFS 11/24/2015 VCP Opinion on Site Cleanup – Other
Time Oil 2754 Commodore - NW2949 Opinion Letter - RIFS 10/8/2015 VCP Opinion on Site Cleanup – Other
Time Oil Bulk Terminal - NW1705 VCP Termination Letter 6/2/2010 VCP Administrative Document
Tribal Engagement 1
Document Title Document Date Document Type
Time Oil Bulk Terminal - Tribal Engagement Plan 7/13/2026 Tribal Engagement Plan
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.

Contaminants 7

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Dioxins/Furans C
Halogenated Organics - Halogenated Solvents C
Metals - Arsenic C C
Non-Halogenated Organics - Benzene C C
Non-Halogenated Organics - Other Non-Halogenated Organics C C
Non-Halogenated Organics - Petroleum-Diesel C C
Non-Halogenated Organics - Petroleum-Gasoline C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.