Facility Site ID: 1880040 Cleanup Site ID: 2008

Lora Lake Apartments Cleanup Update – February 2022

Cleanup completed in January 2020.

Ecology finalized the Lora Lake Apartments Site Construction As-Built Report in January 2021. The cleanup work was conducted over two construction seasons: April to December 2017, and July 2019 to January 2020.

View the Construction As-Built Report:

Construction As-Built Report  

The Port of Seattle (Port) and consultants prepared a Compliance Monitoring Plan to ensure cleanup methods are meeting cleanup standards. Annual compliance monitoring commenced in 2018 and is ongoing. The first 5-year periodic review will assess the appropriate monitoring frequency for the following 5 years.

 

What Was Included In The Final Cleanup Action?

The Port removed or contained contaminated soil and sediment starting in December 2017. The cleanup was done in three areas.

Lora Lake Apartments Parcel
The Port removed approximately
42,000 tons of highly contaminated soil for disposal and placed a temporary barrier over the entire parcel. The barrier prevents wildlife and humans from coming in contact with the contaminated soil. A deed restriction (environmental covenant) limits the use of the site to commercial activities and ensures that future activities will not expose the capped contamination. Removal of highly contaminated soil resulted in cleanup of groundwater.
 
1982 Dredged Material Containment Area
The Port covered contaminated sediment deposited from a past dredging of Lora Lake with a porous pavement that prevents wildlife and humans from contacting the contamination. An environmental covenant will ensure that the cover is maintained.
 
Lora Lake Parcel

The Port addressed contaminated lake sediments and shallow soil along the western boundary of the parcel. 

Lake Sediment: The lake
was restored to a wetland by placing approximately 58,200 tons of sand, 44.5 tons of granular activated carbon, and 6,200 cubic yards of topsoil over contaminated sediments contained at the bottom of the lake. Restoration of the lake to a wetland prevents contaminants from entering surface water that flows to Miller Creek. The restored wetland surface was stabilized with biodegradable erosion control fabric and approximately 4,100 woody wetland plants were planted and integrated into the surrounding wetlands. An environmental covenant ensures that the wetland will be maintained.
 
Shallow Soil: 
Approximately 1,250 tons of contaminated soil were excavated from the LL Parcel and disposed of off-site. No contamination remains in these areas.

Site Information And Background

1936. Future Site of Lora Lake Apartments (green dotted line) and Lora Lake (blue dotted line)
1936. Future Site of Lora Lake Apartments (green dotted line) and Lora Lake (blue dotted line)

The 18-acre site is located at 15001 Des Moines Memorial Drive in Burien, Washington 98148. This site is on Port property at the former Lora Lake Apartments and at Sea-Tac Airport nearby.

  • Mid-1940s–Mid 1980s: A barrel-cleaning company followed by an auto-wrecking facility operated on site.
  • 1987: A 22-building apartment complex was built.
  • 1998: The Port acquired the property as part of a Sea-Tac runway protection zone. The portion of the site that was not required for the Runway Protection Zone is slated to be redeveloped.
  • 2007: The Port demolished six buildings. Environmental samples prior to demolition showed higher-than-expected levels of contaminants.
  • 2009: Ecology and the Port entered into an Agreed Order, under which the Port agreed to conduct a Remedial Investigation/Feasibility Study to understand the nature and extent of the contamination. The Port also demolished remaining above-ground structures and took measures — with Ecology oversight — not to disturb potentially contaminated soil.
  • 2013: The Agreed Order was amended to require the Port to prepare the Draft Cleanup Action Plan.
  • 2015. Ecology and the Port entered into a Consent Decree that included Ecology’s final Cleanup Action Plan.
  • 2016. The Port finalized the Engineering Design Report, which includes a detailed plan and specifications for the proposed cleanup actions.
  • 2017. Construction Season 1 was completed.
  • 2020. Construction Season 2 was completed.
  • 2022. Environmental Covenants were recorded with King County.
  • 2025. Ecology will conduct the first Periodic Review.

Community Profile

The U.S. Environmental Protection Agency (EPA) has developed an environmental justice (EJ) mapping and screening tool called EJSCREEN. It is based on nationally consistent data and an approach that combines environmental and demographic indicators in maps and reports. See below for information about demographics in the area of Lora Lake Apartments, Burien.

EJSCREEN Census Block Map - This map shows the Census Blocks used to generate the reports below.

EJSCREEN ACS Summary Report Lora Lake Apartments – This report shows the demographic information about the population of the area.

EJScreen Report Lora Lake Apartments – This report shows the values for environmental and demographic indicators and EJSCREEN indexes. These percentiles provide perspective on how the selected block group or buffer area compares to the entire state, EPA region, or nation.
 
You can also check 
What’s in My Neighborhood to learn about other cleanups in your area. 

What Are The Contaminants?

1980. Burien Auto Wrecking (1950's - 1980's)
1980. Burien Auto Wrecking (1950's - 1980's)

In the 1940s and 1950s, the site was used for cleaning barrels that had contained chemicals. From about the mid-1950s to 1981, the site was used for auto wrecking. Former activities at the site released hazardous chemicals into the environment: the soil, groundwater and sediment at the Lora Lake Apartments site. The contaminants include the following: 

  • polycyclic aromatic hydrocarbons
  • lead
  • petroleum products
  • arsenic
  • pentachlorophenol
  • dioxins/furans

 More information about these contaminants is available at the Agency for Toxic Substances & Disease Registry’s website.

Legal 9
Document Title Document Date Document Type
Lora Lake EC Sunnydale Parcel 1/26/2022 Environmental Covenant; Alternative Mechanism
Lora Lake EC LL Parcel 1/26/2022 Environmental Covenant; Alternative Mechanism
Lora Lake EC LL Apartment Parcel 1/26/2022 Environmental Covenant; Alternative Mechanism
lora lake EC DMCA Parcel 1/26/2022 Environmental Covenant; Alternative Mechanism
2015 Final Consent Decree with CAP 9/9/2015 Administrative Order on Consent
Lora Lake Apartments - Amended Agreed Order (April 18, 2013) 4/18/2013 Agreed Order Amendment
Lora Lake Apartments Agreed Order 7/10/2009 Agreed Order
PLP Waiver 3/5/2009 Agreed Order
Notice of Potential Liability under the Model Toxics Control Act 2/3/2009 Agreed Order
Public Information 24
Document Title Document Date Document Type
EJSCREEN Report Lora Lake Apartments 1/4/2017 Fact Sheet\Public Notices
EJSCREEN ACS Summary Report Lora Lake Apartments 1/4/2017 Fact Sheet\Public Notices
EJSCREEN Census Block Map Lora Lake Apartments 1/4/2017 Fact Sheet\Public Notices
Lora Lake Power Point Presentation 2015 5/13/2015 Multimedia
Lora Lake Power Point May 2015 5/13/2015 Multimedia
Lora Lake Apartments Comment Period Flyer 4/24/2015 Fact Sheet\Public Notices
Responsiveness Summary, Lora Lake Apartments Site, Public Comment Period October 25, 2013 - January 15, 2014 1/9/2015 Responsiveness Summary
Lora Lake Apartments Public Comment Period Extension to January 15, 2014 12/10/2013 Fact Sheet\Public Notices
Lora Lake Apartments - Public Participation Plan 2013 10/25/2013 Public Participation Plan
Lora Lake Apartments - Consent Decree Fact Sheet 10/25/2013 Fact Sheet\Public Notices
Lora Lake Apartments - Responsiveness Summary for the Proposed First Amendment to Agreed Order No. 6703 5/3/2013 Responsiveness Summary
Lora Lake Apartments - Amended Agreed Order Fact Sheet (Dec. 2012) 12/21/2012 Fact Sheet\Public Notices
Lora Lake Apartments Responsiveness Summary 7/1/2010 Responsiveness Summary
Lora Lake Apartments AirMail Spring 2010 5/1/2010 Fact Sheet\Public Notices
Vietnamese Lora Lake Apartments Fact Sheet RI/FS 4/1/2010 Fact Sheet\Public Notices
Spanish Lora Lake Apartments Fact Sheet RI/FS 4/1/2010 Fact Sheet\Public Notices
Lora Lake Public Participation Plan 4/1/2010 Public Participation Plan
Lora Lake Apartments Fact Sheet RI/FS 4/1/2010 Fact Sheet\Public Notices
Vietnamese Lora Lake Apartments Interim Action Work Plan 11/1/2009 Fact Sheet\Public Notices
Spanish Lora Lake Apartments Fact Sheet Interim Action Work Plan 11/1/2009 Fact Sheet\Public Notices
Lora Lake Apartments Fact Sheet Interim Action Work Plan 11/1/2009 Fact Sheet\Public Notices
Lora Lake Apartments Public Participation Plan 9/24/2009 Public Participation Plan
Lora Lake Apartments Responsiveness Summary 8/1/2009 Responsiveness Summary
Air Mail Empty Lora Lake Apartment buildings to be removed 6/30/2009 Fact Sheet\Public Notices
State Environmental Policy Act 1
Document Title Document Date Document Type
Lora Lake Apartments - SEPA Checklist and Mitigated DNS 10/25/2013 SEPA Documents
Technical Reports 184
Document Title Document Date Document Type
2023 Annual Compliance Monitoring Report 12/30/2023 Progress Report
2022 Annual Compliance Monitoring Report 11/30/2022 Performance/Confirmational Monitoring Plan or Report
2021 Annual Compliance Monitoring Report_2021-1027 10/1/2021 Performance/Confirmational Monitoring Plan or Report
2020 Annual Compliance Monitoring Report 3/19/2021 Performance/Confirmational Monitoring Plan or Report
01_POS-LLA_Construction As-Built Report_Text and Tables_2021-0122 1/20/2021 Construction Plans and Specifications
Lora Lake Arsenic Memo_2020-0817 8/17/2020 Performance/Confirmational Monitoring Plan or Report
May 2017 Monthly Progress Report 6/15/2017 Progress Report
April 2017 Monthly Progress Report 5/11/2017 Progress Report
MARCH 2017 Monthly Progress Report 4/7/2017 Progress Report
February 2017 MONTHLY PROGRESS REPORT 3/14/2017 Progress Report
JANUARY 2017 MONTHLY PROGRESS REPORT 2/15/2017 Progress Report
December 2016 Monthly Progress Report 1/16/2017 Progress Report
NOVEMBER 2016 MONTHLY PROGRESS REPORT 12/16/2016 Progress Report
Agreed Order Construction Stormwater General Permit 11/21/2016 Site Specific Technical Document - other
OCTOBER 2016 MONTHLY PROGRESS REPORT 11/15/2016 Progress Report
SEPTEMBER 2016 MONTHLY PROGRESS REPORT 10/19/2016 Progress Report
Notice of Intent, Construction Stormwater General Permit 10/7/2016 Site Specific Technical Document - other
AUGUST 2016 MONTHLY PROGRESS REPORT 9/13/2016 Progress Report
Engineering Design Report Appendices H-N (3 OF 3) (28.5MB) 9/1/2016 Engineering Design Report
Engineering Design Report through Appendix G (2 OF 3) (32MB) 9/1/2016 Engineering Design Report
Engineering Design Report Table of Contents (1 OF 3) (1.4MB) 9/1/2016 Engineering Design Report
2017 Lora Lake Apartments MTCA Remediation Projects - 100% Submittal 8/29/2016 Engineering Design Report
2017 Lora Lake Apartments MTCA Remediation Projects - Project Manual 8/29/2016 Engineering Design Report
July 2016 MONTHLY PROGRESS REPORT 8/16/2016 Progress Report
June 2016 MONTHLY PROGRESS REPORT 7/13/2016 Progress Report
Port of Seattle Nationwide 38 Permit from Army Corps of Engineers 7/5/2016 Site Specific Technical Document - other
May 2016 MONTHLY PROGRESS REPORT 6/13/2016 Progress Report
APRIL 2016 MONTHLY PROGRESS REPORT 5/13/2016 Progress Report
March 2016 MONTHLY PROGRESS REPORT 4/19/2016 Progress Report
February 2016 MONTHLY PROGRESS REPORT 3/10/2016 Progress Report
JANUARY 2016 MONTHLY PROGRESS REPORT 2/16/2016 Progress Report
Lora Lake Drawdown Test Memo 12/2/2015 Feasibility Study
UPDATED Lora Lake Data Summary Memo_final 12/1/2015 Remedial Investigation / Feasibility Study
Compliance Monitoring Plan, figure revisions Jan 2022 9/22/2015 Performance/Confirmational Monitoring Plan or Report
Demonstration of Groundwater Protection of Surface Water Beneficial Uses 3/17/2015 Site Specific Technical Document - other
Lora Lake 2013-2014 Surface Water - Groundwater Baseline Monitoring, Data Summary Memorandum 2/20/2015 Site Specific Technical Document - other
11 Appendices I-Q LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_3 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part26 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part25 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part24 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part23 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part22 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part21 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part20 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part19 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part18 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part17 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part16 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part15 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part14 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part13 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part12 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part11 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part10 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part09 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part08 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part07 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part06 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part05 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part04 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part03 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part02 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_2_Part01 1/16/2015 Remedial Investigation / Feasibility Study
10 Appendix H LLA FINAL RIFS_1 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_3 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part22 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part21 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part20 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part19 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part18 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part17 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part16 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part15 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part14 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part13 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part12 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part11 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part10 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part09 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part08 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part07 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part06 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part05 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part04 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part03 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part02 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_2_Part01 1/16/2015 Remedial Investigation / Feasibility Study
9 Appendix G LLA FINAL RIFS_1 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_03 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part65 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part64 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part63 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part62 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part61 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part60 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part59 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part58 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part57 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part56 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part55 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part54 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part53 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part52 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part51 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part50 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part49 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part48 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part47 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part46 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part45 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part44 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part43 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part42 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part41 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part40 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part39 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part38 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part37 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part36 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part35 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part34 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part33 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part32 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part31 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part30 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part29 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part28 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part27 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part26 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part25 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part24 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part23 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part22 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_02_Part21 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part20 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part19 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part18 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part17 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part16 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part15 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part14 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part13 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part12 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part11 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part10 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part09 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part08 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part07 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part06 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part05 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part04 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part03 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part02 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA Final RIFS_02_Part01 1/16/2015 Remedial Investigation / Feasibility Study
8 Appendix F LLA FINAL RIFS_01 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_09 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_08 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_07 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_06 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_05 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_04 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_03 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_02 1/16/2015 Remedial Investigation / Feasibility Study
7 Appendix E LLA FINAL RIFS_01 1/16/2015 Remedial Investigation / Feasibility Study
6 Appendix D LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
5 Appendix C LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
4 Appendix B LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
3 Appendix A LLA FINAL RIFS Appx A_3 1/16/2015 Remedial Investigation / Feasibility Study
3 Appendix A LLA FINAL RIFS Appx A_2 1/16/2015 Remedial Investigation / Feasibility Study
3 Appendix A LLA FINAL RIFS Appx A_1 1/16/2015 Remedial Investigation / Feasibility Study
2 Figures PDF LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
1 Text and Tables LLA FINAL RIFS 1/16/2015 Remedial Investigation / Feasibility Study
Proposed Sediment Cleanup Levels for the Lora Lake Parcel Protective of Human Health Risk 12/29/2014 Site Specific Technical Document - other
Work Plan for Hydrogeologic Data Collection at the Lora Lake Parcel 4/2/2014 Remedial Investigation Work Plan
Lora Lake Apartments Public Meeting Poster Board November 7, 2013 11/7/2013 Site Specific Administrative Document - other (Administrative correspondence)
Lora Lake Parcel Soil Sampling Results 9/13/2013 Remedial Investigation / Feasibility Study
Lora Lake Apartments - Lora Lake Apartments Update 2012 7/10/2012 Site Specific Administrative Document - other (Administrative correspondence)
Lora Lake Parcel RI/FS Work Plan 2/11/2011 Remedial Investigation Work Plan
Lora Lake Apartments Technical Memorandum: Deep Monitoring Well Plan 8/23/2010 Site Specific Technical Document - other
Lora Lake Apartments RI/FS Work Plan 4/1/2010 Remedial Investigation Work Plan
Lora Lake Apartments Stormwater Interim Action Work Plan 11/17/2009 Site Specific Technical Document - other
Lora Lake Apartments Summary Report 2008 Investigations and Data Gap Evaluation 9/1/2009 Site Specific Technical Document - other
Lora Lake Appartment Buildings Construction Stormwater Polution Prevention Plan 8/14/2009 Site Specific Technical Document - other
There may be more documents related to this site. To obtain documents not available electronically, you will need to make a public records request.

Places to see print documents

  • Northwest Regional Office
    15700 Dayton Ave N
    Shoreline, 98133
    Please schedule an appointment to view print documents at this location.
  • Burien Public Library
    400 SW 152nd Street
    Burien, 98166
    This location may only have print documents available during open comment periods.

Contaminants 8

Contaminant Type
Soil
Groundwater
Surface Water
Air
Sediment
Bedrock
Halogenated Organics - Halogenated Organics C
Metals - Metals Priority Pollutants C C
Metals - Metals - Other B
Non-Halogenated Organics - Petroleum Products-Unspecified C C
Halogenated Organics - Dioxins/Furans C C
Non-Halogenated Organics - Polycyclic Aromatic Hydrocarbons C B
Halogenated Organics - Halogenated Solvents C
Metals - Arsenic C C
S
Suspected
C
Confirmed Above Cleanup Levels
B
Below Cleanup Levels
RA
Remediated-Above
RB
Remediated-Below
R
Remediated
This contaminant list was based on our best information at the time it was entered. It may not reflect current conditions at the site.