Taylor Way & Alexander Ave Fill Area

Facility Site ID: 1403183 Cleanup Site ID: 4692

  • Site Status

  • Cleanup Started

Sampling And Cleanup Planning Underway

The Agreed Order No. DE 14260 and Enforcement Order No. DE 19410 between Ecology and the Potentially Liable Persons (PLPs) responsible for cleanup at the Taylor Way & Alexander Ave Fill Area site are signed and in effect. The PLPs are responsible for cleanup at the site. The PLPs on the agreed order are General Metals of Tacoma, Occidental Chemical Corporation, and Burlington Environmental LLC. The PLP on the enforcement order is the Port of Tacoma. 

Ecology held a comment period from December 7, 2020, to January 5, 2021, inviting comment on the orders and the Public Participation Plan for the site. Five comments were received during the comment period. No changes were made to the orders or the plan based on the comments received. The Responsiveness Summary provides our responses to those comments.

The orders require sampling and gathering information necessary to plan for cleanup. The orders also require preparation of cleanup documents.

  • Remedial Investigation (RI) report identifies the type of contamination and where it is found at the site.
  • Feasibility Study (FS) compares cleanup methods.
  • Draft Cleanup Action Plan (dCAP) describes the method used to cleanup the site. 

Once the RI/FS and dCAP reports are prepared, the reports and agreements to implement the cleanup will be available for public comment.

A fact sheet briefly summarizes information about the site. 

Subscribe to the email list for updates to work done in the Tacoma Tideflats/Commencement Bay area. 

Site Background

Taylor Way & Alexander Avenue Fill Area site
Taylor Way & Alexander Avenue Fill Area site

The site is located near the Hylebos Waterway in Tacoma’s tideflats. Before the 1930s, the tideflats were the tidal marsh of the Puyallup River Delta. Since then, the delta has been filled-in for industrial uses and to support a busy seaport.

The site has a long and diverse industrial history, which is reflected in the nature of contamination. Part of the site was used as an unpermitted landfill for industrial waste. Other land uses included chemical and petroleum storage and recycling, hazardous waste treatment and storage, lumber milling, and warehousing and shipping operations. The site is currently used for mostly industrial purposes.

The Parcel History document shows the historical ownership, activities, and contaminant releases at the site.

Contamination

Soil and/or groundwater on the site are contaminated with:

  • Total petroleum hydrocarbons (TPH)
  • Volatile organic compounds (VOCs)
  • Semi-volatile organic compounds (SVOCs)
  • Polychlorinated biphenyls (PCBs)
  • Metals such as arsenic and lead

Air inside the buildings may have one or more VOCs that are harmful to human health. Methane was found below the ground surface. So far, methane testing in buildings show it is safe. 

Legal 8
Document Title Document Date Document Type
Taylor Way & Alexander Fill Area - Satifaction of Agreed Order No. DE 13921 2/11/2021 Order Notice of Satisfaction/Status
Taylor Way & Alexander Fill Area - Environmental Covenant 12/28/2020 Environmental Covenant; Alternative Mechanism
Enforcement Order No. DE 19410 12/4/2020 Enforcement Order
Agreed Order No. DE 14260 12/4/2020 Agreed Order
1514 Taylor Way Interim Action Agreed Order - Final 7/31/2017 Agreed Order
TWAAFA - Final Determination of Liability 11/22/2016 Final Potentially Liable Person Status Letter
ProLogis Agreed Order Unsigned Electronic Version 1/19/2005 Agreed Order
ProLogis Agreed Order Scanned Original Copy 12/21/2004 Agreed Order
Public Information 11
State Environmental Policy Act 2
Document Title Document Date Document Type
Taylor Way & Alexander Ave - draft SEPA determination 6/21/2017 SEPA Documents
Taylor Way & Alexander Avenue Fill Area SEPA Checklist 6/19/2017 SEPA Documents
Technical Reports 131
Document Title Document Date Document Type
TWAAFA - December 2023 - January 2024 Groundwater Data Analysis Report 4/8/2024 Groundwater Monitoring Report
Taylor Way and Alexander Avenue Fill Area (TWAAFA) Response to February 16, 2024 letter 4/3/2024 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Ecology January 4, 2024 letter regarding "Comments on investigation reports and requirement for work plan" - Response to Comments 2/16/2024 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way and Alexander Avenue Fill Area (TWAAFA) Comments on Investigation Reports 1/4/2024 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Approval of PFAS Sampling and Analysis Plan 12/27/2023 Site Specific Administrative Document - other (Administrative correspondence)
Approval of Per- and Polyfluoroalkyl Substances (PFAS) Sampling and Analysis Plan 12/27/2023 Sampling and Analysis Plan
TWAAFA - PFAS Sampling and Analysis Plan and Quality Assurance Project Plan 12/15/2023 Site Specific Technical Document - other
TWAAFA - Additional recommendations for 4th Qtr Groundwater Sampling 12/4/2023 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Response to Comments - Ecology September 6, 2023 letter. 10/23/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Comments on 4th quarter groundwater report and requirement for additional groundwater sampling 9/6/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Tier II Vapor Intrusion Assessment Report, Former Potter Property, 1801 E Alexander Avenue 8/23/2023 Site Specific Technical Document - other
TWAAFA - Supplemental investigation, Port Parcel 110 8/18/2023 Site Specific Technical Document - other
TWAAFA - Supplemental Subsurface Investigation, Potter Property 8/18/2023 Site Specific Technical Document - other
Taylor Way & Alexander Ave Fill Area - TWAAFA Burlington Environmental Stabilization Building Vapor Sampling Memorandum 7/26/2023 Site Specific Technical Document - other
TWAAFA - Preliminary Air and Vapor Results and Next Steps, 1801 Alexander Avenue, Tacoma, WA 7/1/2023 Site Specific Technical Document - other
TWAAFA - Approval of Supplemental Work Pan, Port Parcel 110 and Potter 3/13/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Fourth Quarter 2022 Groundwater Data Analysis Report 3/9/2023 Groundwater Monitoring Report
TWAAFA - Ecology January 26, 2023 regarding "Comments on Data Gaps Data Report" - Response to Comments 2/27/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Supplemental Investigation Work Plan, Port Parcel 110 and Potter Property 2/21/2023 Remedial Investigation Work Plan
TWAAFA - Comments on Port Parcel 110 & Potter Property Work Plan 2/6/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Comments on Data Gaps Data Report 1/26/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Comments on Indoor Air Sampling & Analysis Plan 1/23/2023 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Indoor Air Sampling and Analysis Plan, Former Potter Property 1/12/2023 Remedial Investigation Work Plan
TWAAFA - Indoor Air Sampling & Analysis Plan 12/19/2022 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - 1st & 2nd Qtr Groundwater Reports - Comments 11/28/2022 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Third Quarter 2022 Groundwater Data Analysis Report 11/23/2022 Groundwater Monitoring Report
TWAAFA - Revised Approval for Groundwater Monitoring 11/16/2022 Site Specific Administrative Document - other (Administrative correspondence)
Data Gaps Data Report 11/14/2022 Remedial Investigation Report
Ecology October 13, 2022 email regarding "Comments on TWAAFA reports and request for work plan." 11/3/2022 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Second Quarter 2022 Groundwater Data Analysis Report 8/10/2022 Groundwater Monitoring Report
Taylor Way and Alexander Avenue Fill Area - First Quarter 2022 Groundwater Data Analysis Report 5/6/2022 Groundwater Monitoring Report
TWAAFA - Revised Groundwater Monitoring Plan 4/7/2022 Remedial Investigation Work Plan
TWAAFA - Revised VI Status Conditional Approval 3/8/2022 Site Specific Administrative Document - other (Administrative correspondence)
Revised TWAAFA Data Gap Investigation Progress Summary and Soil Vapor Intrusion Status and Recommendations 12/3/2021 Site Specific Technical Document - other
Ecology Comments on the Revised Data Gap Investigation Progress Summary and Soil Vapor Intrusion Status and Recommendations Memorandum 11/3/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Groundwater Monitoring Network Evaluation Comments 11/2/2021 Site Specific Administrative Document - other (Administrative correspondence)
Revised Deep Well Summary Approach on Burlington, CleanCare, and Parcel A. 10/11/2021 Site Specific Technical Document - other
Revised TWAAFA Data Gap Investigation Progress Summary and Soil Vapor Intrusion Status and Recommendations 9/24/2021 Site Specific Technical Document - other
TWAAFA Existing Groundwater Monitoring Network Evaluation and Recommendations Addendum 9/16/2021 Site Specific Technical Document - other
Taylor Way & Alexander Ave Fill Area - Status Vapor Intrusion Recommendations 8/25/2021 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Re: Updated Initial Application for Prospective Purchaser Consent Decree for CleanCare Property 8/20/2021 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA Data Gap Investigation Progress Summary and Soil Vapor Intrusion Status and Recommendations 7/2/2021 Site Specific Technical Document - other
Taylor Way & Alexander Fill Area - Informal Dispute Decision 6/4/2021 Site Specific Administrative Document - other (Administrative correspondence)
Comments on the Aboveground Site Conditions Memorandum and Existing Groundwater Monitoring Network Evaluation and Recommendations Memorandum 5/5/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Avenue Fill Area, Request for Informal Dispute Decision to be Prepared by Ecology 4/29/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Avenue Fill Area Informal Dispute Notice Regarding Certain Invoiced Ecology Past Costs 4/9/2021 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA Existing Groundwater Monitoring Network Evaluation and Recommendations Memorandum 3/5/2021 Site Specific Technical Document - other
TWAAFA Aboveground Site Conditions Memorandum 3/5/2021 Site Specific Technical Document - other
Taylor Way & Alexander Fill Area - Ecology Past Cost Invoice 3/5/2021 3/5/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Fill Area - Prospective Purchaser Consent Decree fir CleanCare Property 2/23/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Fill Area - Enforcement Order No. DE 19410—Public Comment Period Submittal of Port Comments 2/4/2021 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Avenue Fill Area - Response to October 6, 2020, Notice of Planned Issuance of Enforcement Order 10/19/2020 Site Specific Administrative Document - other (Administrative correspondence)
Response to July 30, 2020, Letter and Notice of Planned Issuance of Enforcement Order 10/6/2020 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way and Alexander Avenue Fill Area - Comments on Revised Environmental Covenant 9/15/2020 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Approval of Interim Action Completion Report and List of Remaining Deliverables 8/19/2020 Site Specific Administrative Document - other (Administrative correspondence)
Letter to Ecology re Burlington-CES signature 8/3/2020 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Port of Tacoma Response to Proposed Agreed Order 7/31/2020 Site Specific Administrative Document - other (Administrative correspondence)
Appendices H-M - TWAAFA Data Gaps Work Plan 7/20/2020 Remedial Investigation Work Plan
Appendices B-G - TWAAFA Data Gaps Work Plan 7/20/2020 Remedial Investigation Work Plan
Appendix A - Boring, Well, and Test Pit Logs - TWAAFA Data Gaps Work Plan 7/20/2020 Remedial Investigation Work Plan
Final Data Gaps Work Plan, Taylor Way and Alexander Avenue Fill Area Site 7/20/2020 Remedial Investigation Work Plan
Taylor Way & Alexander Ave Fill Area - Groundwater Monitoring Well Replacement 7/8/2020 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Comments on the Final Data Gaps Work Plan Dated June 2020 6/19/2020 Site Specific Administrative Document - other (Administrative correspondence)
Taylor Way & Alexander Ave Fill Area - Agreed Order Signature Page or Confirmation Deadline Extension 6/19/2020 Site Specific Administrative Document - other (Administrative correspondence)
Interim Action Completion Report 6/5/2020 Interim Action Documents
Taylor Way & Alexander Ave Fill Area - Comments on Environmental Covenant 5/28/2020 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Ecology Response to Port of Tacoma Re: Ave 55 VI 5/11/2020 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA - Ecology Comments on Post-Construction Vapor Intrusion Assessment 4/16/2020 Site Specific Administrative Document - other (Administrative correspondence)
Burlington Environmental LLC Tacoma - Annual Progress Report 2019 4/15/2020 Site Specific Technical Document - other
2019 Annual Progress Report, Stericycle Environmental Solutions, Tacoma Facility 4/15/2020 Groundwater Monitoring Report
New Office Building Construction - Air Sampling, Stericycle Tacoma Facility 4/10/2020 Site Specific Technical Document - other
TWAAFA - Ecology Response to DOF 4/6/2020 Site Specific Administrative Document - other (Administrative correspondence)
Data Gaps Work Plan, Response to Comments 3/20/2020 Site Specific Technical Document - other
Supplemental Post-Construction Vapor Intrusion Assessment, 1514 Taylor Way Development, Tacoma, Washington 3/10/2020 Site Specific Technical Document - other
Ecology Comments on the Revised Data Gaps Work Plan 1/8/2020 Site Specific Administrative Document - other (Administrative correspondence)
Sampling Plan Addendum for Post-Construction Vapor Intrusion Assessment, 1514 Taylor Way Development, Tacoma, WA 1/7/2020 Site Specific Technical Document - other
Ecology Comments on Summary of Sub-Slab Soil Vapor Assessment, Response to Submittal of Draft Environmental Covenant, and List of Remaining Deliverables 11/14/2019 Site Specific Administrative Document - other (Administrative correspondence)
Notification of Project Coordinator Designation 9/25/2019 Site Specific Administrative Document - other (Administrative correspondence)
New Office Building Construction - Crawlspace Air Sampling, Stericycle Tacoma Facility 8/19/2019 Site Specific Technical Document - other
Interim Action Cleanup Report_2019 5/1/2019 Interim Action Documents
Annual Progress Report - 2018 4/16/2019 Groundwater Monitoring Report
Stericycle Tacoma 2018 Annual Progress Report 4/16/2019 Site Specific Technical Document - other
Revised Data Gaps Work Plan 1/29/2019 Remedial Investigation Work Plan
Data Gaps Work Plan Appendix H-L 1/29/2019 Remedial Investigation Work Plan
Data Gaps Work Plan Appendix B 1/29/2019 Remedial Investigation Work Plan
Data Gaps Work Plan Appendix A 1/29/2019 Remedial Investigation Work Plan
Summary of Sub-Slab Soil Vapor Assessment, 1514 Taylor Way, Tacoma, WA 12/4/2018 Site Specific Technical Document - other
TWAAFA Change of Project Coordinator Designation 10/18/2018 Site Specific Administrative Document - other (Administrative correspondence)
TWAAFA-Contacts List 9/24/2018 Site Specific Administrative Document - other (Administrative correspondence)
Sampling Plan Addendum for Vapor Intrusion Assessment, 1544 Taylor Way, Tacoma, WA 8/10/2018 Site Specific Technical Document - other
Ecology Comments on the Data Gaps Work Plan, Response to Comments 8/3/2018 Site Specific Administrative Document - other (Administrative correspondence)
Summary of Soil Vapor Survey Data and Vapor Mitigation Plan for the 1514 Taylor Way Site 6/8/2018 Site Specific Technical Document - other
Annual Progress Report January 1,2017-December 31, 2017 4/10/2018 Progress Report
Annual Progress Report 2017, Stericycle Environmental Solutions, Inc., Tacoma Facility 4/10/2018 Groundwater Monitoring Report
Ecology Response to DOF Proposed Schedule 4/2/2018 Site Specific Administrative Document - other (Administrative correspondence)
2017.07.20_Taylor Way & Alexander Ave_Plan Deadline Extension letter 7/20/2017 Site Specific Administrative Document - other (Administrative correspondence)
1514 Taylor Way Development Interim Action Work Plan 6/12/2017 Interim Action Documents
Geotechnical Report, Taylor Way and Lincoln Avenue Industrial Sites, Taylor Way and Lincoln Avenue 4/10/2017 Site Specific Technical Document - other
Stericycle Vapor Mitigation System, 1701 Alexander Ave. E., Tacoma, WA 8/8/2016 Site Specific Technical Document - other
Revised Soil Vapor Sampling, Stericycle Tacoma Facility 7/26/2016 Site Specific Technical Document - other
Vapor Mitigation System Design Response to Comments, Stericycle Tacoma Facility 7/18/2016 Site Specific Technical Document - other
Stericycle Tacoma facility 2nd quarter 2016 Groundwater Monitoring Event 7/12/2016 Groundwater Monitoring Report
Tacoma Stericycle Facility, Lab Pack Building, Vapor Mitigation System Preliminary Design Overview 6/10/2016 Site Specific Technical Document - other
Soil Vapor Sampling, Stericycle Tacoma Facility 5/13/2016 Site Specific Technical Document - other
TWAAFA - Media Management Plan, Puget Sound Energy, Liquid Natural Gas Pipeline Construction, Tacoma/Fife, Washington 11/24/2015 Site Specific Technical Document - other
Proposed Prospective Purchaser Agreement, Former CleanCare Site 6/27/2014 Site Specific Administrative Document - other (Administrative correspondence)
Permit for the Storage and Treatment of Dangerous Waste Permit No.: WAD020257945 3/22/2012 Site Specific Technical Document - other
Data Summary and Conceptual Site Model, Taylor Way and Alexander Avenue Fill Site, Tacoma, WA 7/1/2008 Remedial Investigation Report
Feasibility Study, ProLogis Taylor Way Property 12/1/2006 Feasibility Study
Remedial Investigation, ProLogis, Taylor Way Property 10/3/2006 Remedial Investigation Report
CleanCare Memorandum re: groundwater monitoring results 6/30/2003 Groundwater Monitoring Report
Clean Care Corp Site Hazard Assessment 2/1/2002 Site Hazard Assessment Report
Don Oline Landfill CleanCare PLP Search Documentation, Volume 2 10/12/2001 Site Specific Technical Document - other
Don Oline Landfill CleanCare PLP Search Documentation, Volume 1 10/12/2001 Site Specific Technical Document - other
CleanCare Facility, Subsurface Soil Data 10/2/2000 Site Specific Technical Document - other
Health Consultation, CleanCare Corporation Site 1/26/2000 Human Health and/or Eco Risk Assessment
Groundwater Monitoring Plan, CleanCare Corp., Tacoma, WA 10/14/1995 Site Specific Technical Document - other
CleanCare Corporation Quarterly Report, 2nd Quarter 1995 7/14/1995 Site Specific Technical Document - other
Tacoma Cogeneration Project Phase 2 Site Assessment 5/16/1991 Remedial Investigation Report
Geotechnical Engineering Study, Proposed Storage Facility, Tacoma, WA 9/11/1990 Site Specific Technical Document - other
RCRA Facility Assessment PR/VSI Report Appendices 2/1/1990 Site Specific Technical Document - other
RCRA Facility Assessment PR/VSI Report, ChemPro, NW Processing, Sol-Pro, ChemPro Parcel A 2/1/1990 Site Specific Technical Document - other
Northwest Processing Well Monitoring 6/1/1989 Groundwater Monitoring Report
Taylor Way & Alexander Ave Fill Area - Phase II Hydrogeological Investigation Parcel A & Work Plan 4/1/1988 Site Specific Technical Document - other
L-1 througn L-5 boring logs 2/2/1987 Site Specific Technical Document - other
Preliminary Assessment, Past Practices in the Vicinity of the Poligen Facility, Port of Tacoma, WA 5/1/1986 Site Specific Technical Document - other
Preliminary Nitric Acid Spill Residual Impact Evaluation, Poligen Site, Port of Tacoma, WA 3/19/1986 Site Specific Technical Document - other
Chemical Processors Well Monitoring 3/1/1986 Groundwater Monitoring Report
Tacoma Off-Plant Disposal Sites Groundwater Investigation 2/1/1984 Groundwater Monitoring Report
Revised Hydrogeologic Study, Poligen Site, Port of Tacoma 12/21/1983 Site Specific Technical Document - other
Solvent Spill - July 1, 1981 7/6/1981 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Southwest Regional Office
    300 Desmond Dr SE
    Lacey, 98503-1274
    Please schedule an appointment to view print documents at this location.

Contaminants 14

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Halogenated Organics C C
Metals - Metals Priority Pollutants C C
Metals - Metals - Other C C
Halogenated Organics - Polychlorinated biPhenyls (PCB) C S
Non-Halogenated Organics - Petroleum Products-Unspecified C C
Non-Halogenated Organics - Phenolic Compounds C C
Non-Halogenated Organics - Non-Halogenated Solvents C C
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons B C
Halogenated Organics - Halogenated Solvents S
Reactive Wastes - Corrosive Wastes C C
Halogenated Organics - Other Halogenated Organics C C
Non-Halogenated Organics - Other Non-Halogenated Organics C C S
Non-Halogenated Organics - Petroleum-Gasoline S
Non-Halogenated Organics - Petroleum-Other C C S
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.